• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

West Midlands Trains "Destination Manchester" - will it happen?

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,620
Location
Crewe
Why couldnt the new service skip Alderley too? There's no reason why it has to call there. If LNWR deem it not worth their time, then so be it.
One would like to thing this has been introduced based on planned passenger numbers along with future housing developments near stations. There will be a reason why it isn't calling there, be that resilience or otherwise.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,424
Location
A typical commuter-belt part of north-west England
One would like to thing this has been introduced based on planned passenger numbers along with future housing developments near stations. There will be a reason why it isn't calling there, be that resilience or otherwise.
What is the future housing developments projection figure for the Alderley Edge area that will increase the current population there?
 

lowe1409

Member
Joined
6 Feb 2024
Messages
259
Location
Cheshire
What is the future housing developments projection figure for the Alderley Edge area that will increase the current population there?
Asides from a odd few mansions here and there, not a lot. AFIK there's no plans for any development in the area. The closest is a patch of land between Wilmslow High school and the Bypass on the southern side, which would be better served by Wilmslow station anyway.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,809
Alderley Edge will lose roughly half its services to Crewe, and all its services to the Airport (and other stations up the Styal Line).
 

ayubdaud

Member
Joined
11 Mar 2020
Messages
82
Location
Bolton
What is a problem is that it's skipping Alderley Edge while stopping at Holmes Chapel and Sandbach. I'm inclined to give WMT the benefit of the doubt - I don't know why it's being skipped and I'm sure there's some factor that apparently made it unviable - but since it's not a pathing issue if it's just taking over the current NT path, it makes very little sense. Alderley Edge - Manchester Airport by train was done 5,360 times last year, which is not a huge figure (note there's also a bus that runs every 1-2 hours) compared to how many people are doing the same journey by car, but if passenger stats was what determined whether a call makes sense or not, it'd also skip Sandbach and Holmes Chapel.
It's taking over the NT path in a quantum sense, but the path to/from Airport and Crewe is different to allow the rest of the path to work, based on how the paths are currently presented for Dec 26.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,620
Location
Crewe
I wondered that, seems a bit odd :s
As has been pointed out on here many times already, it's not about connecting Birmingham to Manchester Airport (though there will be people making that journey due to more choice of flights/destinations).

It's almost 2 services that cross over into another. It allows Stoke and Stone a direct train to Birmingham again, and allows them a connection to the airport too. It also allows the likes of Willenhall/Darlaston/Tame Bridge a quicker connection to Stafford for connections north etc.

Nobody is expecting it to be full of end-to-end travellers. But it will be busy on the whole.

== Doublepost prevention - post automatically merged: ==

Asides from a odd few mansions here and there, not a lot. AFIK there's no plans for any development in the area. The closest is a patch of land between Wilmslow High school and the Bypass on the southern side, which would be better served by Wilmslow station anyway.
Exactly. Would probably be classed as a low growth area then given it's relatively low current patronage.
 

Transilien

Member
Joined
10 Mar 2024
Messages
740
Location
Ayrshire
Will this service do anything to help the notoriously overcrowded Manchester-Birmingham cross country services? Because if not, this service has no point in existing.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
259
Location
Cheshire
Will this service do anything to help the notoriously overcrowded Manchester-Birmingham cross country services? Because if not, this service has no point in existing.
I'm sure LNWR will do their usual thing and offer 'LNWR & Northern' routed tickets via the airport as well as directly supplementing stoke-wolverhampton-birmingham
 

Bumpkin

Member
Joined
23 Aug 2017
Messages
95
Will this service do anything to help the notoriously overcrowded Manchester-Birmingham cross country services? Because if not, this service has no point in existing.
As SCDR_WMR said just before your post, this train isn't necessarily designed for end to end travellers but is two services stitched together to serve different travel patterns. A Stoke and surrounding areas service to Manchester Airport and Birmingham, and a connection for stations on the Walsall-Wolverhampton line connections northwards to Crewe and Stafford.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,105
Location
Wilmslow
I'm surprised about Alderley Edge being omitted; when the paths were first defined in or before 2018 they required the service to be semi-fast to give enough turn-around time at Crewe, and indeed generally prevented Styal calls because of this. But the post-2018 timetable seems to have sorted this out, and whilst I can see why Chelford and Goostrey don't get calls I'm surprised if Alderley Edge doesn't.

If the service had existed years ago when I used to go to Birmingham frequently then, yes, I'd have used it. I avoided the dreadful overcrowded XC services even though going via Stockport is a permitted route, and I'd use connecting services into/out of the Birmingham-Liverpool services at Crewe.

