Desiro360
Member
There are currently severe Overhead Wire problems on the West Anglia Main Line at Sawbridgeworth. All Stansted Express and Liverpool St - Cambridge services this morning have been cancelled.
http://www.nationalexpresseastangli...ge-stansted-airport-until-approximately-11-00
Also a train (I think the 07:40 Norwich - Liverpool St Intercity) has failed near Diss on the Great Eastern Main Line causing 40 minute delays.
You have to feel sorry for the commuters on yet another day of National Express chaos.
http://www.nationalexpresseastangli...ge-stansted-airport-until-approximately-11-00
Also a train (I think the 07:40 Norwich - Liverpool St Intercity) has failed near Diss on the Great Eastern Main Line causing 40 minute delays.
You have to feel sorry for the commuters on yet another day of National Express chaos.
units' electrical systems were designed such that when the overhead supply was lost and the unit had to rely on battery supplies, the control system would trip the various non-essential circuits as time passed and the batteries discharged. Crucially, the Low Voltage Relay (LVR) would sense the battery voltage and drop out all the electrics when the battery voltage fell to 76 V dc from the normal, nominal 96 V dc (sometimes referred to as 110 V dc, but actually 96V dc). The purpose of this was to enable the auxiliary compressor to be run from the batteries when the OHL was restored, so that the pantograph could be raised.