Network Rail are finalising plans for what looks like a month-long shutdown of all trains west of Chester. (making a pure assumption the Bidston line will still run but the Conwy Valley line wont)

Set for January 2027.

Public info states it's for "the construction of two new fully accessible footbridges, extensive track renewals and drainage enhancements along the North Wales Coast line". Must be an awful lot of renewals and drainage due to shut down the whole line for a month?

 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The exile

Established Member
Joined
31 Mar 2010
Messages
9,490
Location
Somerset
Network Rail are finalising plans for what looks like a month-long shutdown of all trains west of Chester. (making a pure assumption the Bidston line will still run but the Conwy Valley line wont)

Set for January 2027.

Public info states it's for "the construction of two new fully accessible footbridges, extensive track renewals and drainage enhancements along the North Wales Coast line". Must be an awful lot of renewals and drainage due to shut down the whole line for a month?

What it actually says is that it includes those things.
 

Simon11

Established Member
Joined
7 Nov 2010
Messages
1,389
Would be a great opportunity to stick in electrification infrastructure too albeit our Government and GBR are not ready nor prepared.
 

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
918
Yes, which is the only public info at present. I'd imagine it includes a plethora of other work too.
Pity there's nothing about replacement of foot crossings or level crossing access to caravan parks. They're a real problem. Still, glass half full and all that. Nice to see the line getting some TLC for once.
 

Sheridan

Member
Joined
11 Jan 2012
Messages
640
Pity there's nothing about replacement of foot crossings or level crossing access to caravan parks. They're a real problem. Still, glass half full and all that. Nice to see the line getting some TLC for once.

I think it does say that, albeit not explicitly - but the bit about accessible footbridges surely includes the one at Abergele which will result in the closure of Tŷ Gwyn and Pen Uchaf foot crossings?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,951
Location
Mold, Clwyd
Haven't the foot crossings already been closed?
That's what allowed the recent service increase to 3tph on the NW main line.
The new work in January is (among other things) to construct the new footbridges, so this summer there will be a lack of access across the railway in places.
 

Sheridan

Member
Joined
11 Jan 2012
Messages
640
Haven't the foot crossings already been closed?
That's what allowed the recent service increase to 3tph on the NW main line.
The new work in January is (among other things) to construct the new footbridges, so this summer there will be a lack of access across the railway in places.

Sandy Lane and Beverley Drive in Prestatyn have closed, but Tŷ Gwyn and Pen Uchaf remain open, as unlike the Prestatyn crossings, these are equipped with red and green lights, and as an additional measure there are crossing attendants at both of them during the day.
 

chrisjo

Member
Joined
18 May 2024
Messages
608
Location
Llanishen
The BBC have (finally) picked up on this closure. This article (in Welsh), and headed with a picture of a TFW 175 as usual, gives more details, including:

  • During the first three weeks of the work the line will be closed between Chester and Holyhead, including the Conwy Valley line and the branch to Llandudno.
  • During the fourth week the line will be closed between Llandudno Junction and Holyhead.
  • Details of rail-replacement buses are expected in October.
  • Renewal of the track on Conwy Bridge, a Grade I listed structure. The current track dates back to 1978.
  • Major improvements to the track and drainage in Bodorgan Tunnel, renewing infrastructure dating back to 1972 and helping to reduce flood risk.
  • Track renewal and ground improvements at Penmaen-bach, where sections of the track have not been renewed since 1986; Track and point improvements at Holyhead and Llandudno.
  • Platform improvements at Llandudno Junction.
  • Work on four level crossings east of Bangor
  • Vegetation management contracts worth approximately £1.4m at nine locations, and extensive maintenance work along the route.
  • Two new, fully accessible footbridges at Prestatyn and Abergele, allowing for the closure of four high-risk level crossings (as in previous posts).

 

Welshguy1048

Established Member
Joined
6 Apr 2023
Messages
2,388
Location
North Wales
Morning

Here is the story in English

BBC News - Major railway line to close for a month as work is carried out

And the Network Rail Media Centre article

 
Last edited:

kieron

Established Member
Joined
22 Mar 2012
Messages
3,292
Location
Connah's Quay
There's no mention of the line between Chester and Wrexham, so the closure must only be west of Saltney Junction.

And, just to say, they closed the Bidston line for two weeks in August. Another extended closure would have raised some questions.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,330
They do. The bridge they're building isn't at the station, it's between some of the holiday parks and the seafront.
 

chrisjo

Member
Joined
18 May 2024
Messages
608
Location
Llanishen
They do. The bridge they're building isn't at the station, it's between some of the holiday parks and the seafront.
This is the image from the Network Rail press release quoted in post #12. The title is 'Pensarn Abergele footbridge artist impression.jpg'

8d737158810842c4be6f795c0abad02f.jpg


The caravans in the image match those at 'Tŷ Gwyn Holiday' on Google Maps satellite view. This is about 1.3 km east of Abergele & Pensarn Station. There is currently a pedestrian level crossing here, just visible in the top left corner of the artist's impression image.

