• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Future Class 73 replacement

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,900
Are those maths right?

Wouldn’t a 99 work straight through and not be replaced at Waverley?
Exactly. The 92 that comes off at Waverley becomes a 99 that works through to Inverness or Aberdeen, thereby replacing a 73 too.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

37069

Member
Joined
11 Jun 2025
Messages
273
Location
Cumbria
I believe that some of the 99s will be fitted with ETS.
That is for the Royal Scotsman and the Pullman (from Victoria). I am not sure about the Belmond Britanic Explorer as that has generator coaches.
Use to cover the sleeper contract would just increase the cost effectiveness of ordering a ETS fitted version of the 99.

How much of a speed increase is required ?.
The sleeper does not go that fast. After all we do not want the passengers falling out of their beds AND we don't want them arriving too early for a decent nights sleep !.

The maximum speed of a 92 is 87 mph (140km/h).
The maximum speed of a 99 is 75 mph (120km/h) but can be raised to 100 mph.
Above according to AI and Wikipedia.

Royal Scotsman, like the Britannic Explorer, doesn't need an ETS-fitted loco as it has its own genny car.

The Belmond British Pullman rake also has a Mk. 1 genny van that is usually in the formation - but this is currently operated by DB Cargo, given the need for steam operation, which GBRf (currently) don't do.

As for the use of the 99xxx private owner coaching stock range - there's still a lot of vehicles registered on the main line under those numbers, so they would need renumbering if there was a clash, like WCRC Pullmans 325 and 326 were ahead of the Class 99s arriving. I think the 99/4 series would probably be pretty safe, if a subclass was used. Otherwise, I think the range from 99001 to 99050 was cleared ahead of the new locos being registered - the PRCLT's two support vehicles, 99040 and 99041 were certainly renumbered.
 

Harlequinuk

On Moderation
Joined
15 May 2025
Messages
354
Location
UK
Are those maths right?

Wouldn’t a 99 work straight through and not be replaced at Waverley?
Lowlander Splits are Carstairs , with 8 to Edinburgh and 8 to Glasgow. Highlander Splits at Edinburgh with portions to Fort William, Aberdeen and Inverness. And the 2 southbound as well , so 5 on the beds (and ECS mov in London so 6) and 3 x 73s
 

Bill57p9

Member
Joined
1 Dec 2019
Messages
901
Location
Ayrshire
Exactly. The 92 that comes off at Waverley becomes a 99 that works through to Inverness or Aberdeen, thereby replacing a 73 too.
However in today's usual* operation the 92 that comes off at Waverley trundles over to Glasgow to haul the ECS back to Polmadie, so the only reduction in raw loco numbers would be the sheds.

(And the reverse southbound)

* Due to a current shortage of serviceable Dellner fitted 92s the Glasgow ECS moves are being hauled by 73967 with the Highlander 92 shared with the Edinburgh portion.

As has been stated though, "bed flakes" are speculation.
 

XCTurbostar

Established Member
Joined
13 Sep 2014
Messages
2,585
We might have had 31/4, 37/4 and 47/4, but we also had 45/1 and 27/2 as ETH sub-classes.

99101 onwards would make more sense.
99101 onwards is already used in TOPS for the Britannic stock. There may not be a new subclass - the 69s with ETS don’t have a different subclass.
 
Last edited:

Rail Quest

Member
Joined
8 Apr 2023
Messages
763
Location
Warrington
It would probably have to be that way round. I'm not sure a 99 on diesel has enough power to haul 16 carriages and provide ETS
Good point - half of all 16 coaches would be easier for the 99. Although it then it is not far I wonder what gradients are involved ?..
The sub has some quite steep gradients on it if Im not mistaken, though that may only be when travelling either of the directions rather than both. Having said that, the 99 diesel tests do seem to have been promising so far.
 

train_lover

Member
Joined
2 Nov 2007
Messages
449
To everyone who has mentioned the generator van on the Scotsman and Britannic. The generator is used because the 66 doesn't have eth. Replace the genny with a normal coach and you can get more punters on. As I've said previously. The last 10 99s have ETH fitted. This was planned some time ago.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,292
You're going to have to explain this jargon I'm afraid.
The GBRf 73/9s (split between Caledonian Sleeper and Tonbridge for NR infrastructure) had new MTU diesel engines retrofitted and new traction electrical equipment retrofitted so are in much more capable all round compared to the remaining 73/1s based at Tonbridge.

