Network Rail calls it "Whitehaven Tunnel" but locally you would tend to hear it called "Bransty Tunnel" or "Corkickle Tunnel".What does it say on the sectional?
Network Rail calls it "Whitehaven Tunnel" but locally you would tend to hear it called "Bransty Tunnel" or "Corkickle Tunnel".What does it say on the sectional?
If they're not currently cleared then they won't be during this work.I'm sure that other threads have asked, but will 195s be cleared to run on the Cumbrian Coast once it eventually reopens fully?
If they're not currently cleared then they won't be during this work.
I believe the issue is a narrow cutting at the top end, not platforms?
Occasionally "out of gauge" things have been let through on the basis of the opposite line being blocked for the duration.
Do you mean you would expect "the former?" Surely it would be better to not have to have non-standard stock or to restrict the width of the trains that run elsewhere, but better to single the difficult bits on a lightly-used line?I think that's what was done to get the 195s through while the other end was closed due to that derailment a while back. In the end there are probably 2 choices - either single the affected sections (as they did for Hastings) or make sure the new units fit. I'd probably expect the latter to be honest, particularly given that the Barrow end is very suitable for bi-modes due to the long electrified section, and having only one type of stock operate the whole thing is a cost-saving simplification.
Do you mean you would expect "the former?" Surely it would be better to not have to have non-standard stock or to restrict the width of the trains that run elsewhere, but better to single the difficult bits on a lightly-used line?
I thought it was a body-width thing, with the near-certainty of taking off any head out of a window at a couple of bridges. Hence I had imagined that narrow stock would be needed, a la Hastings line.No, I mean I suspect they will make sure that it's part of the spec for their new trains to be cleared for their entire network rather than having to make expensive and timetable-limiting modifications to bits of it. It's not a Marston Vale like issue, it's a clearance issue that relates I think to throw at the ends of non-tapered 24m bodies (the CAF units are very rare in UK terms in being square at the ends), nor is it anywhere near as extreme as the issue at Hastings that resulted in those very specific, very narrow units until someone decided singling it was simpler.
Hence I had imagined that narrow stock would be needed, a la Hastings line.
I don't think the lining is the problem, seems more to be the voids and caverns under the trackbed.Under modern technology available, how can the lining of the tunnel be reinstated to a secure state?
They took that course of action at Farnworth.I guess filling the tunnel with concrete and redrilling it is a theoretical option, but hardly affordable
On that busy line on a major route into Manchester it was probably cost effective - or at least justifiable.They took that course of action at Farnworth.
...on a main line between Manchester and the WCML/Preston. This is a different kettle of fish. We should be grateful they look to be repairing and reinstating it at all.. Maybe it will be funded by the derelict mines body, in which case, I say Go for it!They took that course of action at Farnworth.
...on a main line between Manchester and the WCML/Preston. This is a different kettle of fish. We should be grateful they look to be repairing and reinstating it at all.. Maybe it will be funded by the derelict mines body, in which case, I say Go for it!
Government must balance the duty to regions to provide them with sufficient infrastructure for their socio-economic development with their duty to the country as a whole not to plug the mineshaft with banknotes.Not really. We shouldn't take it as a given that central Government has the right to let local and regional infrastructure crumble.
You're just inviting them to shut what they like.
Government must balance the duty to regions to provide them with sufficient infrastructure for their socio-economic development with their duty to the country as a whole not to plug the mineshaft with banknotes.
In the same way it isn't reasonable to let government shut what they like without regard for local impacts, it's also equally as unreasonable to demand the government pays to provide whatever infrastructure locals want, regardless of cost to the country.
Your use of "reasonable" is carrying a hell of a lot of weight, as is the word "repair".But its reasonable to say that the infrastructure we're left with is there for a reason, therefore it's unreasonable to close it on the basis of a repair job.
Just depends on the cost, the railway is going to have to make some very tough choices in the coming years.But its reasonable to say that the infrastructure we're left with is there for a reason, therefore it's unreasonable to close it on the basis of a repair job.
Solway Viaduct was always in danger of being affected by the natural matter of floating ice sheetsTaking an extreme example of this equation, I give you the Solway Viaduct, closed back in 1921. It was built for a reason, used for a time, but became redundant because the need for the route it provided fell away while the cost of maintaining it became disproportionate
Traditionally, since Whitehaven (Bransty) station was singled (when Platforms 3 and 4 were closed) the through platform has been regarded as the Up and Down main. From Carlisle to Whitehaven (in that direction) is regarded as down, and from Whitehaven to Barrow (in that direction) as Up, due to the original companies who built the line.They’ve run end-to-end on the down line but not the up line.
Maybe it will be funded by the derelict mines body,
Excavate the magic money pit beneath the tunnel....Traditionally, since Whitehaven (Bransty) station was singled (when Platforms 3 and 4 were closed) the through platform has been regarded as the Up and Down main. From Carlisle to Whitehaven (in that direction) is regarded as down, and from Whitehaven to Barrow (in that direction) as Up, due to the original companies who built the line.
So the ECS 195's after the Grange incident came down from Barrow to Whitehaven then up from Whitehaven to Carlisle.
The £60 million funding is from Central Government, but no one has explained what will happen if the project cost over-runs.
Indeed - one of several reasons why I referred to it as an extreme example. But I also did so because the traffic that justified building the line* no longer justified keeping it going by the 1920s.Solway Viaduct was always in danger of being affected by the natural matter of floating ice sheets
It is reasonable to say that it was left for a reason at that time, but that time was several decades ago so it would also be reasonable to reassess the need, particularly against a significant repair cost.But its reasonable to say that the infrastructure we're left with is there for a reason, therefore it's unreasonable to close it on the basis of a repair job.