As for travelling by train to airports, I can only say that my experience will hardly be unique in that I've used the train to Liverpool, Leeds/Bradford, Birmingham, Gatwick, Stansted and Heathrow airports in the past from quick memory. For me I'm happy taking a train for a single hop journey in preference to flying from my very local Manchester airport and having to change. Ironically I've given up using the train to/from Manchester Airport because it became too unreliable and pay for a taxi instead nowadays.
 

tutacre

Member
Joined
27 Feb 2026
Messages
90
Location
Cheshire
People often don't realise that Transport for Wales have limited calls at Alderley Edge too, not huge numbers at the moment, but 2/3 trains most days. If Alderley Edge does need more trains from the Crewe direction (which is somewhat of a stretch, given vast majority of traffic is mainly to/from Manchester), a couple of select Class 197 services may be viable in the future. 1W01 also goes fast to Manchester via Styal.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
259
Location
Cheshire
Having spoken to a few contacts who use the Styal Line, I shall note one particular comment....."How much extra time will this add to a regular working-day direct train journey from Gatley to Wilmslow and return"
Assuming the airport to Piccadilly stopper retains it's timings, and judging the timings based on the timings at Crewe for the LNR service to Birmingham via stoke, id estimate leaving gatley at the same time, arriving in Wilmslow around 10 minutes later than at present. And on the return, leaving Wilmslow about the same time northbound, getting to gatley at the same time.

Unless that 10 minutes In Wilmslow in the morning would make them late, hence having yo travel on the earlier service, the impact to working days would be almost negligible
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,774
Location
West of Andover
I can see the merit in extending the Crewe - Stafford shuttle back to Birmingham via Tame Bridge (maybe at the same time putting the Shrewsbury stopper back to running via Smethwick to cut journey time lol). But extending to Manchester Airport just seems a repeat of the failed 2019 (?) timetable of London - Rugeley/Liverpool via Birmingham.

At the moment the shuttle can use bay platforms 2-4 at Crewe, but extending to the Airport it will need to use P1 or P5 (P6 if they want it to cross the WCML twice). And Crewe is a busy junction station where an on time Manchester bound service can lose time waiting for a platform, especially if it is planned to run behind a fast service.

How many people are crying out for a direct train from Longport to Manchester Airport etc?
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,130
Also the remaining Northern service into Crewe will stand in platform 1 at Crewe from 58 to 46 from May 2027 unless it goes into a siding (which may be the plan).
 

OrangeJuice

Member
Joined
4 Jun 2018
Messages
210
Also the remaining Northern service into Crewe will stand in platform 1 at Crewe from 58 to 46 from May 2027 unless it goes into a siding (which may be the plan).
This is what has happened on Sundays and the evenings before where it shunts to the siding outside platform 1 on the north side
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,105
Location
Wilmslow
Train services from Alderley Edge to be reduced. I have sent a correction pointing out that Alderley Edge to Crewe will be reduced to one train per hour from May 2027. The first comment details remaining Northern services between Manchester Airport and Crewe from May 2027.
Thanks, the first comment text:
Some improvement to frequencies & hours of operation as well as Sunday service.

Northern will retain route knowledge on early morning services and some positioning additional trains, timetable subject to validation.
Unfortunately, insufficient capacity on the route to include calls at Alderley Edge throughout most of the day while also robustly linking the paths north & south of Crewe.
The industry view clear that performance of a myriad of services on the WCML cannot be compromised. Extensive performance modelling has been undertaken over the summer.

Crewe to Manchester Airport
Service
• Transfers to West Midlands Trains Business Unit from May 2027 timetable change
• Northern operates limited services Manchester Airport-Wilmslow/Crewe
EWD)
2A49FA 0044 Crewe - Piccadilly (MX)
• 2A80FA 0546 Wilmslow - Piccadilly (EWD)
• 2A81FA 0616 Crewe - Piccadilly (EWD)
• 2A86FB 2144 Wilmslow - Piccadilly (EWD)
• 2F19FB 2244 Wilmslow - Liverpool (EWD)

• 2A91FA 0523 Piccadilly - Crewe (EWD)

• 2A92FA 0636 Piccadilly - Crewe (EWD)

• 2A03FA 2136 Piccadilly - Wilmslow (EWD)

• 2A04FA 2236 Piccadilly - Wilmslow
 
Last edited:

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,037
Location
Frodsham
As has been pointed out on here many times already, it's not about connecting Birmingham to Manchester Airport (though there will be people making that journey due to more choice of flights/destinations).

It's almost 2 services that cross over into another. It allows Stoke and Stone a direct train to Birmingham again, and allows them a connection to the airport too. It also allows the likes of Willenhall/Darlaston/Tame Bridge a quicker connection to Stafford for connections north etc.

Nobody is expecting it to be full of end-to-end travellers. But it will be busy on the whole.

== Doublepost prevention - post automatically merged: Yesterday at 10:55 ==
Quite , it wont be full of passengers from Birmingham going to Manchester Airport, there is no point for the air passenger.
 

Top