HS2 could cost up to £102.7bn and trains won't start until at least 2036

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,995
Location
"Marston Vale mafia"
Coventry will lose passengers to HS2 and the other three are that close to London, in time, why do they need a true InterCity service?

What is a "true intercity service"?

They do justify a fast service to their two nearest large cities, London and Birmingham, and there is absolutely no chance of that being removed. However it's likely it will be 2tph that calls at all three of them.

We can't spend £100Billion+ on HS2 and then use the WCML as now, HS2 provides new fast line to Birmingham and Handsacre for the North West and Scotland, the classic fasts can be used by an expanded LNWR 110mph service pattern and the classic slows become freight lines in effect with the all stop LNWR's.

It could be 110mph, sure, but there will be a Euston-Birmingham service that doesn't run via Northampton. It is inconceivable and nonsensical for there not to be because of the importance of these intermediate stations - indeed better serving these three is a core reason for HS2 P1.

The slow lines will not "be given over to freight", they will likely host an increased local service, which is again part of the purpose of HS2. Freight will have paths though.

== Doublepost prevention - post automatically merged: ==

I think a big chunk of Coventry (and probably Rugby) traffic will defect to HS2 from Birmingham International.
As to the residual service, I could see an argument for something like:

1. All stations to Watford Junction on the DCs on Overground
2. First stop Watford Junction (maybe with a stop at Harrow and Wealdstone) to Milton Keynes
3. First stop Milton Keynes, then all stations to Birmingham/Wolverhampton/Stafford via Northampton.

Services 2 and 3 would be run using a unified fleet of flat front rolling stock and the classic "fast" would cease to exist as such.

This is not the plan.

The plan is as follows, and I'd expect it to be what happens as it has been the plan for a very long time.

1. DC line unchanged as you note
2. 2tph Euston-Watford-MK-Rugby-Coventry-Intl-New St, fast line throughout.
3. 1tph Euston-Watford-MK-Rugby-<not sure>-Stockport-Manchester Picc. Some proposals had this continuing to Scotland instead of the TPE service. It will have multiple Trent Valley stops.
4. 1tph Euston-MK-Crewe-Chester-North Wales.
5. Enhanced local service separate from the above (would have to look that up, but you'd be looking at a rough doubling of everything that runs now south of Northampton).

There have been a slight variant of which of the above call at Watford and Rugby - it may be all of them, it may be two out of the four at each. However what you suggest is not what will happen and has not been part of any of the proposals so far.

It might be 125mph using 807s or HS2 stock, it might be 110mph using 730/2s or something like them, but it'll almost certainly be something very close to the above.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,750
Coventry will lose passengers to HS2 and the other three are that close to London, in time, why do they need a true InterCity service? We can't spend £100Billion+ on HS2 and then use the WCML as now, HS2 provides new fast line to Birmingham and Handsacre for the North West and Scotland, the classic fasts can be used by an expanded LNWR 110mph service pattern and the classic slows become freight lines in effect with the all stop LNWR's.
Coventry won't, its easily a 25 minute journey before you even get on a HS2 train. You're nearly at MK on the conventional network. The West Mids will still have at least 1tph fast.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
670
Location
Hull
Coventry won't, its easily a 25 minute journey before you even get on a HS2 train. You're nearly at MK on the conventional network. The West Mids will still have at least 1tph fast.
110mph fast OK but no need for anymore, given tilt dies with the 390's what would non tilt 125mph gain you vice non tilt 110mph to Wolverhampton? Mixing 125 and 110mph trains on the classic fasts is just wasting the capacity we have spent £100 Billion on creating via HS2, doesn't make any sense.
The slow lines will not "be given over to freight", they will likely host an increased local service, which is again part of the purpose of HS2. Freight will have paths though.
Given the governments target for increased freight there's going to need to be a lot more freight paths made available.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,223
Location
Liverpool
What is a "true intercity service"?

