• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Stranraer line engineering works: station and infrastructure works.

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

3RDGEN

Member
Joined
6 Mar 2023
Messages
669
Location
Hull

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,509
Location
Moorpark, CA
Is Stranraer station capable of handling two trains at once? I thought all the points had been disconnected leaving just a single line in and out. Happy to be corrected!
You could put two trains in the platform if what’s left of the box was “opened”. Some sort of “special arrangement“ would be needed due to the lack of signals.

== Doublepost prevention - post automatically merged: ==

Dunragit box also operates the local level crossing.
The crossing would become pedestrian only: there are convenient roads bypassing it.

To clarify re Stranraer itself, the plan I saw showed it getting a small “box” with, presumably, a workstation and some siding/run-round capability, part of which would be the remaining track in the current station.
 

Farigiraf

Established Member
Joined
23 Jul 2023
Messages
1,240
Location
Bridge on the River Cam
While reassuring that 0.5tph is still possible post-rationalisation, I would be quite surprised if it actually happens. Maybe if there's a surplus of trains in the 156 replacement order. Would make the railway an actually useful service, since it'd match Citylink in frequency and speed while offering a potentially* more comfortable ride (with a bit of a price markup).

*Class 156 seats + 1 transfer is less comfortable overall than a direct Citylink coach but this could change with new rolling stock

Having space for a bus interchange at a relocated Stranraer station is also great, as it'd improve connectivity to Portpatrick and the Rhins of Galloway, both of which are places which (while they do have low demand) are very cut-off from civilisation in general.

Could anything be done with Barrhill station to increase ridership? A bus to/from Newton Stewart timed to connect with trains may have some potential, as it'd give a ~2h 45 journey time to Glasgow compared to the current ~4 hour connection options. Realistically running a rail-link bus to Newton Stewart is probably a lot more feasible from Stranraer than Barrhill if there's going to be a bus interchange there anyway, but there would be about a 40 minute penalty for northbound trips which is why Barrhill would be a more convenient location overall.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,509
Location
Moorpark, CA
Could anything be done with Barrhill station to increase ridership? A bus to/from Newton Stewart timed to connect with trains may have some potential, as it'd give a ~2h 45 journey time to Glasgow compared to the current ~4 hour connection options. Realistically running a rail-link bus to Newton Stewart is probably a lot more feasible from Stranraer than Barrhill if there's going to be a bus interchange there anyway, but there would be about a 40 minute penalty for northbound trips which is why Barrhill would be a more convenient location overall.
Distance/time from Newton Stewart to Barrhill and Stranraer is roughly the same. Remarkably, there’s a bus stop right outside Barrhill station, but it would have to reverse back to the main road from the station.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,923
Location
"Marston Vale mafia"
While reassuring that 0.5tph is still possible post-rationalisation, I would be quite surprised if it actually happens. Maybe if there's a surplus of trains in the 156 replacement order. Would make the railway an actually useful service, since it'd match Citylink in frequency and speed while offering a potentially* more comfortable ride (with a bit of a price markup).

Created a speculative thread: https://www.railforums.co.uk/thread...line-be-made-more-useful-less-useless.308146/
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,751
Location
Scotland
Passing loops on the Stranraer line will be removed if a Network Rail (NR) proposal goes ahead.

Five services a day on a two-hourly timetable currently serve the line from Ayr, with journeys taking 80 minutes.

NR plans to remove loops at Barrhill station, Glenwhilly and Dunragit, resulting in a 38-mile stretch of plain single track between Girvan and Stranraer with a 60mph line speed. Semaphore signals and token machines would also be removed as part of the plans.

In a Network Change proposal, seen by RAIL, NR said: “We are identifying infrastructure that is no longer required, such as loops beyond Girvan, replacing much of the existing semaphore style signalling in this area replace with modern colour light LED signals, and exploring innovative technologies, such as train positioning systems, to improve safety and reliability.”

Signal boxes at Stranraer Harbour, Dunragit, Glenwhilly and Barrhill would also close.

NR has said the semaphores and token machines are “becoming increasingly difficult to maintain safely and reliably” with spare parts even sourced from museums.
Source: https://www.railmagazine.com/news/r...ine-to-improve-resilience-argues-network-rail

It's not often that you see removal of passing loops being suggested in order to increase reliability and resilience.
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,609
Source: https://www.railmagazine.com/news/r...ine-to-improve-resilience-argues-network-rail

It's not often that you see removal of passing loops being suggested in order to increase reliability and resilience.
When I mapped the route recently, I was surprised by how many completely unused loops it has. Was it still too busy for RETB when the other lines in Scotland got done?

It's got to be a challenge keeping that number of remote signal boxes staffed and working when the line has totally lost its main purpose.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,806
Location
Somewhere, not in London
Might be a hot take, but is perhaps the only reason that spares are coming from museums because they can't be bothered making them?

Network Rail have rights to all the drawings for semaphore signals so surely, with all of the manufacturing capability we have today, it's not beyond the whit of man to make something we made 100 years ago without all this equipment?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,923
Location
"Marston Vale mafia"
Might be a hot take, but is perhaps the only reason that spares are coming from museums because they can't be bothered making them?

Network Rail have rights to all the drawings for semaphore signals so surely, with all of the manufacturing capability we have today, it's not beyond the whit of man to make something we made 100 years ago without all this equipment?

I'm sure they could, but if trains never pass on this line what is the point? Single line, one engine in steam is simple and fine for this purpose, and will save a fortune, hopefully allowing the line to be retained.

Still amazes me they haven't plainlined Rufford to be honest - trains haven't passed there for ages.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,806
Location
Somewhere, not in London
Oh no disagreement with plain lining it, just the implication that sourcing parts difficulty being a contributing factor is complete nonsense.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,989
Location
Newport
Might be a hot take, but is perhaps the only reason that spares are coming from museums because they can't be bothered making them?
Taking a peek at what’s involved in becoming a supplier to NR explains why its supply chain is so expensive. I can only guess at how many zeros it would add to manufacturing penny numbers of customised signalling components.

On a line that must already have a huge subsidy, I can understand the cost of those parts being an unwelcome contributory factor.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,806
Location
Somewhere, not in London
Taking a peek at what’s involved in becoming a supplier to NR explains why its supply chain is so expensive. I can only guess at how many zeros it would add to manufacturing penny numbers of customised signalling components.

There are plenty of suppliers on the books capable of making 1 off small components to drawing.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,923
Location
"Marston Vale mafia"
On a line that must already have a huge subsidy, I can understand the cost of those parts being an unwelcome contributory factor.

If trains never pass on the line, even if they cost 50p they're a waste of money. Does anything ever pass at these loops e.g. in disruption? If not they bring nothing but maintenance cost.
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
12,026
Location
here to eternity
Discussion in this thread should be confined to what is actually happening.

There is a parallel speculation thread which can be found here. :)


 

WAB

Established Member
Joined
27 Jun 2015
Messages
1,308
Location
Anglia
I’m surprised by the comment about putting in a loop at Stranraer - is there really a charter market that would make this worthwhile?
 

50010 Monarch

Member
Joined
30 May 2010
Messages
91
Probably not, but if the plan to remove all loops from Girvan onwards goes ahead you have got a 75 mile single line siding (there and back). A loop at Stranraer at least provides some degree of flexibility.
 