Just as a matter of interest, I was on the tram stop at Wythenshawe Town Centre and the Manchester-bound trams had destination boards stating "Victoria via Market Street" which seems to be quite explicit.
I really don’t understand what Metrolink have got against route numbers.
There is no reason TFGM couldn't have the same though, looking at the bigger picture signage is cheap and can make a big difference.
Even just more prominent "This Platform for Bury" or similar signage would be a welcome addition.
Would be more helpful if displays at stops were like train station displays by listing all calling points, rather than destination!
I think a temporary route number or letter would be fine for amended services, while it is a smaller network when the South Yorkshire Supertram had closures a few years ago they had a temporary Green route which is not normally used and it appeared to work fine.I'm not againsit this, I use trams all over the world and a few use route numbers. 1 issue I can think off is that under the normal service pattern we run Eccles to Ashton via MediaCityUK and Bury to Piccadilly, but if the Eccles line is closed or has a service change (Remeberance Sunday comes to mind when Eccles is turned short until dinner time and then only runs to Piccadilly for the reminder of the day) and the service pattern comes Bury to Ashton, how will this be put as a route number as its only now and again so would it need a number its in on right or would there need to a "special" route number. It could get confusing if there is mutiple changes like that.
Most staions aleady have this dont they? Alhtough i thhink they say trams towards the City on the inbound platforms. They cant put trams towards X on them as if there a service pattern change for improvement works this could cause issues for passangers that dont use the network regulary and touritsts as they would be looking for a tram that say X but they all say Y.
Tramlink was confusing because it had too many routes for its size and really weird timings that made it hard to plan around reliably.Croydon Tramlink, a far simpler tram network, gave up on route numbers years ago because they were thought to be confusing.
Will the cost of bringing this aspiration into fruition be irreconcilable with the benefits it purports to serve?I would start by taking what currently looks like a siding and creating a ramp to bring it to the overpass bridge at Deansgate Junction before continuing along the old alignment and over the ship canal (likely on a new bridge structure!). Before bringing it back to street level at Liverpool Road and taking it up to a terminus somewhere near Irlam Station for intermodal connectivity.
Appreciate some fairly major civil works to replace the. ship canal bridge, but it seems like much of the rest of the alignment is still there, and it would link Partington with a very useful public transport connection.
Even if the Glazebrook to Skelton Junction line could be revived without inordinate expense, I fail to see its usefulness as a potential public passenger transport route.I was just having another look at the map for possible Metrolink extensions and just thought that the former Glazebrook East Junction-Skelton Junction Line. Might make for quite an interesting extension.
I would start by taking what currently looks like a siding and creating a ramp to bring it to the overpass bridge at Deansgate Junction before continuing along the old alignment and over the ship canal (likely on a new bridge structure!). Before bringing it back to street level at Liverpool Road and taking it up to a terminus somewhere near Irlam Station for intermodal connectivity.
Appreciate some fairly major civil works to replace the. ship canal bridge, but it seems like much of the rest of the alignment is still there, and it would link Partington with a very useful public transport connection.
Could an extension be used to justify new housing or development around Carrington? Build the transport first before the houses, a model not seen very much in the western world.Even if the Glazebrook to Skelton Junction line could be revived without inordinate expense, I fail to see its usefulness as a potential public passenger transport route.
It does not provide good connectivity at either end. Glazebrook and Irlam currently have limited heavy rail services with a fairly low frequency. There is no easy way to link the eastern end to the current Metrolink line from Altrincham to Manchester, and the link onto the existing rail line towards Northenden is of limited usefulness.
Former stations at Cadishead, Partington and West Timperley are poorly sited. The existing TfGM 247 bus service provides better connectivity between Partington (serving the housing estate) and Altrincham (serving the town centre as well as the retail park); the area between these 2 places is largely rural. The proposed route wouldn't reduce the relative isolation of the deprived town of Partington.
Metrolink expansion should focus on radial routes into Central Manchester, such as the ex-GC line from Piccadilly via Reddish to Marple Roase Hill, which was part of the original proposals in the 1980s. This could make use of existing capacity in the city centre, as services currently terminating at Piccadilly undercroft could just be extended onto it via a short new surface light rail link from there to Ashburys.
Carrington is not an area that many people would see as an ideal place to live. New social development brings to mind a song that I sang in the late 1960's with our folk group that was based on what my old chum Mike Harding wrote that started....Could an extension be used to justify new housing or development around Carrington? Build the transport first before the houses, a model not seen very much in the western world.