• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Normanton - platform extensions?

johntea

Established Member
Joined
29 Dec 2010
Messages
3,043
I can't find anything online other than perhaps some gossip on Facebook and my own eyes spotting some unknown works underway at Normanton whilst passing by in recent weeks but it sounds like Normanton may be getting platform extensions to allow for longer trains to stop there?

If true presumably this would then mean the 6 carriage Transpenine Express services will be able to stop there although I'm not quite sure if there is a longer term goal as it seems like quite a bit of effort just so those (quite rare) 6 carriage setups can call there, are Northern planning to run longer trains in the future with new stock and the like?

(@yorksrob will be delighted ;))
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,359
Location
Yorks
I can't find anything online other than perhaps some gossip on Facebook and my own eyes spotting some unknown works underway at Normanton whilst passing by in recent weeks but it sounds like Normanton may be getting platform extensions to allow for longer trains to stop there?

If true presumably this would then mean the 6 carriage Transpenine Express services will be able to stop there although I'm not quite sure if there is a longer term goal as it seems like quite a bit of effort just so those (quite rare) 6 carriage setups can call there, are Northern planning to run longer trains in the future with new stock and the like?

(@yorksrob will be delighted ;))

Yes, I can confirm that platform extensions are getting built - there are information boards at the station that go into some detail about the works.

It is good news - the current platforms can't quite fit a four carriage 158 satisfactorily at the moment, which can be a nuisance.

Given they've already extended them a few years back, they may as well bite the bullet and go for the full six carriage 185 length !
 

nr758123

Member
Joined
3 Jun 2014
Messages
645
Location
West Yorkshire
It's the platform length at Normanton which currently stops the Manchester-York via Wakefield service from being strengthened to six carriages at peak times. Every other station on the route has platforms which are long enough for six carriages (some with selective door opening).
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,714
Location
Leeds
Is it technically a platform *extension*, or just a refacing of the existing unused platform edges? Good news, either way.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,359
Location
Yorks
Didn't Normanton used to have humungous platforms?

It did. Two huge island platforms.

The current station occupies the east tnd of the larger island.

== Doublepost prevention - post automatically merged: ==

Is it technically a platform *extension*, or just a refacing of the existing unused platform edges? Good news, either way.

From the works, it looks as though the platforms are being extended along the existing island.

The platform edges have long gone and the rest of the island is a mound, so any extensions along it will be new.
 

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,131
Location
Derby
I presume there must be quite some difference in the permissible speeds on each line through Normanton Station?

Towards Leeds the line (Down?) is fairly straight and doesn't seem to rquire any reduction in speed. However, towards Wakefield the line has two reverse curves around the platform which certainly does require a speed reduction.

Could the Up platform be staightened somewhat to allow a higher speed for non-stop traffic through the station?
 

Tractor37

Member
Joined
23 May 2017
Messages
297
I presume there must be quite some difference in the permissible speeds on each line through Normanton Station?

Towards Leeds the line (Down?) is fairly straight and doesn't seem to rquire any reduction in speed. However, towards Wakefield the line has two reverse curves around the platform which certainly does require a speed reduction.

Could the Up platform be staightened somewhat to allow a higher speed for non-stop traffic through the station?
The linespeed on the down line is 60mph. The upline is 30mph. Could the platform be straightened out unfortunately not due to the car park. What could have been done IF THE MONEY WAS AVAILABLE before the new access for all footbridge was built about 10 years ago to replace the foot crossing from the car park to the up platform was move the whole line sideways so it goes through the next arch of Station Road bridge and rebuild the station as two separate platforms with a footbridge connecting the two. Roughly making the position of the down platform the up platform thus enabling trains to pass through in the up direction at 60 as well. A lot of money to spend to save a couple of minutes on a train service in the north
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,957
Location
York
The original Normanton had two island platforms, but the rebuilt version had just the one massive island with bays at both ends. There were ideas in late Midland Railways days to run two fast lines past the station on the west side, and the same proposal surfaced again when plans were that Normanton should once again be on the main NE/SW route (the 60-mph junction at Altofts being part of the same BR planning). Nothing came of it — and nothing is ever likely to now. Between York and Sheffield the fastest route is via Doncaster, and who these days is ever going to want a really fast route between York and Thornhill Jn?
 

70014IronDuke

Established Member
Joined
13 Jun 2015
Messages
4,076
Wasn't Normanton originally humongous because in the ancient of days, pre-Dining Cars, the Midland stopped Scottish expresses there for hungry passengers to nosh in the station restaurant? At least, that's what I was told as a nipper.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,669
Location
Nottingham
Wasn't Normanton originally humongous because in the ancient of days, pre-Dining Cars, the Midland stopped Scottish expresses there for hungry passengers to nosh in the station restaurant? At least, that's what I was told as a nipper.
It was also the meeting point of the Midland, L&Y and North Eastern, so I guess a fair amount of shunting and loco changes?
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,714
Location
Leeds
It was also the meeting point of the Midland, L&Y and North Eastern, so I guess a fair amount of shunting and loco changes?
And passenger changes. Photos of the old Normanton station show a substantial platform building, accessed via a bridge from the car park side. I don't remember seeing two island platforms though...

Adding two platformless lines from Goose Hill to Altofts would work for the semi-fasts, and there's space for them. But it would be an expensive solution for two semi-fast trains per hour, with everything else stopping there (unless freight used them, which would risk blocking the semi-fasts). It would only be 2.6km (1.6 miles) long, unless you extended the western end closer to Wakefield. You would be on the correct side to/from Methley though.
 

Top