Not initially anyway, that and stoke services using the bay are reliant on infrastructure changes.Which is what is happening.
Not initially anyway, that and stoke services using the bay are reliant on infrastructure changes.Which is what is happening.
The Northern 323s were as good as the West Mids sets when the Northern sets were maintained at Longsight, and Longsight also maintains the 390s.There was a reason why Soho ones were always better, one depot with one fleet which made everything easier.
Yes, not a dig at Allerton staff at all in my pervious post. I'm sure it's a tough job keeping these (somewhat) obsolete trains in traffic.The Northern 323s were as good as the West Mids sets when the Northern sets were maintained at Longsight, and Longsight also maintains the 390s.
I'm sure the staff at Allerton are doing the best they can, but as Soho and Longsight prove, the 323 fleet ether needs ether its own depot or a depot its share with only one other multiple unit type.
Train operator Northern is set to introduce 37 refurbished Class 350 trains onto its network, bringing air conditioning, increased capacity and a more comfortable journey to customers travelling across Manchester and the wider North West.
The trains, which will undergo a £25 million programme of improvements before entering service, will begin replacing Northern's existing 'Class 323' fleet from early 2028.
The newer trains will offer customers noticeable improvements, with air conditioning, more carriages, and luggage racks available when the trains enter service.
At-seat power points will also be available on many routes across the North West for the first time with the introduction of the newer trains.
They will also feature 'Variable Rate Sander (VRS)' technology, a new innovation that can cut the train's stopping distance by up to 50%, helping to keep services running reliably in slippery autumnal and wintery conditions.
Early 2028 seems terribly optimistic given it's mentioned above several times Northern won't be able to get hold of any until around December 2027. The July 2028 timetable change is the likely point for a few 323s to switch over, not early 2028. There is a possibility a small number of them may augment service around the football, which wraps up before the timetable change.Northern has issued media release, seems 350s won't be introduced until 2028
Refers to trains being overhauled at Northampton (presumably the Siemens depot)
![]()
Air conditioning, more space and more features: Northern to upgrade North West journeys with longer, better trains | Northern News
Train operator Northern is set to introduce 37 refurbished Class 350 trains onto its network, bringing air conditioning, increased capacity and a more comfortable journey to customers travelling across Manchester and the wider North West.media.northernrailway.co.uk
Agreed, I think back to how long training for the ex-WM 323s took before they could start running on services towards Blackpool, Liverpool, and Wigan.Early 2028 seems terribly optimistic given it's mentioned above several times Northern won't be able to get hold of any until around December 2027.
And that was only depots which didn't have 323s on their cards already, the 350s are brand new traction to northern so will take even longer.Agreed, I think back to how long training for the ex-WM 323s took before they could start running on services towards Blackpool, Liverpool, and Wigan.
Notable but not unexpected that the same press release says the trains will be fully GBR brandedNorthern has issued media release, seems 350s won't be introduced until 2028
Refers to trains being overhauled at Northampton (presumably the Siemens depot)
![]()
Air conditioning, more space and more features: Northern to upgrade North West journeys with longer, better trains | Northern News
Train operator Northern is set to introduce 37 refurbished Class 350 trains onto its network, bringing air conditioning, increased capacity and a more comfortable journey to customers travelling across Manchester and the wider North West.media.northernrailway.co.uk
The Class 350s will enter service wearing 'Great British Railways' branding, and will be some of the first trains on the network to feature the full 'GBR' interior
All stored at Long Marston.What's the status of the /2s currently? I didn't see any still in service when I was in the Birmingham area last week.
Discussion further upthread suggested Porterbrook were test-running them, and they now have a confirmed future, Porterbrook have over a year to have issues fixed up before they return to service.Will the 350s run into the same sorts of issues we've had with other stock left in warm storage?
Because the government have been very effectively played by the leasing company, which has control over both. Unfortunately this is just an occupational hazard in leasing trains.My one question about this all is what was the point of Northern acquiring 17 extra 323's if they were planning to get with of them about 3 years later? Seems like a waste to me.
The good thing is that unlike with most other trains, at least a lot of that £25m is there to ensure that they are meeting a good mechanical and electronic standard before they get anywhere near the paying customer.Discussion further upthread suggested Porterbrook were test-running them, and they now have a confirmed future, Porterbrook have over a year to have issues fixed up before they return to service.
The 323's were due to be replaced with new build units in the early 2030's under Northern's rolling stock plans, the 350's are reportedly on a 16 year lease with a possible break at 8 years so this avoids the need/cost of buying those new builds. Alternatively the planned new builds could still be orderred and assigned to another operator.My one question about this all is what was the point of Northern acquiring 17 extra 323's if they were planning to get with of them about 3 years later? Seems like a waste to me.