They do justify a fast service to their two nearest large cities, London and Birmingham, and there is absolutely no chance of that being removed. However it's likely it will be 2tph that calls at all three of them.
Not the post you responded to, but arguably a true intercity service is an express passenger train that serves major urban centres and hub stations only. The question with the British network is what counts as a hub or urban centre. Coventry probably wouldn't count as one but it is part of the fastest London to Birmingham service today with the only other calling point being Birmingham International (that would fall under a typical intercity service as an urban station with an airport connection). HS2 would actually make it a lot easier to differentiate these services due to proper traffic segregation.
 

Grimsby town

Member
Joined
4 Apr 2011
Messages
867
Coventry won't, its easily a 25 minute journey before you even get on a HS2 train. You're nearly at MK on the conventional network. The West Mids will still have at least 1tph fast.
There'll be some abstraction from western Coventry at least given it'll be similar/quicker to get a bus to HS2 than central Coventry. It'll be interesting to see how much demand gets abstracted from Coventry through people driving to Interchange too. There'll definitely be need for fast Birmingham to Milton Keynes services but I do think there'll be fairly significant diversion of Coventry to London pax to HS2.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,348
Location
London
I really resent the way that the suggested solution for every problem in modern life is an app. Why does everything need to be complicated to the extent that it then requires an app to be usable again?

Hear hear!
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,417
Not the post you responded to, but arguably a true intercity service is an express passenger train that serves major urban centres and hub stations only. The question with the British network is what counts as a hub or urban centre. Coventry probably wouldn't count as one but it is part of the fastest London to Birmingham service today with the only other calling point being Birmingham International (that would fall under a typical intercity service as an urban station with an airport connection). HS2 would actually make it a lot easier to differentiate these services due to proper traffic segregation.
The fast train between Coventry and Birmingham doesn't necessarily need to be the same as the fast train between Coventry and London. Indeed, there are some reasonable (I won't say good) arguments linked to London and Birmingham connectivity why it shouldn't be - eg speeding up Northampton to Birmingham journeys, spreading London and Milton Keynes demand from the Western side of the West Midlands across multiple stations. Matching up rolling stock to platform lengths is perhaps an issue, but does the WCML need to retain 125mph running south of Handsacre?
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,635
Location
Wales
Obviously Coventry should retain a fast service to London, but without the Birmingham-London passengers it wouldn't justify the non-stop one it currently has. So at least one intermediate stop at MKC, and possibly Rugby too.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,357
Location
Nottingham
Coventry won't, its easily a 25 minute journey before you even get on a HS2 train. You're nearly at MK on the conventional network. The West Mids will still have at least 1tph fast.
Yes, and from most suburbs of Coventry to Coventry station car park will be around ten minutes, giving a 15 minutes head start.

So for a Coventry commuter a 3-4tph HS2 service to Old Oak Common (38 minutes) and then to Euston (~46 minutes) will easily beat a 1tph WCML fast service to Euston (1h9m today) calling at Rugby, MKC and Watford Junction.
 

Palmerston

Member
Joined
4 Oct 2024
Messages
230
Location
Hampshire
One WCML fast tph Wolverhampton-Birmingham-Coventry-Euston feels sufficient. It is a downgrade from 2tph, but there would also be services on the LNWR trains.

The demand here isn't all one way though. People in Watford/M Keynes will also use fast services to B'ham, though clearly with much less demand than for services to London
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,995
Location
"Marston Vale mafia"
One WCML fast tph Wolverhampton-Birmingham-Coventry-Euston feels sufficient. It is a downgrade from 2tph, but there would also be services on the LNWR trains.

The demand here isn't all one way though. People in Watford/M Keynes will also use fast services to B'ham, though clearly with much less demand than for services to London

One wouldn't be bringing the improvements that HS2 is meant to bring. If you aren't bringing significant passenger service improvements to stations south of Northampton you aren't getting your money's worth. If it was just about freight, a 40mph single track freight line would be a lot cheaper.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,610
One wouldn't be bringing the improvements that HS2 is meant to bring. If you aren't bringing significant passenger service improvements to stations south of Northampton you aren't getting your money's worth. If it was just about freight, a 40mph single track freight line would be a lot cheaper.
There will presumably also be service enhancements from LNWR, they just won't be fast services
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,995
Location
"Marston Vale mafia"
There will presumably also be service enhancements from LNWR, they just won't be fast services

There will be service enhancements all round including fast services. I've outlined what the "IC" plan is above and it's been the proposal for something like 15 years. It involves two Euston-Birmingham fasts per hour with the calling pattern of the present 807 operated service. Much as the "crayonistas" of the group like to come up with ideas that disadvantage Milton Keynes so they can photograph more freight locomotives, the city is one of the key drivers behind HS2 and a downgrade of its Birmingham and Euston services is not going to be on the agenda.

