entirely unrelated to the cracked nose crossing, moveable point failure, reducing capacity to one platform 13.55-16.25Victoria Line not having much luck! A points failure at Walthamstow today, causing suspension Seven Sisters to Walthamstow earlier and severe delays now. I assume this is entirely unrelated to the earlier track fault and just two failures coming in quick succession?
14.25 5165points failed to reverse for a departing train.And now a points failure at Brixton. Hopefully this one is an easy fix.
Makes me thankful I don’t take the tube to work again. I think it’s stressful because you are in less control of delays and stuff and it’s crowded at rush hour.Aiming for resolution night of 3 October.
How would part suspending it work if they need the crossing to turn around?As @Dstock7080 mentions, overnight from 3rd October. It's my understanding the whole crossing needs to be replaced. It's possible the service will be part suspended Victoria-Brixton early Saturday evening to allow a maximum amount of time to do the work into Sunday morning.
How would part suspending it work if they need the crossing to turn around?
They really need to work on making the track points more reliable for such a frequent service. In fact maybe it should be a bit less frequent but that probably means upgrading more stations to be better at dealing with crowd flow.It appears that the works may not have been too successful as a track fault as reoccurred this morning during rush hour, all trains curtailed at Victoria. Driver said track fault but TfL systems say signal failure.
All well and good except the trains are also full. People don't want to be stuck in an eternal queue. A direct result of budget cuts and a failure of successive governments to fund upgrades to the network and further capacity. Had Crossrail 2 not been shelved we would have a huge capacity relief beginning to be on the horizon.They really need to work on making the track points more reliable for such a frequent service. In fact maybe it should be a bit less frequent but that probably means upgrading more stations to be better at dealing with crowd flow.
That’s why I said that that involves improving the platform or station flow and capacity. If Victoria line stations were built with the excess capacity the service might be able to get away with a bit of a lower frequency.All well and good except the trains are also full. People don't want to be stuck in an eternal queue. A direct result of budget cuts and a failure of successive governments to fund upgrades to the network and further capacity. Had Crossrail 2 not been shelved we would have a huge capacity relief beginning to be on the horizon.
That’s where I’m disagreeing though. Even on a normal service station such as Vauxhall can have waits. It doesn’t matter whether a station can handle it when the wait itself is the problem. Lowering the frequency in a way that’s meaningful to maintenance will likely just result in waits that make the line unusable.That’s why I said that that involves improving the platform or station flow and capacity. If Victoria line stations were built with the excess capacity the service might be able to get away with a bit of a lower frequency.
This is what happens when funding is cut and an organisation has to continue to make recurring, year on year savings. This is the reality of 'managed decline', which hasn't gone away.
I would have rather they maintained the Victoria line more than have the Silvertown tunnel, Superloop and West London Orbital.This is what happens when funding is cut and an organisation has to continue to make recurring, year on year savings. This is the reality of 'managed decline', which hasn't gone away.
Signal failure caused by defective block joint, later thought to be defective insulation of temporary track clamp.It appears that the works may not have been too successful as a track fault as reoccurred this morning during rush hour, all trains curtailed at Victoria. Driver said track fault but TfL systems say signal failure.
Of course the Silvertown Tunnel, similarly to many large infrastructure projects, is funded by borrowing against future revenue (in this case by a private company), and if you don’t built it there is no future revenue, and so that money to built it just doesn’t exist. You don’t just get it to use on other things.I would have rather they maintained the Victoria line more than have the Silvertown tunnel, Superloop and West London Orbital.