ananaspenguin
New Member
Unfortunately, they are vertical scanners. But, they did get my QR code first time, rather than aeons of repositioning like at Victoria!
Welcome to the forum. Your first post I see.Unfortunately, they are vertical scanners. But, they did get my QR code first time, rather than aeons of repositioning like at Victoria!
Made by whom?It is due to open at the December timetable change, supposedly with booked calls. Delay is apparently down to Northern attempting to make the platform self dispatch, but instead they have been made to recruit extra dispatch staff.
RMT and Network Rail I presume.Made by whom?
Doubt NR would care.RMT and Network Rail I presume.
Any reason specifically? Or are they aligned on saying there needs to be a dispatched for a completely straight flat platform that probably won't be that busy?We also have ASLEF drivers refusing to use the new platform despite the signalling not actually being altered just to fend off the RMT bashing.
Probablly not as part of normal service patterns, but I could see it getting used in disruption or perhaps for stabling. IIRC the signalling was already there so may as well have the stop board to go with it.do they plan on using it as a terminating platform then
Was there talk of the current Leeds to Wigan service terminating there at one point, obviously then would need a local service to cover Manchester-Atherton-Wigan serviceProbablly not as part of normal service patterns, but I could see it getting used in disruption or perhaps for stabling. IIRC the signalling was already there so may as well have the stop board to go with it.
It is impossible to go North from Platform 3, you can reverse from either Manchester route, but not go towards Bolton from it.Also not an S car stop board at northern end of platform, do they plan on using it as a terminating platform then
Was there talk of the current Leeds to Wigan service terminating there at one point, obviously then would need a local service to cover Manchester-Atherton-Wigan service
Atherton probably won't be a Piccadilly service, a Southport to Oxford Road service via Atherton has been mooted, however this may not start until after 2031 due to the remodling of Oxford Rd.Salford Central will go live for the Leeds service (Dec? May?) - soon enough, so would the Atherton be a Piccadilly service? Similar to the Southport?
As Wigan-Bolton-Stalybridge is the (newly) EMU plan, correct?
Oxford Road isnt getting done by then.Atherton probably won't be a Piccadilly service, a Southport to Oxford Road service via Atherton has been mooted, however this may not start until after 2031 due to the remodling of Oxford Rd.
If the above is the case from timetable change then I have a few questions:
1> What's going to happen to the current Headbolt Lane-Blackburn via Todmorden services will they just be cut back to operate Victoria-Blackburn via Todmorden?
2> Will 158s still operate to/from Wigan from Leeds?
If the above is the case from timetable change then I have a few questions:
1> What's going to happen to the current Headbolt Lane-Blackburn via Todmorden services will they just be cut back to operate Victoria-Blackburn via Todmorden?
2> Will 158s still operate to/from Wigan from Leeds?
. No Leeds trains to Salford Crescent in the current plans.Why are the turnbacks even necessary, compared to just using A/B ends at Victoria?
Is Victoria just too busy for it now, I remember it happening a lot in the 201Xs, but now very rarely see A/B end trains.
When that occurs, how many trains each hour will call at Ashton-under Lyne and what services will they be?Stalybridge to Vic shuttle has been postponed
From what i'd head is the same service pattern GhostManDN91 had posted. The Stalybridge service would be an EMU to from Wigan via Bolton rather than a shuttle. They would not need to use the Brewery Junction turnback as its a through service.The Blackburn portion of the Headbolt Lane is another that will turn back at Salford Central.. No Leeds trains to Salford Crescent in the current plans.
Stalybridge to Vic shuttle has been postponed
Initially the Wigan Bolton Vic trains as a EMU won't be able to use the new turn back at Brewery Junction as it's complete but has no wires unfortunately
The Northern Airport - Cumbria (Windermere/Barrow/Corkickle), and the TPE Airport - Scotland (Edinburgh/Glasgow) will continue to not stop.From the timetable change are there any services that will pass through (not stop) at Salford Crescent? As before Platform 3 was built or even thought of that was what the current track was actually used for