There have been a wide variety of proposals for local services, but the IC service proposals have stayed about the same for ages.

I jested a bit about a 40mph freight route, but there would certainly be massively cheaper options if you just wanted a London-Brum freight route. Realistically a couple of additional slow line freight paths per hour will be plenty.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,417
There will presumably also be service enhancements from LNWR, they just won't be fast services
There appears quite a potential conflict between retaining fast paths to places like Northampton, Rugby and Coventry, while also allowing faster services (ie fast line calls) at Hemel Hempstead and Berkhamsted, to free up space on the slows
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,340
1tph Euston-MK-Crewe-Chester-North Wales
I'd hope that remains the current pattern with a Stafford stop rather than revert back to fast Crewe-Milton Keynes. Stafford gives a useful connection into Cross Country for Chester and North Wales.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,995
Location
"Marston Vale mafia"
There appears quite a potential conflict between retaining fast paths to places like Northampton, Rugby and Coventry, while also allowing faster services (ie fast line calls) at Hemel Hempstead and Berkhamsted, to free up space on the slows

The way to do that is to flight trains - half hourly, send out a train or two fast to MKC, then one that runs fast to Leighton then all stations from there, then one that runs fast to Tring then all stations from there to MKC, then a Tring stopper. I can't remember if the proposed slow service pattern did that or not but I think it did.
 

Palmerston

Member
Joined
4 Oct 2024
Messages
230
Location
Hampshire
There will be service enhancements all round including fast services. I've outlined what the "IC" plan is above and it's been the proposal for something like 15 years. It involves two Euston-Birmingham fasts per hour with the calling pattern of the present 807 operated service. Much as the "crayonistas" of the group like to come up with ideas that disadvantage Milton Keynes so they can photograph more freight locomotives, the city is one of the key drivers behind HS2 and a downgrade of its Birmingham and Euston services is not going to be on the agenda.
I might not have phrased my comment too well. At present there are three tph between B'ham and M Keynes. 2 LNWR and 1 Avanti. That seems sufficient and these would stay in place.

There's also a service that runs non-stop Cov-Euston. I imagine 90% of the people got on in B'ham so it's this service that seems least necessary. Absolutely, keep it if there's good demand and available paths, but if there are better uses for the line, is it really necessary once HS2 opens?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,995
Location
"Marston Vale mafia"
I might not have phrased my comment too well. At present there are three tph between B'ham and M Keynes. 2 LNWR and 1 Avanti. That seems sufficient and these would stay in place.

It's not sufficient. A second fast Birmingham is appropriate, particularly as MK grows further and heads towards a fully grown city of maybe 400K. Via Northampton is extremely slow and does not compete well with the car.

For that reason all official IC proposals I've seen in recent years contain that second Birmingham. There seems to be a bit of to-and-fro-ing about whether both of those call at all three of Rugby, MKC and Watford Junction or whether Rugby and Watford Junction just get one each, but both will call at MKC.

Will it be a pointy nosed unit at 125 or a slab/gangway fronted one at 110? Doesn't really matter (for that journey length the difference is about 5 minutes), but the service that goes via Hanslope is important because it takes under an hour rather than more like 90 minutes. The former competes well with the car, the latter does not. (Driving from MK to Brum takes about 90 minutes and is of course door to nearly-door).

There's also a service that runs non-stop Cov-Euston. I imagine 90% of the people got on in B'ham so it's this service that seems least necessary. Absolutely, keep it if there's good demand and available paths, but if there are better uses for the line, is it really necessary once HS2 opens?

