Some welcome news for those seeking escape when things go wrong on GTR, in that, as from the December timetable change, on weekdays, the 2240hrs and 2333hrs LNER services from Kings Cross, will both pick up and set down at Srevenage.
I think that the allocation of such revenue is generally based on survey data, but doubt that such use would be measured due to its rarity. Moreover, as both operators are now nationalised, I hope that nobody loses any sleep over a few wooden dollars for the sake of making the weary passenger happy! We might even increase overall industry revenue by doing so.I saw the Stevenage MP announce this and wonder how LNER will share any revenue from those using contactless. Of course at that time of night, many people won't bother to buy a ticket anyway!
My 2026 commute stats are now 25 hours of commuting delays and 59.62% of commutes delayed.Back from holiday - and the 0946 off Ely ran this morning, at least.
However, I note Littleport, Downham Market, Watlington *and* Waterbeach are now all in the bottom 10 stations *in the country* at ontimetrains, which is pretty incredible really.
View attachment 212800
I've asked the FLUA Secretary about its origins. I can't find the document anywhere on the GTR or Network Rail websites, nor on the MPs' sites. Perhaps it was circulated to a limited number of stakeholders. If and when I get more intelligence about it, I'll post it here.
As usual, understating the severe impact of the crappy, unprepared procurement of the 379s and links to pantograph/OHLE damage…It's now available on the FLUA website at https://www.flua.org.uk/Fen line action plan Sep 2026.pdf so I think that clears up any questions about its legitimacy.
As usual, understating the severe impact of the crappy, unprepared procurement of the 379s and links to pantograph/OHLE damage…
Except the overhead wire problems only affected the 379 stock and nothing else that ran between Ely and Cambridge under the wires.Yes - they should’ve said ‘the 379s fell apart before we could get them out the field they had been sat in for a few years and Network Rail’s continuing overhead wire problems are ruining our pantographs’
Do be serious
Except the overhead wire problems only affected the 379 stock and nothing else that ran between Ely and Cambridge under the wires.
Sorry let me clarify, by nothing else I meant other types of stock.Well that is what happens when the fault is between Ely and King’s Lynn
On a related note, GN have finally managed to top the 'worst of all stations' leaderboard on ontimetrains. And grabbed places 3,5 and 6 as well! Quite an impressive 'achievement'.
View attachment 213339
Yesterday evening we nearly got a unicorn - 1T48 was on-time at Letchworth, and the stopper (1C80) and semifast TL (9S42) ahead were both on-time too.
But by Cambridge everything was between 6 and 9 minutes late. Why? Because the Barrington freight train *that reverses at Foxton in the middle of the evening peak* was late. I'm not sure I'd fully appreciated before that they try to fit a freight *reversal* in the middle of this really busy line, that already is the cause of many delays, right in the middle of the evening peak. No doubt this is brought to us by the same people who think it a good idea to push freight services through 13/14 at Manchester Piccadilly right in the middle of the evening peak.
As to why the freight was late, looks like that was due to waiting for 1T49 (1641 KLN-KGX) which passed Foxton 6 minutes late after being delayed entering the single section at Downham Market because 1T40 (the 1524 KGX-KLN) was late getting to Littleport. And *that* was late because it was stuck between Letchworth and Cambridge behind the late-running 9S34 (1344 BTN-CBG) which lost a few minutes between Gatwick and East Croydon, apparently because it was stuck behind 1B35 (the 1256 Bognor to VIC) which waited to depart from Gatwick Airport for a couple of minutes longer than timetabled, for whatever reason.
On other words, a Southern train from Bognor, dwelling at Gatwick Airport for a couple of minutes longer than timetabled, directly results in non-trivial delays for hundreds of commuters on three consecutive trains trying to get home to Cambridge/Ely/etc., over 4 hours later. You can see how easy it is for GN services to run into problems, and while a lot of issues are directly down to them, the total fragility of this timetable is ludicrous.
On other words, a Southern train from Bognor, dwelling at Gatwick Airport for a couple of minutes longer than timetabled, directly results in non-trivial delays for hundreds of commuters on three consecutive trains trying to get home to Cambridge/Ely/etc., over 4 hours later. You can see how easy it is for GN services to run into problems, and while a lot of issues are directly down to them, the total fragility of this timetable is ludicrous.