I'm happy that Northern are getting 323s though & will probably go over & give them a rode when they enter service
Northern intended to run the 323s up untill the fleet was due to replaced with the new stock, and the west midlands units were to gain a refurbishment too. However they reliability and the struggle to get parts has cut their lives in the north west by a few yearsMy one question about this all is what was the point of Northern acquiring 17 extra 323's if they were planning to get with of them about 3 years later? Seems like a waste to me.
I'm happy that Northern are getting 323s though & will probably go over & give them a rode when they enter service
In theory, no. The units have been kept in warm storage and apparently are ran around the test track on a weekly occurrence at long Marston, also they rotated so all units are kept 'panned up' in storage.Will the 350s run into the same sorts of issues we've had with other stock left in warm storage?
The 323's were due to be replaced with new build units in the early 2030's under Northern's rolling stock plans, the 350's are reportedly on a 16 year lease with a possible break at 8 years so this avoids the need/cost of buying those new builds. Alternatively the planned new builds could still be orderred and assigned to another operator.
That is true although the Northern tender is still to be announced so may change but it is a three phase call of contract so it's possible the units would go elsewhere or the 350's replaced at the eight year point, wait and see but it gives them options.The press release (linked above) implies there's currently no change to the new stock order due to the class 350 cascade.
You have to remember that Allerton TMD has inheried the 323s and is trying to keep them in service despite a shortage of spare parts.The Northern 323s were as good as the West Mids sets when the Northern sets were maintained at Longsight, and Longsight also maintains the 390s.
I'm sure the staff at Allerton are doing the best they can, but as Soho and Longsight prove, the 323 fleet ether needs ether its own depot or a depot its share with only one other multiple unit type.
That is true although the Northern tender is still to be announced so may change but it is a three phase call of contract so it's possible the units would go elsewhere or the 350's replaced at the eight year point, wait and see but it gives them options.
There on a 16 year lease with a 16 year maintenance contract to Siemens to match, there is an 8 year break in both contracts if they don't meet certain performance criteria, which given there the bullet proof 350's maintained by Siemens they will meet, so it's a near guarantee it's the full 16 years.8 years for the 350s with possible extensions sounds about right while waiting for the new trains. 8 years is what we are hearing for the 150 and 156s so that would tally up.
There is the option to send the 350 units elsewhere or to send the new build elsewhere too."https://www.find-tender.service.gov.uk/Notice/065810-2026" - "Intention to direct award a 16-year lease of a fleet of 37 Class 350/2 electric multiple units to replace the current Class 323 electric multiple unit fleet which Northern Trains Limited ("Northern") lease and operate on the Northern Network, primarily in the Greater Manchester area. The lease will include an ability for Northern to break the lease after 8 years (in August 2034) where the rolling stock fails to meet performance targets in respect of reliability and availability."
In 2034 once TRU is planned to be completed yes, but the slow door cycle will not help timings from Staylbridge to Huddersfield.Just, in theory, could a 350 do Manchester Vic to Leeds?
There on a 16 year lease with a 16 year maintenance contract
There is the option to send the 350 units elsewhere or to send the new build elsewhere too.
Not to mention they’re being actively kept in routine maintenance whilst in warm storage, so not like they’ll have a majorly troubled introduction (hopefully…)There on a 16 year lease with a 16 year maintenance contract to Siemens to match, there is an 8 year break in both contracts if they don't meet certain performance criteria, which given there the bullet proof 350's maintained by Siemens they will meet, so it's a near guarantee it's the full 16 years.
There is the option to send the 350 units elsewhere or to send the new build elsewhere too.
Yes, been ran around the test track at long Marston and regularly rotated so all units have a go at being left panned upNot to mention they’re being actively kept in routine maintenance whilst in warm storage, so not like they’ll have a majorly troubled introduction (hopefully…)
Not to mention they’re being actively kept in routine maintenance whilst in warm storage, so not like they’ll have a majorly troubled introduction (hopefully…)
So far they have been mainly stored in the warm dry season.Yes, been ran around the test track at long Marston and regularly rotated so all units have a go at being left panned up
It's roughly the same as the current 185 fleet that have no issues on that exact lineIn 2034 once TRU is planned to be completed yes, but the slow door cycle will not help timings from Staylbridge to Huddersfield.
In theory, having been built to universal C1 dimensions, could operate on any 25kv fully electrified route. (subject to completing formal clearance paperwork).Just, in theory, could a 350 do Manchester Vic to Leeds?