There is not proposed to be a fast Cov-Euston. The Birmingham-Euston WCML fast service would be 2tph with additional stops, in addition to what runs via Northampton.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,610
There is not proposed to be a fast Cov-Euston. The Birmingham-Euston WCML fast service would be 2tph with additional stops, in addition to what runs via Northampton.
And obviously those additional stops would help with flighting it in with slower services!
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,417
The way to do that is to flight trains - half hourly, send out a train or two fast to MKC, then one that runs fast to Leighton then all stations from there, then one that runs fast to Tring then all stations from there to MKC, then a Tring stopper. I can't remember if the proposed slow service pattern did that or not but I think it did.
Fast to Tring isn't going to happen.

However, the problem with flighting on a half hourly basis is that Milton Keynes still only gets a headline half-hourly service, when it arguably should have a fast train (with one or two calls) every ten minutes.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
670
Location
Hull
One wouldn't be bringing the improvements that HS2 is meant to bring. If you aren't bringing significant passenger service improvements to stations south of Northampton you aren't getting your money's worth. If it was just about freight, a 40mph single track freight line would be a lot cheaper.
HS2 is in effect a bypass for Rugby / Milton Keynes which can have more frequent but slower and lower quality trains, same as Northampton has been for decades. It's similar to HS1 which improved Ashford - London times but made the service slower for other stations nearer London.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,995
Location
"Marston Vale mafia"
However, the problem with flighting on a half hourly basis is that Milton Keynes still only gets a headline half-hourly service, when it arguably should have a fast train (with one or two calls) every ten minutes.

4 x "Avanti" (some nonstop, some WFJ)
2 x "LNR" Birmingham (Bletchley, Leighton, sometimes WFJ)
1 x "LNR" Trent Valley (maybe two) (nonstop or WFJ)

That's more than every ten minutes. Remember there are four tracks and the idea of giving the slow pair over solely to freight is just not happening nor is it necessary as freight demand just isn't that high.

== Doublepost prevention - post automatically merged: ==

HS2 is in effect a bypass for Rugby / Milton Keynes which can have more frequent but slower and lower quality trains, same as Northampton has been for decades. It's similar to HS1 which improved Ashford - London times but made the service slower for other stations nearer London.

Lower quality maybe. Slower (aside from 110 vs 125) is not the point here as HS1 is different as it doesn't have a growing new city on its patch. Serving MK better as it grows towards 400-500K, which will include fast trains, is a core purpose of HS2 P1. The Ashford line doesn't have an equivalent.

The official proposals exist, I'd suggest some people on this thread need to go and look at them and consider why they are as they are before proposing their own variants.

This Modern Railways article outlines the official proposals, though running WMT trains onward via Birmingham is now somewhat discredited and so I'd think unlikely. But I can't see the classic line "IC" service differing substantially from this, nor the HS2 service:


WILLIAM BARTER suggests the Revised Business Case for HS2 shows some muddled thinking
img_56_1.jpg

HS2: visual of how Birmingham Curzon Street might look
. Courtesy HS2
Notice to Proceed for the main works contracts for HS2 is very welcome news, and the Business Case that supports it gives a much clearer impression of how HS2 will operate than its predecessors.
So far as HS2 itself is concerned, the business case outlines the Phase 1/2a ‘Statement of Intent’ service. This is a careful bit of wording recognising that powers currently exist only for Phase One infrastructure, with all trains to the West Coast main line (WCML) operating by way of the Handsacre junction (the link joining HS2 to the Stafford line); however, the Phase 2a infrastructure is intended to be brought into use simultaneously with Phase One.
One change since previous Business Cases is an hourly HS2 service between Euston and Stoke-on-Trent, serving Stafford and extending to Macclesfield. This is good not just for Stoke: this train picks up the Stafford call and both Liverpool trains in the hour can take the faster route via Crewe. One of these is to detach at Crewe a portion for Preston, which it is also suggested could be extended to Lancaster.
Another change, arising in the Phase Two service, is that instead of Euston – Scotland trains splitting at Carstairs for Glasgow and Edinburgh, the splitting location has shifted to Carlisle. Logically this would be a passenger stop as well, and if it is to be a passenger stop in Phase 2b, equally logically the Phase 1/2a Euston – Glasgow service calls there. So, together with the Lancaster train, two significant locations that risked losing their direct trains to London in previous specifications will now have them provided by HS2.
img_57_1.jpg