A return trip from Cambridge to Bournemouth at the weekend provided two perfect examples of how the King's Lynn trains are disadvantaged at every turn.
Last Friday the up 1T29 (already running 17 mins late) was within sight of P8 at CBG when the 9S33 to Brighton was let out just in front of it. No chance of making up any time after that and it was 21 down at Hitchin. Driver was obvious not best pleased and made a heartfelt Delay Repay announcement on arrival at KGX 20 late. 9S33 in contrast was nowhere more than 2 late (and arrived on time) so at least that did not suffer.
On return journey on Monday 1T34 was on time as far as Letchworth until it caught up with the late running 9S28, and then had to crawl along arriving CBG 9 mins down. Further delays (dried-out peat?) meant it eventually arrived KLN 17 late which will no doubt have had further knock-on effects.
The timetabled headway between 9S28 and 1T34 arriving in Cambridge is only 4 mins which does not make any realistic allowance for a train coming all the way from Brighton to be the slightest late. What were they smoking when this crackpot timetable was devised?
Poor EMR. On the list because XC don’t manage any stations.Back from holiday - and the 0946 off Ely ran this morning, at least.
However, I note Littleport, Downham Market, Watlington *and* Waterbeach are now all in the bottom 10 stations *in the country* at ontimetrains, which is pretty incredible really.
View attachment 212800
The timetabled headway between 9S28 and 1T34 arriving in Cambridge is only 4 mins which does not make any realistic allowance for a train coming all the way from Brighton to be the slightest late. What were they smoking when this crackpot timetable was devised?
I fear it is going to be even worse than now in the down direction if they stick to the pattern of the proposed timetables - which have the fast services almost catching up to the semi-fasts between Hitchin and Cambridge, and the semi-fasts almost catching up to the stoppers - to the degree that the semi-fast is due to arrive at Cambridge just 4 minutes after the stopper, and then the fast just 4 minutes after the semi-fast. It looks almost designed to cause continual delays to the fasts.
On the latter point, this was discussed in considerable volume here before 2018, with the prediction made by many of us that the combination of Thameslink through services, Welwyn, Hitchin-Cambridge variation of stopping patterns, and the single-line sections north of Ely, would produce exactly this outcome. And here we are.
...the various rail user groups and associated social media groups along the length of the GN route, who are in various stages of despair at the dependability of the service, just in case anyone feels that the views here are not typical of regular users.
I really think the only way to fix the problem is have Kings Lynn trains shuttling to/from Cambridge and then try and make it easy to connect to other services south - including the original Cambridge Cruiser, the semi-fast train to Brighton, or the stopper to KGX.
No splits and joins, and no drivers out of position because of issues miles away. Get the reliable stock to run, with a backup unit or two, a spare driver or two, and then see how that fares.
I get that people may not like the need to change train, but surely that would be less inconvenient than the current setup which clearly can't work when there's so much to go wrong even before it heads north of Cambridge.
I really think the only way to fix the problem is have Kings Lynn trains shuttling to/from Cambridge and then try and make it easy to connect to other services south - including the original Cambridge Cruiser, the semi-fast train to Brighton, or the stopper to KGX.
No splits and joins, and no drivers out of position because of issues miles away. Get the reliable stock to run, with a backup unit or two, a spare driver or two, and then see how that fares.
I get that people may not like the need to change train, but surely that would be less inconvenient than the current setup which clearly can't work when there's so much to go wrong even before it heads north of Cambridge.
If there are speed restrictions due to the quality of the trackbed, at least the issues are contained to a degree. Things are more easy to predict.
Next, it looks like trains tend to depart Kings Lynn on time, but are delayed at the single-line section as they conflict with delayed down trains. I'd say hold the latter at Watlington until the on-time up train passes. Combined with the above, it would mean this one train that's delayed won't knock on to others.
That's where that extra capacity comes in. If you have at least one train waiting at the terminus or nearby sidings that can be pressed into service to cover for a delay, then the problem goes away; the late Down train can then come in when it does, and either work the next service, or replace the sidings train that just left.Such as the Down road you hold for it is then late on its return Up journey
If every half hour there are three down trains that are timetabled to arrive within 8 mins the corollary is that ATM there is a 22 min gap without any - from KGX/STP at least. Surely someone amongst "the people who actually do this for a living" can work out how to space them out a bit better even given all the constraints about crews and layover times. Or some AI tool.