Bob Tiller was GBRf's engineering director for many years before semi retiring and now fully retiring. Bob was the person behind the 73/9, 69 and 99 projects and refurbing moat 73/1s.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,551
Location
Taunton or Kent
The GBRf 73/9s (split between Caledonian Sleeper and Tonbridge for NR infrastructure) had new MTU diesel engines retrofitted and new traction electrical equipment retrofitted so are in much more capable all round compared to the remaining 73/1s based at Tonbridge.

Bob Tiller was GBRf's engineering director for many years before semi retiring and now fully retiring. Bob was the person behind the 73/9, 69 and 99 projects and refurbing moat 73/1s.
I see, thanks for confirming. Could we then get a situation where should 99s replace the 73s with CS, the 73/9s with CS move to Tonbridge to bin off the 73/1s?
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,882
GB have already ordered 10 ETH fitted 99s. This was the plan from day 1 as they are going on the Britannic and Scotsman
Britannic does not need ETH fitted locos. Which is evident from haulage arrangements now.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,882
To everyone who has mentioned the generator van on the Scotsman and Britannic. The generator is used because the 66 doesn't have eth. Replace the genny with a normal coach and you can get more punters on. As I've said previously. The last 10 99s have ETH fitted. This was planned some time ago.
The Britannic uses a different ETH system - the Irish system - hence why the genny van came over with it.
 

37069

Member
Joined
11 Jun 2025
Messages
273
Location
Cumbria
To everyone who has mentioned the generator van on the Scotsman and Britannic. The generator is used because the 66 doesn't have eth. Replace the genny with a normal coach and you can get more punters on. As I've said previously. The last 10 99s have ETH fitted. This was planned some time ago.

The Royal Scotsman actually has two generator vans - both Mk. 3s, which are also in use as sleeping cars, one for customers and one for staff.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,770
Location
Croydon
Britannic does not need ETH fitted locos. Which is evident from haulage arrangements now.
+
The Britannic uses a different ETH system - the Irish system - hence why the genny van came over with it.
Yes the Britanic Explorer (using former Irish Mk3s) has one generator coach.
The Royal Scotsman actually has two generator vans - both Mk. 3s, which are also in use as sleeping cars, one for customers and one for staff.
The only real excuse for using a 99 is to improve the green credentials for showing off to the very valuable customers. If they care.
 

50002Superb

Established Member
Joined
18 Aug 2021
Messages
2,132
Location
Nottingham
Lowlander Splits are Carstairs , with 8 to Edinburgh and 8 to Glasgow. Highlander Splits at Edinburgh with portions to Fort William, Aberdeen and Inverness. And the 2 southbound as well , so 5 on the beds (and ECS mov in London so 6) and 3 x 73s

The Lowlanders don’t need to be 99s? They could still be 92s, as could the ECS movements involving WB and PO.

It’s only the Highlanders that are needed to replace using 92s / 73s / 66s.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,345
More 73s with modern traction electrical equipment for 3rd rail land then!

The biggest issue may well be Bob's retirement.
Or something converted from withdrawn EMUs and fitted with batteries ??
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,770
Location
Croydon
The Lowlanders don’t need to be 99s? They could still be 92s, as could the ECS movements involving WB and PO.

It’s only the Highlanders that are needed to replace using 92s / 73s / 66s.
I think there is a bit of inter-working so a 92 off a lowlander will end up on a highlander (or portions thereof).
Could be avoided by making the highlander and lowlander not use each others 92s but that would result in less efficient locomotive usage.
 

Harlequinuk

On Moderation
Joined
15 May 2025
Messages
354
Location
UK
The Lowlanders don’t need to be 99s? They could still be 92s, as could the ECS movements involving WB and PO.