img_57_2.jpg

‘One of these and one of those’ strategy: ‘Statement of Intent’ interim service on HS2 for 2029-31.
Courtesy HS2
OLD OAK
It is now clear that Old Oak Common is expected to act as the London terminus until Euston is ready. Thankfully this may be only a short period – the most optimistic timescales suggest only just over a year, but it would be unwise to bank on that. What sort of service could run during that period? The Business Case actually implies a classic service to Euston and an HS2 service with all passengers transferring at Old Oak are equivalent in terms of demand and benefits, so to be worthwhile the services should offer some benefits over and above the HS2 trains themselves, and avoid leaving gaps on the classic network. Multiple consecutive timetable changes on such a complex route as the WCML must also be avoided.
Three trains per hour between Old Oak and Curzon Street? Fine, that works as they are confined to HS2 so can be timed at will and would be an enhancement to the present service. Do they, however, form an adequate replacement for existing trains to Euston, to the extent that those services can be reconfigured around the needs of intermediate stations? Probably not, and in those first couple of years it would be wise to have the capacity of the WCML to fall back on in case of some ‘Britannia’-like problem requiring suspension of HS2 services (the first 25 of the newly-introduced ‘Britannia’ steam locos were temporarily withdrawn soon after introduction in 1951 due to reports that the driving wheels had shifted on their axles). But maybe the headline ‘flyer’ – the 07.30 from New Street – becomes superfluous, if we reasonably assume it carries the briefcase brigade who will be happiest to change to Crossrail for the City and Docklands. It should be simple enough to put the standard stops into the 07.30 and thus fill a key gap at present for a service from the West Midlands to suit commuters to Milton Keynes. Moreover, with the high value business now on HS2, the peak ‘set down only’ and ‘pick up only’ stops at Milton Keynes and Watford by Birmingham trains could be opened to London commuters, directly adding London commuting capacity for those places at the earliest opportunity.
It becomes more awkward to choose any other services to terminate at Old Oak. The Business Case suggests a total of six might terminate – operationally this is fine, as it boils down to one train per platform per hour, which is prima facie feasible. It would be best if they could be timed into their ultimate paths, so the trains could simply be extended to Euston in due course without a further timetable change on the classic railway; turnrounds of 45 minutes or so at Old Oak would allow that.

img_58_1.jpg

Pick ’n’ mix: off-peak service proposed by HS2 once the western leg of the high-speed line is open. Courtesy HS2
But which trains? A scenario outlined in the Business Case would see one Liverpool (out of the two per hour planned by Avanti West Coast) and one Manchester service terminating at Old Oak, plus the hourly Glasgow. But this looks like a classic case of planning by playing trains on paper. They must be existing services diverted, rather than additional trains, as capacity to run extra trains beyond HS2 does not exist. Picking ‘one of these’ and ‘one of those’ simply creates inefficient use of platforms at Manchester and Liverpool by disrupting the rolling stock circuits, and leads to uncertainty as to which station to use – do you head for Old Oak, just miss one and head back to Euston only to miss the next there, or do you wait an hour at Old Oak?
Far better would be to convert one service group to HS2 in full. That could not be the Manchesters, as doing so would deprive intermediate stations of services, but with the Handsacre link in place the two Liverpools per hour could be diverted to Old Oak and still serve Stafford. Something would need to run in the classic path south of Crewe in the peaks to maintain fast peak services for Trent Valley stations currently provided by a Liverpool dropping in, but that should not be a major timetable upheaval. The Glasgow might also work, if you really think the passengers most characterised by heavy luggage, and for whom the journey time saving is proportionately least, will be happy to struggle onto Crossrail instead of taking taxis from Euston.
The same ‘one of these’ and ‘one of those’ approach is apparent in the scenarios presented for classic services (overleaf). For instance, Watford is shown to have a stop by a Manchester train in addition to its present hourly fast Birmingham. But Birmingham by virtue of both size and proximity must be the prime generator of traffic – would it not be better to have a half-hourly service to Birmingham and make the Manchester link with a decent connection at Milton Keynes, which would still be an improvement on now?
img_58_2.jpg

