KCC have awarded Erith Contractors Ltd an £18.6m contract to deliver the BSIP-backed Bean Road Underpass between Bluewater and Whitecliffe, which will form part of the Fastrack network on completion.

£18.6 million contract awarded to deliver the Bean Road Underpass​

Date 12 January 2026

Kent County Council (KCC) has awarded the £18.6 million contract to Erith Contractors Limited to deliver the major Bean Road Underpass project - a key element of the Fastrack programme, which aims to improve sustainable transport links across Kent Thameside.

Part funded by the Department for Transport, the project supports KCC’s Bus Service Improvement Plan, designed to encourage greater bus use and make Kent’s services more sustainable for the future. Further funding has been provided by Ebbsfleet Development Corporation and Bluewater, plus a contribution from Eastern Quarry Ltd.

The Bean Road Underpass will create a new 75-metre tunnel beneath the B255 Bean Road, connecting Whitecliffe (formerly Eastern Quarry) with Bluewater Shopping Centre. This direct link will form part of the Fastrack bus rapid transit system, improving connectivity between new residential developments, Bluewater, and Ebbsfleet International Railway Station.

The underpass will include a Fastrack busway, as well as a footway and cycleway.

Peter Osborne, Cabinet Member for Highways and Transport, said: “This £18.6 million investment marks one of the most significant infrastructure projects in Kent Thameside in recent years. The Bean Road Underpass will transform how people travel across the area, creating faster, greener connections between new communities, Bluewater, and Ebbsfleet International.

‘Thanks to funding from the Department for Transport, Ebbsfleet Development Corporation and Bluewater, plus a contribution from Eastern Quarry Ltd, this project will deliver long-term benefits for residents, businesses, and visitors.”

Pre-construction survey works will need to take place from January to allow essential monitoring equipment and rock netting to be installed ahead of the main tunnelling works, which are scheduled to begin in Summer 2026.

For the safety of the teams carrying out the works, staggered lane closures will need to be in place on the B255 and Bluewater Parkway for up to five months.

To reduce the impact on road users, the works have been carefully planned to minimise disruption where possible, including nighttime closures where possible.

For more information about this project, visit: Bean Road Fastrack Scheme - Kent County Council.

ENDS
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,554
By coincidence I visited Bluewater on the recent Fastrack 20th anniversary Running Day last Saturday. The most unexpected sighting for me was an e.City Gold - previously 1515 of Transport UK, now 6515 in Go Bus yellow & purple!

Go Bus 6515 BV20GRU at Bluewater (front).jpg Go Bus 6515 BV20GRU at Bluewater (rear).jpg

Where the current fleet of electric buses is concerned there's still no sign of a tender notice for the Dartford charging hub that received planning permission 6 months ago. At this rate we may have to wait until 2028 for the Irizars to be fully utilised.

Infrastructure-wise the commencement of Bean Road Underpass works was marked by a ceremony last month. More details in the monthly newsletter quoted below.

• A ground-breaking event was held in mid-April to mark the commencement of works for this ground-breaking scheme.
• The event brought together representatives from Kent County Council, project partners and delivery teams to mark progress for the scheme, aiming to improve public transport and active travel connection across Kent Thameside area.
• This event marked the culmination of extensive planning, surveys and preparatory activities, and highlighted the close collaboration between KCC, Erith and the wider project team.
• The partnership approach has been central to progressing a technically challenging scheme while balancing safety, environmental management and the needs of the surrounding community.
Over the next 2 monthsworks will include:
• Establishment of site hoarding within Bluewater for welfare and to delineate working areas.
• Implementation of closure on Bluewater Parkway to enable start of civil works within verge.
• Start of excavations at Bluewater cliff face to remove existing reed bed, install surface water temporary diversions, and export excavated material off-site.
• Commencement of rock netting activities on cliff faces from the B255 and from bases of cliffs.
 

SeveerYeliab

Member
Joined
21 Dec 2018
Messages
122
It is being reported on Facebook that Kent Country have won a number of KCC tenders from 26th June/1st August 2026, which will see quite a large expansion of PVR. Sadly, this means that Redroute buses lose all of their service work, and I believe a number of school services from September.

We are extremely pleased to announce, that we have been awarded the following routes by Kent County Council

➡️ Dart 1, 2 & 3,
(commencing 1 August)

➡️ Route 414
(commencing 1 August)

➡️ Route 308 & 306
(commencing 29 June)

➡️ Route 416 & 417
(commencing 29 June)

We are so excited to start serving the communities on these routes.

Further information will be shared with you as we progress mobilising these services and #timetables will be available soon.

Exciting times! #KentCountry is growing!!!


 

Lynford1976

Member
Joined
3 Oct 2015
Messages
218
It is being reported on Facebook that Kent Country have won a number of KCC tenders from 26th June/1st August 2026, which will see quite a large expansion of PVR. Sadly, this means that Redroute buses lose all of their service work, and I believe a number of school services from September.





According to bustimes.org, Redroute's schoolday-only routes have gone as well:

- 408 to Go Bus
- 418W to 1st Bus Stop (as 418).
 

duncombec

Member
Joined
3 Sep 2014
Messages
1,163
Sadly, this means that Redroute buses lose all of their service work, and I believe a number of school services from September.
According to bustimes.org, Redroute's schoolday-only routes have gone as well:

- 408 to Go Bus
- 418W to 1st Bus Stop (as 418).