It’s only the Highlanders that are needed to replace using 92s / 73s / 66s.
The first 92`s will be 40 in 2033, and they are struggling now for reliability let along in 7 years time. it`ll be a class replacement with 99s on the sleeper.
 

sad1e

Member
Joined
26 Aug 2024
Messages
1,044
Location
London
Or something converted from withdrawn EMUs and fitted with batteries ??
No chance any sort of Frankenstein 3rd rail loco could be pieced together from a modern EMU considering the amount of computerisation and software that goes into modern stock.

You can't even couple a 377 with a 387 or 379 without the software going crazy , no chance it would accept being Frankensteined into some sort of loco.

The last chance for making some sort of Frankenstein loco was from the now withdrawn Class 455 as they weren't nearly as computerised as anything modern but that boat has now sailed (no idea how computerised networkers are so I guess that could be a possibility) but I presume if any new 3rd rail loco is to come in to being it should have to be new build.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,770
Location
Croydon
No chance any sort of Frankenstein 3rd rail loco could be pieced together from a modern EMU considering the amount of computerisation and software that goes into modern stock.

You can't even couple a 377 with a 387 or 379 without the software going crazy , no chance it would accept being Frankensteined into some sort of loco.

The last chance for making some sort of Frankenstein loco was from the now withdrawn Class 455 as they weren't nearly as computerised as anything modern but that boat has now sailed (no idea how computerised networkers are so I guess that could be a possibility) but I presume if any new 3rd rail loco is to come in to being it should have to be new build.
319s ?.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,900
Using 66s to haul the sleepers with the 73 tucked inside to act as an ETHEL was an admission of failure of the plan to use 73s north of Edinburgh.

Replacing those lash-ups with ETH fitted 99s would simplify operations, make full use of electrification, and free up the 66s for freight work, where they belong.
 

Tony73E

Member
Joined
16 Jun 2022
Messages
29
Location
Faversham
The GBRf 73/9s (split between Caledonian Sleeper and Tonbridge for NR infrastructure) had new MTU diesel engines retrofitted and new traction electrical equipment retrofitted so are in much more capable all round compared to the remaining 73/1s based at Tonbridge.

Bob Tiller was GBRf's engineering director for many years before semi retiring and now fully retiring. Bob was the person behind the 73/9, 69 and 99 projects and refurbing moat 73/1s.
73/1's and 73/2's have not been refurbished and are very much original.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,292
73/1's and 73/2's have not been refurbished and are very much original.
Refurbishment doesn't automatically imply upgrading equipment. GBRf have had all but about 2? of the /1 and /2 they have completely stripped down and rebuilt over the years. This was part of getting the NR contract for the 73s renewed.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,882
We'll come back to this in 12 months time
What difference does 12 months make? Have you missed the bit about the Britannic's ETH system being the Irish type and therefore completely non-standard?

There might be a 99 on it in 12 months, but I'd be amazed if there is an ETH connection between loco and train.
 

E100

Member
Joined
29 Apr 2018
Messages
188
A good point is that the 99's will make use of electronification for a bit more when crossing the central belt from Edinburgh
 

172007

Member
Joined
2 Jan 2021
Messages
1,171
Location
West Mids
What difference does 12 months make? Have you missed the bit about the Britannic's ETH system being the Irish type and therefore completely non-standard?

There might be a 99 on it in 12 months, but I'd be amazed if there is an ETH connection between loco and train.
Is this ETH detail somewhat a red herring?

The Mk5 CAF Sleeper carriages each have an inverter that converts the 1000v DC to 240v AC 50hz for most electrical devices, galley, sockets etc from what i can make out. I am certain the only Britannic compatability issue is having an inverter installed tp go from DC to AC in the generator car and possibily the generator car being converted to more usuable space a weight savung with the absence of a generator and its fuel?
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,249
Location
UK
Long live the small ED's !
 

Attachments

  • BJ-73108, May 1981.jpg
    BJ-73108, May 1981.jpg
    462.6 KB · Views: 38
  • BJ-73964, October 2025.jpg
    BJ-73964, October 2025.jpg
    4.5 MB · Views: 38

Top