Pendolino on song: No 390156 works the 17.40 Euston to Manchester service at Grendon on 29 May 2020. Jamie Squibbs
OFF-PEAK
The off-peak service proposed in the Revised Business Case manages to be both operationally complex and commercially unambitious. Good points are that Milton Keynes has six fast trains per hour to Euston – which should be spaced at regular intervals, instead of all of them in half the hour as occurs now – and a half-hourly fast service to the West Midlands. But the Trent Valley does not seem to gain anything, whereas an area that suffers from HS2 construction whilst not being served by HS2 should expect to gain from released capacity. Nor does Northampton’s service appear better than now, which is odd as the Business Case quotes Northampton Borough as supporting HS2 on the grounds that its service will improve!
The difficult train to path is the one that runs via Northampton but apparently has to make Fast line calls at Watford, Hemel Hempstead and Berkhamsted. Pathing this one at all means either bunching the fast trains, detracting from what should be a regular interval to Milton Keynes, unless you spray pathing time at them. Meanwhile the capacity consumed by the stops stands in the way of improvements for the Trent Valley and Northampton.
PEAK
If the off-peak service is pick ’n’ mix planning in action, the peak service is inspired by Jackson Pollock! Station stops are thrown seemingly at random onto the diagram, hoping some will stick. Five trains per hour to Tring have three different stopping patterns. Six trains per hour to Northampton do four different things on the way. Watford loses the call by a fast Birmingham train that it has now. Milton Keynes, having gained a half-hourly fast service off-peak to the West Midlands, reverts to hourly in the peak.
If the commercial rationale is obscure, the plan does not seem to be operationally rational either. On the Fast line, there is no pathing reason why the same stops as off-peak should not be made at Watford and Milton Keynes. Elsewhere, Von Moltke’s law applies! No plan of battle survives first contact with the enemy; no train service specification survives first contact with the graph paper. Not one but three trains per hour are now trying to make stops on the Fast line, and that just doesn’t fit. Even by flighting the other trains and thus destroying the clockface service, one can be run as far as Ledburn on the Fast before crossing to the Slow line, one to Bourne End, and the third not at all. With all these stops, the number of Fast line departures from Euston is just 12, whereas 14 should be feasible.
On the Slow line, if five trains per hour are to terminate at Tring, they must be at pretty much fixed 12-minute intervals on arrival there, just enough to reverse and clear the platform before the next turns up. So that sets a structure for the whole service; owing to different stopping patterns, it makes the service irregular at Euston. Whilst a semi-fast Bletchley or Milton Keynes train can fit in the gap between two Trings, trying to fit four trains into five gaps makes half-hourly intervals impossible, and the irregular gaps between Slow line trains makes it far from certain a Fast to Slow move at Ledburn or Bourne End will find a Slow line path when it needs one.

img_59_1.jpg

Jackson Pollock: evening peak service proposed by HS2 once the western leg of the high-speed line is open. Courtesy HS2
img_59_2.jpg