Exact details are (unsurprisingly) difficult to come by, but the general consensus is that services were retendered (306/308/416/417) at Redroute's request, as was giving up the remaining services (408/418W). They were not on the original tendering program for this summer, and were added (and awarded) at short notice, hence why they begin on 29th June, rather than 1 August in line with the other services.

Some may remember that Redroute had registered all the "public" services a year or two ago, before re-winning the tender.
 

opio223

New Member
Joined
16 Jun 2026
Messages
1
Location
London
Latest update from Kent Country Facebook, looks like the 306/308 will be making a return to Bluewater, as well as a "Green Rover" ticket for the new network.

KentCountry308.png

Set to commence on 29th June.
 

alex397

Established Member
Joined
6 Oct 2017
Messages
2,039
Location
UK
I haven’t tried out these services they have recently won yet, but I am impressed with the publicity by Go-Ahead here. The social media is decent, and they actually reply to people. Not so much of the corporate nonsense you often get from Arriva and Stagecoach either.

It is good to see the commercial extensions to Bluewater which might help to make the services more useful. I guess they are also good for operational reasons, with driver changeovers and breaks at Bluewater. The 416 extension to Bluewater is clearly not going to be much use to people due to the timings, but passengers on the 308 and 417 could get a decent shopping trip in.

I have seen some social media commentary wondering why these Bluewater extensions can’t apply on Saturdays too. That’s understandable, but there’s only so much Go-Ahead can do.

There’s also a few comments about the age of the vehicles. I don’t understand why some are so concerned about the age - I’ve always thought it’s the cleanliness and comfort that matters far more than age. Last year I went on a 2004 registered Volvo up north, and it was a lovely vehicle because it was clean and comfortable. Kent Country have tended to refresh / refurbish vehicles, so I’m not sure what the issue is. Especially compared to the state of the vehicles previous operator Redroute ran, as well as the state of the Darts that Arriva Northfleet are still running.
 

MotCO

Established Member
Joined
25 Aug 2014
Messages
6,147
I don’t understand why some are so concerned about the age -
Put a few 'select' registration plates on, and few people would know the difference between a refurbed bus and a new one.
 

markymark2000

On Moderation
Joined
11 May 2015
Messages
5,138
Location
Great Britain
It is good to see the commercial extensions to Bluewater which might help to make the services more useful. I guess they are also good for operational reasons, with driver changeovers and breaks at Bluewater. The 416 extension to Bluewater is clearly not going to be much use to people due to the timings, but passengers on the 308 and 417 could get a decent shopping trip in.
I have seen some social media commentary wondering why these Bluewater extensions can’t apply on Saturdays too. That’s understandable, but there’s only so much Go-Ahead can do.
The times to/from Bluewater look to match up perfectly in line with driver changeovers to save on shunt cars to/from Gravesend and so I commend them on making the extensions.

As for why it's not done on Saturdays, i'd strongly presume it's because the 416 and 417 drop from 2 buses Mon-Fri down to 1 bus on Saturdays and the bus duty, looks to work to make it a pretty 1 bus, 1 driver situation with the breaks built in. To add more there would mean more resources for little gain. Though if the Monday-Friday kicks off, then who knows what is to come?
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,554
Where the current fleet of electric buses is concerned there's still no sign of a tender notice for the Dartford charging hub that received planning permission 6 months ago. At this rate we may have to wait until 2028 for the Irizars to be fully utilised.
Turns out I was dead wrong - most of the Irizars are tracking today and there are just five Citaros left in the fleet, which wouldn't be possible without the Dartford hub being operational.


In hindsight it was obvious the VEV infrastructure contract covered the whole scheme and not just one hub, so there was never a need for another tender. I'm just glad my pessimism was way off the mark.
 

duncombec

Member
Joined
3 Sep 2014
Messages
1,163
Turns out I was dead wrong - most of the Irizars are tracking today and there are just five Citaros left in the fleet, which wouldn't be possible without the Dartford hub being operational.


In hindsight it was obvious the VEV infrastructure contract covered the whole scheme and not just one hub, so there was never a need for another tender. I'm just glad my pessimism was way off the mark.

The Dartford Hub is not yet operational. (See bustimes tracking; the A service stops short at Dartford Station).

That said, the works are ongoing at the present moment, and in the last month or so things at Acacia Hall have moved from a large hole in the ground to a resurfaced road with three chargers installed, so a start of service is probably expected within the next month or so, once testing takes place.

A number of journeys seem to take a vehicle swap at the depot, which allows more Irizars to be used.

Of note, the tarmac at the Gravesend chargers now has a number of deep indentations (a good inch below road level), where it appears the tarmac had a "melting moment" in the recent heatwaves, with vehicles always needing to line up in the same place. There is a very noticeable jolt as the bus has to force it's way out of the dip, over the lump created where the tarmac has pushed forwards and onto the road proper... I thought we'd hit the kerb last week!
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,554
Thanks for the clarification. I didn't know they'd found a way to improve Irizar utilisation beyond the previous interim state (17 out of 28) inferred by the planning docs in post #58 whilst still waiting on Acacia Hall.
 

Top