West London Orbital Consultation

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,132
Location
Selhurst
TfL have released a new consultation to bring ahead the WLO. Haven’t had time to read it fully but looks like the originally proposed West Hampstead branch has been abandoned.

We’re developing proposals for a new rail service, the West London Orbital (WLO). It would be a new London Overground service. It is proposed to run between Hounslow and Hendon, making use of existing rail lines that are currently underused - including the Dudding Hill line, which is currently only used by freight services.

The service would serve a mix of new stations and upgrades to current ones. The proposed new stations are:

  • Neasden

  • Harlesden

  • Old Oak Common Lane

  • Lionel Road
Some existing stations would need new platforms, entrances or other upgrades to support the WLO service. You can read more about the new stations by using the 'Stations' button above.

You can read more about the proposed route and why we chose it by using the 'Route' button above.

This new service has the potential to make travelling across west and northwest London much easier. We’re looking for your views to help shape these proposals.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

paulmch

Member
Joined
20 Dec 2018
Messages
220
They address the West Hampstead question in the Route section of the consultation website. Seems reasonable, especially if that £100m is the difference between it being built and being shelved.
Forecasts show around seven times fewer passengers would use a branch to West Hampstead Thameslink compared to the route to Hendon. It would also make the WLO around £100m more costly to deliver. So, the branch doesn't currently offer enough benefit compared to its cost and complexity.
 

Farigiraf

Member
Joined
23 Jul 2023
Messages
1,186
Location
Bridge on the River Cam
Great to see it progressing, though I retain the view that since nearly every 'interchange' on the line will actually be a pretty mediocre OSI connection, the line won't be as well used as expected nor too convenient as an orbital connection unless your origin & destination is along the line. A journey such as Wembley Park to Richmond or Greenford to Hounslow, both currently pretty inconvenient, will only get slightly less inconvenient. The convenience for west Londoners of having a high-speed rail hub next door will be offset by having to lug your suitcase half a mile across suburban Acton. In the Kew Bridge / Lionel Road area, residents in the new housing development will be able to choose between a slow & infrequent SWR or a fairly long and indirect 1-change OSI route via OOC to get into the city.

That's the nature of reusing legacy routes rather than building from new, I guess - it's cheap enough (to convince the Treasury that is, £1B for this descoped version of WLO is still quite a lot) that at least we get something built to serve these secondary (but still really important) flows that need mass transit but won't get extensive private funding. To get an idea of what we could've been doing, take a look at our neighbours across the Channel, building the Grand Paris Express, including 2-3 orbital lines, and compare that to this Great British compromise!

I wonder if cross-platform connections to mainline services will be possible at either end, such as at Brent Cross West and Hounslow? Given that SWR and Thameslink only run 2-4 times an hour through these stations it'd be a good idea to try to coordinate connections as it's likely that a significant amount of passengers will be transferring to/from mainline services.
 
Last edited:

Supercoss

Member
Joined
5 Jun 2016
Messages
464
A significant saving by not having a spur to West Hampstead Thameslink which would require signal interlocking changes at WH North Junction, where at Hendon an existing crossover exists all be it disconnected within interlocking.
for those with future visions imagine if the spur was extended beyond West Hampstead to Finchley Road where the current O2 Centre is being redeveloped for housing on what was originally BR / LT exchange sidings.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,575
Location
Brighton
They address the West Hampstead question in the Route section of the consultation website. Seems reasonable, especially if that £100m is the difference between it being built and being shelved.
Indeed.

If you want West Hampstead from most of the line, there's always the existing LO Richmond-Stratford service, though the interchange at OOC will need to be good. Serving Cricklewood on its own given the existing Thameslink service provision was never going to wash its face in a MVP (minimum viable product).

West Hampstead is better for Thameslink interchanges, though, so there's that. Personally I think that branch only really comes into its own if extended in tunnel to Gospel Oak or some such. And maybe then the Hendon branch can get extended to Mill Hill. ;)

But as a initial project core, I think they've got this one largely right.

I do agree with Farigiraf on the quality (or rather, lack thereof) of the interchanges, though. Would have massively inflated costs to improve those, so on balance, again, I think as an initial project I think what they have is right. I'd love to see integrated Neasden and Harlesden rebuilds one day, though.
 

Posa

Member
Joined
9 May 2024
Messages
20
Location
Scotland
Acton Central
Bollo lane
&
Wood Lane level crossings due to be closed if this goes ahead.

Was wondering how they would tackle the barrier down times and frequencies.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,647
I wonder if cross-platform connections to mainline services will be possible at either end, such as at Brent Cross West and Hounslow? Given that SWR and Thameslink only run 2-4 times an hour through these stations it'd be a good idea to try to coordinate connections as it's likely that a significant amount of passengers will be transferring to/from mainline services.
Well Hounslow will be easy, because it is only those two platforms, and use of turnbacks. Given the poor service on this line, I don't think it'll be wildly useful (also the dwell / terminate might see WLO right behind a through SWT service - so long waits?)