Jackson Pollock in action: diagram showing possible evening peak-hour service pattern on West Coast fast line, flighted to maximise space for slower services (110mph Class 350s shown in green, 125mph Pendolinos in red); each vertical division represents five minutes. The blue lines on the diagram show two Class 350 trains making Fast line calls at Watford, Hemel Hempstead and Berkhamsted. These are the ones for which paths can be found (HS2 proposes three such trains), and even this does not consider whether Slow line paths are available after crossing at Bourne End or Ledburn. The loss of usable capacity north of Ledburn caused by these trains is apparent, as is the irregular pattern of stops at Milton Keynes caused by flighting to maximise the opportunity for slower trains.
18TPH CAPACITY
For HS2, the intention to cater for 17 paths per hour on the Phase One core, plus an 18th as yet unallocated, is maintained. The Business Case makes reference to a University of Birmingham paper that sounds lukewarm about that intensity of usage, but by praying automatic train operation (ATO) in aid claims it is feasible. Some of the assumptions in this paper are also said to be conservative, and to my reading it contains a big logical flaw in its treatment of the effect on headway of diverging trains.
But both arithmetic and modelling show that, with European Train Control System (ETCS), a technical headway of around 120 seconds, increasing locally at features such as neutral sections to around 130 seconds, is feasible even at 360km/h (and remember that the normal operating speed will be only 330km/h).
However, the case with high-speed running is irrelevant. Where things become tricky is in slow speed areas around stations such as Old Oak and Euston, where the binding headways of up to 150 seconds are found. The signalling scheme for an intensively used station must be the product of co-operation and iteration between signal engineer, permanent way engineer and operator, whatever the top speed of trains on plain line in open country might be. What HS2 needs is signalling designed to the good old Southern Region philosophy of using signals to keep trains moving when all is well, not just stopping them when it isn’t!
But presumably not by coincidence, 18 trains per hour (tph) with 150-second technical headways precisely equates to the UIC 75% guideline for usage of capacity (that’s the 75% that Lord Berkeley for reasons known only to himself applied twice over). So as 18tph passes the theoretical tests, move on to consider the practicalities. The main fear is of late handovers from the conventional network, but with all trains having identical behaviour on the HS2 core route the key risk – of a fast train falling behind a stopper – does not arise. A late train, however late, just squeezes in and the delay decays over the next three or four trains. HS2 also has options for ‘graceful degradation’ that the existing railway does not, such as turning short at Old Oak Common to recover time or, by planning the service into 10 platforms at Euston, keeping the eleventh free for a hot standby or to accept the late running train it replaces.
img_60_1.jpg

Full service: HS2’s plan for 17tph once the full ‘Y’ is open. Courtesy HS2
HOT STANDBYS
To give extra assurance over workings at Euston, an off-peak service with a couple fewer trains might be devised, perhaps by working Newcastle trains by extending the portions detached at East Midlands from Sheffield trains, currently planned to run only to Leeds or York. But surely to goodness we are not going to spend billions on new infrastructure only to not use it to the full because we don’t trust the railway we already have – the railway we would have to continue to over-use in the absence of HS2! The message must be to make it work, by hot standbys, contingency plans or whatever, and if that also means spending money on the conventional network to minimise late running, then do that, to the good of everyone, not just high-speed travellers.
If anyone still wants to descope Euston and pack the trains into fewer platforms, the analysis makes clear how much of the claimed benefit of HS2 comes from improved reliability, so there is a lot to be lost by penny-pinching and building in a constraint that can never be eased at a location so critical as the London terminus. Yet again, there is no substitute for doing Euston properly, and as soon as possible.
img_60_3.jpg

West Coast ‘350’: unit No 350241 at Old Linslade on 1 June 2020. Fraser Pithie
FARES
Another interesting note is that the economics have been worked out on the basis fares will not change compared with now. This, one in the eye for those who claim no-one will be able to afford to use HS2, is logical, as unlike Kent and HS1, for many places HS2 will be the only service rather than being a high-speed option. The only route for which a premium might be justified is Euston – Birmingham, and the market might stand it, but why build a new railway only to price people off it?

In terms of the detailed design of the railway and its train service, this Business Case is ‘the end of the beginning’. Even so, it is a matter for some concern that a classic service should be tabled that even a little ‘back of envelope’ work shows to be so unrealistic operationally. In so far as it has a commercial rationale, it appears to be to enhance commuting services for mature markets at the southern extremity of the WCML, but this comes at a heavy opportunity cost in terms of improved services for major growth areas at Leighton Buzzard and north thereof. The serious debate on train services, especially on the classic network after HS2, must now start in earnest.
img_60_2.jpg

William Barter
William Barter is a specialist in railway operations and planning. His career started in operations management positions with British Rail, before moving on to consultancy in the UK and overseas. He is a Fellow of the Institution of Railway Operators, and tutors students on the IRO degree course modules for Operational Planning and Economics.
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,683
Location
Northampton
4 x "Avanti" (some nonstop, some WFJ)
2 x "LNR" Birmingham (Bletchley, Leighton, sometimes WFJ)
1 x "LNR" Trent Valley (maybe two) (nonstop or WFJ)

That's more than every ten minutes. Remember there are four tracks and the idea of giving the slow pair over solely to freight is just not happening nor is it necessary as freight demand just isn't that high.

