• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

What counts as a microfleet?

35B

Established Member
Joined
19 Dec 2011
Messages
5,479
Goldfish62 has brought up something I'm forever moaning at people about -- calling fleet microfleets when they're not.

I think "microfleet" has to be one of the most wrongly overused terms on this forum. In threads discussing future Southeastern fleets, Class 376 and 458/4 get described as microfleets often, for example, despite being 36 and 28 strong fleets! Working alongside a very large fleet (465s) does not make them a microfleet.
I disagree. I think the term is well used in circumstances like the 376 or 458/4 where provision of that fleet means that the trains involved require separate management for use on a common set of services, imposing additional parts and training obligations on the operator.

In these cases, it is not the absolute size of the fleet that counts, but the impact on operational management.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,720
Location
Derby
My comment is a lot of whataboutery but interested to hear your thoughts.

Would you take into account the wider scale of the fleet as well? If my imaginary TOC had 200 units of 387s but also ran 20 units of 319s, would the 319s count as a microfleet if compared to the rest of what I run?

Or say, for example, I have many of the same type of train but different classes, for example a bunch of Desiros split into fleets of 9 350s, 9 360s, 9 444s, 9 450s, but also a random fleet of 9 150s, are they all microfleets or would you lump the Desiros together and count the 150s as a microfleet?
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,484
Location
Taunton or Kent
LNER's 897s under construction must come under a microfleet, as they are only 10 of them and are very different to all the IETs they use. There may also be a similar argument for the 745s, which also have two different interior layouts and are supposed to be put on different dedicated routes (though often end up interchanging).
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,095
Location
Liverpool
LNER's 897s under construction must come under a microfleet, as they are only 10 of them and are very different to all the IETs they use. There may also be a similar argument for the 745s, which also have two different interior layouts and are supposed to be put on different dedicated routes (though often end up interchanging).
By my original definition the 897s are a microfleet in terms of numbers (just 10 trainsets) and how the role could've theoretically gone to more bi-mode Hitachi units with cost of procurement being the only factor, but they do still have some flexibility in terms of where they can be used on the LNER network. The 745 I would argue is a bit different because it's filling a unique role as an intercity unit on the Great Eastern route which couldn't have gone to a 720, but at the same time it's not exactly the same as the other express passenger units on the network.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,758
Location
SW London
Is Waterloo & City line rolling stock a microfleet? As far as I know, length is the only difference with the remaining stock on the Central line, which definitely isn't a microfleet.
I thought the two fleets had diverged on some technical respects over the years, and are now not compatible.

== Doublepost prevention - post automatically merged: ==

Should we also consider the national fleet rather than just the fleet within a particular TOC or operating area of GBR?

So while the 150s used on the Marston Vale line are a microfleet in terms of WMR, there are still hundreds of them running around other parts of the country
A bit of an exaggeration. Two 150/0s, fifty 150/1s and 85 150/2s for a total of 137.

The original 150/0s, with their unique non-driving centre cars, are without doubt a microfleet.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,187
A bit of an exaggeration. Two 150/0s, fifty 150/1s and 85 150/2s for a total of 137.

The original 150/0s, with their unique non-driving centre cars, are without doubt a microfleet.
Having been ostensibly constructed as prototype units, 001 and 002 also feature other technical nuances, as a result of various modifications throughout their working life.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,888
I'd say any fleet under 100 carriages is micro; anything under 200 is mini/midi.
 
Last edited:

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,862
Location
Cambridge
I'd say any fleet under 100 carriages is micro; anything under 200 is mini.
I completely disagree and have to say 100 carriages is way, way, way too generous for such a criteria.

That would suggest that the following are microfleets:

All 50 Class 150/1

All 42 ScotRail 156s

All 40 ScotRail 158s

All 33 Class 320s

All 30 Class 159s

All 30 (or was 30 until scrapping began) TfW 150/2s

All 21 Class 166

All 27 Class 175

All 26 Class 196

All 26 EMR 158s

All 24 TfW 158s

All 21 Class 318s

All 21 EMR 360s

And I think calling any of those a microfleet would be mad :D
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,469
Location
"Marston Vale mafia"
I think the number of units matters more than the number of coaches, as well as how many of other things the operator has. Ten 10 car units probably would be, but a hundred single car units clearly not.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,888
I completely disagree and have to say 100 carriages is way, way, way too generous for such a criteria.

That would suggest that the following are microfleets:

All 50 Class 150/1

All 42 ScotRail 156s

All 40 ScotRail 158s

All 33 Class 320s

All 30 Class 159s

All 30 (or was 30 until scrapping began) TfW 150/2s

All 21 Class 166

All 27 Class 175

All 26 Class 196

All 26 EMR 158s

All 24 TfW 158s

All 21 Class 318s

All 21 EMR 360s

And I think calling any of those a microfleet would be mad :D
We have a very different understanding of how a fleet is categorised. What we are looking to avoid when we talk about "microfleets" is a small one-and-done order of unique design that lacks significant economies of scale over its lifecycle of development, construction and operation & maintenance. In contrast to that, in my view all 158/159s are a single fleet. Obviously the nature of current rail operations mean they are used by different operators. But that doesn't mean they aren't a single fleet. Likewise 350s/360s, 320s/321s, Turbostars, etc. Basically any trains that are essentially the same design, allowing for minor, usually cosmetic, variations.

Of course we can get into a discussion about how much variation would be needed to separate trains into different fleets (for example are 220/221/222s the same fleet or related but different fleets?) Similar arguments are had between biologists over what constitutes a species, or linguists over defining the boundary between dialect and language.
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,552
Location
Northampton
We have a very different understanding of how a fleet is categorised. What we are looking to avoid when we talk about "microfleets" is a small one-and-done order of unique design that lacks significant economies of scale over its lifecycle of development, construction and operation & maintenance. In my view all 158/159s are a single fleet. Obviously the nature of current rail operations mean they are used by different operators. But that doesn't mean they aren't a single fleet. Likewise 350s/360s, 320s/321s, Turbostars, etc. Basically any trains that are essentially the same design, allowing for minor, usually cosmetic, variations.
It can do - as it places constraints on the economies of scale for operation and maintenance.
Of course we can get into a discussion about how much variation would be needed to separate trains into different fleets (for example are 220/221/222s the same fleet or related but different fleets?) Similar arguments are had between biologists over what constitutes a species, or linguists over defining the boundary between dialect and language.
I agree that the use of Family, Class and Subclass has certainly become blurred over time in a similar way to biological classifications and linguistic definitions.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,888
It can do - as it places constraints on the economies of scale for operation and maintenance.
I suppose so, but that's a risk for any train design like the Class 158/159 which is intended for nationwide use. Inevitably they are going to be worked all over the country, out of multiple depots and locations. What constrains economies of scale is not that they are distributed nationally, but that they end up operating alongside several other train types and get the 'random unit generator' problems.
 

Top