1791117740173.png
 
Last edited:

styles

Established Member
Joined
7 Dec 2014
Messages
4,966
Location
Gwynedd
My impression is Network Rail and Transport for Wales haven't communicated very well with the regular users of the line.

From the BBC article:

BBC said:
Bangor University student Scott Walker said the disruption would be "really annoying" as he travels in by train from Deganwy, Conwy county.

"It's a simple 20 minutes on the train normally but the buses are an hour, hour and a half, so the buses are going to be a pain," he said.

...

Rachel, from Tamworth in Staffordshire, who was visiting her son at university, said the disruption could be an issue for a "lot of people who don't drive and rely on the train".

"I know they are putting on buses but it just extends your journey," she said.

The rail replacement buses will effectively be express services not calling at dozens of local bus calling points. On some services they may stop at Penmaenmawer and Llanfairfechan as per the rail schedule they're replacing, but otherwise I expect them to be on the A55 most of the time, not the back roads through the villages. So they're unlikely to take an hour and a half to get from Llandudno Junction to Bangor.
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,612
My impression is Network Rail and Transport for Wales haven't communicated very well with the regular users of the line.

From the BBC article:



The rail replacement buses will effectively be express services not calling at dozens of local bus calling points. On some services they may stop at Penmaenmawer and Llanfairfechan as per the rail schedule they're replacing, but otherwise I expect them to be on the A55 most of the time, not the back roads through the villages. So they're unlikely to take an hour and a half to get from Llandudno Junction to Bangor.
Seems pretty standard BBC News. They could just reprint the press release, but they figure they'll get more clicks by finding some random strangers who apparently haven't heard the news at all, give them a misleading summary and print their reaction.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,330
My impression is Network Rail and Transport for Wales haven't communicated very well with the regular users of the line.
Indeed, they've handled it very poorly.
Seems pretty standard BBC News. They could just reprint the press release, but they figure they'll get more clicks by finding some random strangers who apparently haven't heard the news at all, give them a misleading summary and print their reaction.
They're not random strangers though. The person concerned about the time of a replacement bus is a daily commuter. It's been over 3 months with no information. I'd probably have been completely unaware this was coming up if I wasn't on this forum. Even regular users have no idea this is happening.

The lack of information means even if you are aware, you're unable to make any plans involving rail travel.
 

Belperpete

Established Member
Joined
17 Aug 2018
Messages
3,713
The work isn't taking place until January! Plenty of time to put out detailed information before then.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,199
Location
North London or Mildmay line
This is the image from the Network Rail press release quoted in post #12. The title is 'Pensarn Abergele footbridge artist impression.jpg'

8d737158810842c4be6f795c0abad02f.jpg


The caravans in the image match those at 'Tŷ Gwyn Holiday' on Google Maps satellite view. This is about 1.3 km east of Abergele & Pensarn Station. There is currently a pedestrian level crossing here, just visible in the top left corner of the artist's impression image.

View attachment 212749
Perhaps this thread would also be suitable:


 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,951
Location
Mold, Clwyd
From Saturday 9 January 2027 Realtimetrains has buses scheduled to run west of Chester to Llandudno and Holyhead.
The Holyhead service takes 2h35m with 3 stops (Colwyn Bay, Llandudno Jn and Bangor) and must run via the A55. The normal trains take 1h47m.
I've no idea if this is the final timetable, and it may change until formally published by TfW.

https://www.realtimetrains.co.uk/se...R/2027-01-09/1159?stp=WVSC&show=all&order=wtt

There appear to be half-hour services to both Holyhead (as above) and Llandudno (calling all stops taking 2h11m, and evidently taking the coast road), both leaving Chester at xx05/35.
Llandudno Jn has stopping buses to Bangor/Llandudno/Blaenau Ffestiniog.

The TfW loco-hauled service to Cardiff starts from Chester with ECS from Crewe.
Avanti also start from Chester (one service from Wrexham) and must be moving the Everos that normally overnight at Holyhead.
 
Last edited:

styles

Established Member
Joined
7 Dec 2014
Messages
4,966
Location
Gwynedd
From Saturday 9 January 2027 Realtimetrains has buses scheduled to run west of Chester to Llandudno and Holyhead.
The Holyhead service takes 2h35m with 3 stops (Colwyn Bay, Llandudno Jn and Bangor) and must run via the A55. The normal trains take 1h47m.
I've no idea if this is the final timetable, and it may change until formally published by TfW.

https://www.realtimetrains.co.uk/se...R/2027-01-09/1159?stp=WVSC&show=all&order=wtt

There appear to be half-hour services to both Holyhead (as above) and Llandudno (calling all stops taking 2h11m, and evidently taking the coast road), both leaving Chester at xx05/35.
Llandudno Jn has stopping buses to Bangor/Llandudno/Blaenau Ffestiniog.
So the Junction to Bangor is 35 minutes according to the first couple I've checked, a far cry from the hour and a half the chap in the BBC News article suggested it could take (presumably based off the normal public buses going through the villages). Does feel like TfW could at least alleviate some of these concerns even if they don't detail the exact timetable.
 

Top