This will be very good for local journeys (frequency through Brentford) - removing North Circular car and local bus journeys - and feeding more routes into OOC. There will be a ton of housing development throughout too, so it supports that, and lower car ownership (ie parking provision!)

And better to get to a 6-8tph core service than branching, re West Hampstead. Metro frequency and predictability is what drives true modal shift.
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,179
Location
Ashford Middx
Good news if this happens. I can see the level crossings at Isleworth being a showstopper for extra trains along that section (despite the fact SWR used to run 4tph each way). I think there are still the remains of a siding west of Hounslow which could potentially be brought back in to use if a train needed to be stabled out of the way.

I wonder if it could start as a Kew Bridge to Hendon service initially to potentially reduce the initial cost.
 

evergreenadam

Member
Joined
23 Nov 2013
Messages
339
Good news if this happens. I can see the level crossings at Isleworth being a showstopper for extra trains along that section (despite the fact SWR used to run 4tph each way). I think there are still the remains of a siding west of Hounslow which could potentially be brought back in to use if a train needed to be stabled out of the way.

I wonder if it could start as a Kew Bridge to Hendon service initially to potentially reduce the initial cost.
All mention of serving Kew Bridge dropped, not surprising given the extreme curvature of the disused short platforms there, it was never going to work on a practical level.
 

brooklynbound

Member
Joined
5 Jan 2021
Messages
76
Location
.
Even with the turnback west of Hounslow station, I don't see how they're going to manage such a frequent service there, especially in the peaks when there are currently 4 SWR's an hour. In addition most people assume that the Hounslow loop will be returning to 4 trains an hour all day once SWR rebuild their timetable late 2027 early 2028.
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,179
Location
Ashford Middx
All mention of serving Kew Bridge dropped, not surprising given the extreme curvature of the disused short platforms there, it was never going to work on a practical level.
I meant Lionel Road, rather than Kew Bridge. Effectively just turning back before they join the Hounslow loop.

Even with the turnback west of Hounslow station, I don't see how they're going to manage such a frequent service there, especially in the peaks when there are currently 4 SWR's an hour. In addition most people assume that the Hounslow loop will be returning to 4 trains an hour all day once SWR rebuild their timetable late 2027 early 2028.
I'll believe it when I see it. The loop has a worse service than it had 20 years ago and SWR are in no rush at all to improve it. Hopefully the west London orbital will be a catalyst for that..
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,647
Acton Central would be an/the interchange surely?
Would also work! Nice spot to wait too. Less said about South the better.

Even with the turnback west of Hounslow station, I don't see how they're going to manage such a frequent service there, especially in the peaks when there are currently 4 SWR's an hour. In addition most people assume that the Hounslow loop will be returning to 4 trains an hour all day once SWR rebuild their timetable late 2027 early 2028.
This would likely become an issue. If there had been plans for a bay (5-6 car) - would cover this. I am sure that if it becomes a bigger problem, it might get sent on somewhere easier to turn trains.

As for the loop services, what I think we will see is folks using this to OOC and the flying into town. A Brentford-West End or City journey would be far quicker than via Vauxhall/Waterloo - except for the one-seat rides like Waterloo itself.
 

Acton1991

Member
Joined
20 Jan 2019
Messages
390
It baffles me that the current proposal doesn’t include Mildmay line platforms at Old Oak Common. Surely that should be a given.

  • Why are there no Mildmay line platforms at Old Oak Common Lane?
    The current proposals focus on delivering the West London Orbital service.
    The station could potentially accommodate Mildmay line platforms in the future, but they are not required for operation of the WLO and are not part of the current project.

    What happened to previous proposals for a station on the Mildmay line at Old Oak Common?
    The current proposals include a new Old Oak Common Lane station for the WLO. Future Mildmay line platforms could potentially be delivered separately. The design of the WLO station is ensuring that Mildmay Line platforms could be added to the station in the future if funding to deliver these can be identified.
 

The Pelican

Member
Joined
3 Oct 2025
Messages
412
Location
London
It's interesting to compare it's £1B cost to the £1.6B for the DLR Thamesmead extension- it shows how the cost of a long, under thames tunnel has come down, while the cost of a large number of new 2 platform stations has gone up. It's interesting how many post-1994 London rail projects have been either DLR or Overground, which makes sense- either build new, or make the best of what's already there.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,132
Location
Selhurst
Even with the turnback west of Hounslow station, I don't see how they're going to manage such a frequent service there, especially in the peaks when there are currently 4 SWR's an hour. In addition most people assume that the Hounslow loop will be returning to 4 trains an hour all day once SWR rebuild their timetable late 2027 early 2028.
A dedicated bay or siding will be perfectly adequate capacity for 4 terminating and 4 through. Works perfectly well at West Croydon which has even more traffic.
 