== Doublepost prevention - post automatically merged: ==



Lower quality maybe. Slower (aside from 110 vs 125) is not the point here as HS1 is different as it doesn't have a growing new city on its patch. Serving MK better as it grows towards 400-500K, which will include fast trains, is a core purpose of HS2 P1. The Ashford line doesn't have an equivalent.

The official proposals exist, I'd suggest some people on this thread need to go and look at them and consider why they are as they are before proposing their own variants.

This Modern Railways article outlines the official proposals, though running WMT trains onward via Birmingham is now somewhat discredited and so I'd think unlikely. But I can't see the classic line "IC" service differing substantially from this, nor the HS2 service:

The proposals in that article are almost certainly based on HS2 reaching north of Stafford, and as such would likely not be achievable with the current limit of Handsacre.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,995
Location
"Marston Vale mafia"
The proposals in that article are almost certainly based on HS2 reaching north of Stafford, and as such would likely not be achievable with the current limit of Handsacre.

The Phase 1 only proposals are almost the same south of MKC - they take the same trains off the south WCML. There just wouldn't, for instance, be a second Trent Valley stopper.
 

marshlinker

Member
Joined
18 May 2026
Messages
208
Location
Romney Marsh
Coventry won't, its easily a 25 minute journey before you even get on a HS2 train. You're nearly at MK on the conventional network. The West Mids will still have at least 1tph fast.
Obviously not on the same scale but people said the same about Headcorn when HS1 opened. Within a year of HS1 opening Headcorn had lost a third of its traffic to Ashford International 14 miles to the East and 30 mins by car. people just adopted their railhead to the new service.
 

gg1

Established Member
Joined
2 Jun 2011
Messages
2,501
Location
Birmingham
Obviously not on the same scale but people said the same about Headcorn when HS1 opened. Within a year of HS1 opening Headcorn had lost a third of its traffic to Ashford International 14 miles to the East and 30 mins by car. people just adopted their railhead to the new service.
Not comparable.

Headcorn is a small village, most people using the station would have been driving there anyway. Coventry is a city of over 300,000 people.
 

marshlinker

Member
Joined
18 May 2026
Messages
208
Location
Romney Marsh
Not comparable.

Headcorn is a small village, most people using the station would have been driving there anyway. Coventry is a city of over 300,000 people.
How many of those 300,000 have easy access to Birmingham International and are heading to a destination that's better served by Old Oak Common (Heathrow, Crossrail, Thames Valley, West Country), quite a lot Id suggest.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,995
Location
"Marston Vale mafia"
How many of those 300,000 have easy access to Birmingham International and are heading to a destination that's better served by Old Oak Common (Heathrow, Crossrail, Thames Valley), quite a lot Id suggest.

I'd imagine much of the park and ride traffic not headed for Brum would switch, but there will be plenty arriving on foot, bike and bus who won't.

It'll be less busy but it won't be a wasteland. Village stations where basically everyone gets there by car are very different.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
670
Location
Hull
The official proposals exist, I'd suggest some people on this thread need to go and look at them and consider why they are as they are before proposing their own variants.
Nothing official about HS2 has ever been delivered so why do you think that service proposal has any standing in 10 years time? The previous timetable proposals weren't based on the HS2 fleet replacing the 390's on the classic network south of Handsacre which is what we now expect to happen due to the significant delay in HS2 being delivered. Hence the timetable is all up in the air again.

What units are going to run these 125mph services, HS2 stock will be in short supply, 390's will be gone and the 720's are 110mph so new build and more cost then? None tilt 110 vice 125mph saves very little south of Birmingham so an all 110mph timetable helps planning/capacity and may even save money on maintenance, HS2 will provide the fast services to Birmingham and north.
 