You’re correct it has been plain lined into Platform 1.Is Stranraer station capable of handling two trains at once? I thought all the points had been disconnected leaving just a single line in and out. Happy to be corrected!
You’re correct it has been plain lined into Platform 1.Is Stranraer station capable of handling two trains at once? I thought all the points had been disconnected leaving just a single line in and out. Happy to be corrected!
You’re correct it has been plain lined into Platform 1.
With thanks to the excellent RAILSCOT website and photographer Colin Miller here is a photo of the new layout;Is Stranraer station capable of handling two trains at once? I thought all the points had been disconnected leaving just a single line in and out. Happy to be corrected!
You could put two trains in the platform if what’s left of the box was “opened”. Some sort of “special arrangement“ would be needed due to the lack of signals.Is Stranraer station capable of handling two trains at once? I thought all the points had been disconnected leaving just a single line in and out. Happy to be corrected!
The crossing would become pedestrian only: there are convenient roads bypassing it.Dunragit box also operates the local level crossing.
Distance/time from Newton Stewart to Barrhill and Stranraer is roughly the same. Remarkably, there’s a bus stop right outside Barrhill station, but it would have to reverse back to the main road from the station.Could anything be done with Barrhill station to increase ridership? A bus to/from Newton Stewart timed to connect with trains may have some potential, as it'd give a ~2h 45 journey time to Glasgow compared to the current ~4 hour connection options. Realistically running a rail-link bus to Newton Stewart is probably a lot more feasible from Stranraer than Barrhill if there's going to be a bus interchange there anyway, but there would be about a 40 minute penalty for northbound trips which is why Barrhill would be a more convenient location overall.
With thanks to the excellent RAILSCOT website and photographer Colin Miller here is a photo of the new layout;
While reassuring that 0.5tph is still possible post-rationalisation, I would be quite surprised if it actually happens. Maybe if there's a surplus of trains in the 156 replacement order. Would make the railway an actually useful service, since it'd match Citylink in frequency and speed while offering a potentially* more comfortable ride (with a bit of a price markup).
Source: https://www.railmagazine.com/news/r...ine-to-improve-resilience-argues-network-railPassing loops on the Stranraer line will be removed if a Network Rail (NR) proposal goes ahead.
Five services a day on a two-hourly timetable currently serve the line from Ayr, with journeys taking 80 minutes.
NR plans to remove loops at Barrhill station, Glenwhilly and Dunragit, resulting in a 38-mile stretch of plain single track between Girvan and Stranraer with a 60mph line speed. Semaphore signals and token machines would also be removed as part of the plans.
In a Network Change proposal, seen by RAIL, NR said: “We are identifying infrastructure that is no longer required, such as loops beyond Girvan, replacing much of the existing semaphore style signalling in this area replace with modern colour light LED signals, and exploring innovative technologies, such as train positioning systems, to improve safety and reliability.”
Signal boxes at Stranraer Harbour, Dunragit, Glenwhilly and Barrhill would also close.
NR has said the semaphores and token machines are “becoming increasingly difficult to maintain safely and reliably” with spare parts even sourced from museums.
When I mapped the route recently, I was surprised by how many completely unused loops it has. Was it still too busy for RETB when the other lines in Scotland got done?Source: https://www.railmagazine.com/news/r...ine-to-improve-resilience-argues-network-rail
It's not often that you see removal of passing loops being suggested in order to increase reliability and resilience.
Might be a hot take, but is perhaps the only reason that spares are coming from museums because they can't be bothered making them?
Network Rail have rights to all the drawings for semaphore signals so surely, with all of the manufacturing capability we have today, it's not beyond the whit of man to make something we made 100 years ago without all this equipment?
Taking a peek at what’s involved in becoming a supplier to NR explains why its supply chain is so expensive. I can only guess at how many zeros it would add to manufacturing penny numbers of customised signalling components.Might be a hot take, but is perhaps the only reason that spares are coming from museums because they can't be bothered making them?
Taking a peek at what’s involved in becoming a supplier to NR explains why its supply chain is so expensive. I can only guess at how many zeros it would add to manufacturing penny numbers of customised signalling components.
On a line that must already have a huge subsidy, I can understand the cost of those parts being an unwelcome contributory factor.