Class 810 for East Midlands Railway Construction/Introduction Updates

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Killingworth

Established Member
Joined
30 May 2018
Messages
6,479
Location
Sheffield
EMR's latest update has just been issued to Stakeholders this morning, see; https://eastmidlandsrailway.newswea...xnlw1f3wzioz?lang=en&a=6&p=13337927&t=4918378

It's long so the most important bit is here, but there's more.

An update from Neil Grabham, Interim Managing Director​

There are encouraging signs of continued progress across our Intercity services, with fleet availability improving and punctuality increasing by around 2 - 3% last week compared with the previous week, particularly on our Sheffield services.

Importantly, since we increased the timetable to 92% of the full Intercity service on 1 September, fleet availability has consistently met or exceeded the requirements needed to deliver the timetable. This gives us greater confidence to begin planning the next step towards our timetable restoration, with our next phased proposed increase taking the service to 96% of the full timetable.

However, we recognise that performance is not yet where we want it to be. Cancellations remain a challenge and the impact of previous hot weather on track quality, alongside associated speed restrictions, continues to affect punctuality. We are working closely with Network Rail to prioritise the work needed to address these issues, while continuing to work with Hitachi to improve fleet reliability.

We are also continuing to explore options to strengthen the Intercity fleet, including the potential to lease additional trains, which could provide greater resilience as we work towards restoring the full timetable.

There is still more to do, but the continued improvement in fleet availability and punctuality is a positive step forward. Our focus remains on building a reliable and sustainable service, and we will keep our customers and stakeholders informed as we take the next steps towards restoring the full Intercity timetable.
 

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,715
Location
Derby
There's a pair of 222s currently at Etches Park on hand back works, couldn't see which. One debranded and shiny, the other missing a driving car and having bodywork repairs.
014 is the one missing the driving car, and the other should be 017, both undergoing dilaps. I don't believe anything else has been removed from service yet

== Doublepost prevention - post automatically merged: ==

I'm hearing from a friend tomorrow will see 10 car 810s in service, I doubt it but keep an eye out
Highly doubtful
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,481
Location
Taunton or Kent

Amos390

Member
Joined
22 Jan 2025
Messages
755
Location
Nottingham
810012 sat down at Notts earlier today, not sure what the issue was but it seemed to have the rest of its diagram covered by a 222 as far as I could tell
 

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,715
Location
Derby
810012 sat down at Notts earlier today, not sure what the issue was but it seemed to have the rest of its diagram covered by a 222 as far as I could tell
it didn't "sit down", it was sent back to the depot and replaced by 810014. Not sure why
 
Joined
23 Dec 2008
Messages
360
810012 sat down at Notts earlier today, not sure what the issue was but it seemed to have the rest of its diagram covered by a 222 as far as I could tell
I was on 012 on Saturday 1202 from Nottingham, it ran mostly without problem, but did notice the charging point stopped working and no hot water for drinks on last run of drinks in 1st class around Corby Kettering area.
 

tram21

Established Member
Joined
29 Dec 2022
Messages
1,318
Location
Nottingham
Yesterday 012 and 010 both suffered quite major faults, the latter causing lots of disruption due to crew displacement etc across Regional and Intercity.

This morning 016 made it (eventually) to Wellingborough after losing 30 mins on its journey, where it was eventually cancelled.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,930
Location
Northampton
Went for a relaxing trip around the scenic route today.

My planned outward journey from Wellingborough was the 09.52 Nottingham, 810016 expired in the down slow platform 'problem with the brakes'
Return journey intended to be the 13.15 from Loughborough which never left Sheffield, 'Problem with the doors' on 810012
Pseengers from Sheffield didn't have a great deal of luck; later 810014 had a 'problem with its doors'

Curiously to me, passengers intending to travel to Nottingham on the 09.52 were told to wait until the next Nottingham at 11.11.There was a Sheffield at 10.22 but passengers were told that here was no connection off that for Nottingham. However, I caught the 10.22 Sheffield (for Loughborough) and somewhere between Melton and Syston there was an announcement that a special train for Nottingham would be waiting at Loughborough. Which there was, 810013. So the service left St Pancras and arrived at Nottingham, so that's all right then. Box ticked by Hitachi ???
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,369
Went for a relaxing trip around the scenic route today.

My planned outward journey from Wellingborough was the 09.52 Nottingham, 810016 expired in the down slow platform 'problem with the brakes'
Return journey intended to be the 13.15 from Loughborough which never left Sheffield, 'Problem with the doors' on 810012
Pseengers from Sheffield didn't have a great deal of luck; later 810014 had a 'problem with its doors'

Curiously to me, passengers intending to travel to Nottingham on the 09.52 were told to wait until the next Nottingham at 11.11.There was a Sheffield at 10.22 but passengers were told that here was no connection off that for Nottingham. However, I caught the 10.22 Sheffield (for Loughborough) and somewhere between Melton and Syston there was an announcement that a special train for Nottingham would be waiting at Loughborough. Which there was, 810013. So the service left St Pancras and arrived at Nottingham, so that's all right then. Box ticked by Hitachi ???
No boxes ticked by Hitachi for the Nottingham service. As if I read your post right the original service from London failed on route and did not reach Nottingham.

If the performance regime/contract is how it should be, that is a failure on Hitachi's part to fulfil a service.

It's irrelevant that another unit was provided to work from Loughborough into Nottingham.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,930
Location
Northampton
No boxes ticked by Hitachi for the Nottingham service. As if I read your post right the original service from London failed on route and did not reach Nottingham.

If the performance regime/contract is how it should be, that is a failure on Hitachi's part to fulfil a service.

It's irrelevant that another unit was provided to work from Loughborough into Nottingham.

Thanks, that's how it should be.

Just aware of some of the tricks to achieve KPIs, I wouldn't have put it past them.
 