They will need off wire capability for the regular diversions via Castleford / Brighouse / Hebden Bridge / etc.
And as has been discussed, diversionary use does not usually make for a strong business case.

I suspect they run the numbers, but I doubt that changing the existing diesel bi modes into battery bi modes will work out favourably.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,874
And as has been discussed, diversionary use does not usually make for a strong business case.

I suspect they run the numbers, but I doubt that changing the existing diesel bi modes into battery bi modes will work out favourably.

Exactly, so there won’t be a case spending money on eliminating the ‘off wire’ capability of the 802s by removing the engines.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
Exactly, so there won’t be a case spending money on eliminating the ‘off wire’ capability of the 802s by removing the engines.
No, leaving them as they are is by far the most likely outcome.

Would be interesting to see what a replacement of the 802s would be (I'd advocate for straight electrics), but that's a different question.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,638
Location
Greater Manchester
Has somebody got a date for when Standedge tunnel might be wired then?
Is being done as part of TRU, not sure of the exact timeline but Stalybridge - Huddersfield will be one of the last sections.
Is not part of the point of batteries that they might be able to leave out complicated bits like that?
Someone better tell Northern then since they're in the process of producing pure EMUs for operation over the Transpennine route.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,649
Location
"Marston Vale mafia"
Once the Transpennine upgrade is complete, will there be the need for those regular diversions?

It's good to provide them for shorter term engineering works and emergencies. The diesel abilities of the ECML 80x are very useful for such things. It also potentially reduces evacuation time in the event of a not-too-bad wires-down incident or a power outage - power off, pan removed, untangle things then drive it back to the nearest station at low speed, then you've got the passengers out of the way to spend time concentrating on getting the wires back up.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,612
Location
Northampton
It's good to provide them for shorter term engineering works and emergencies. The diesel abilities of the ECML 80x are very useful for such things. It also potentially reduces evacuation time in the event of a not-too-bad wires-down incident or a power outage - power off, pan removed, untangle things then drive it back to the nearest station at low speed, then you've got the passengers out of the way to spend time concentrating on getting the wires back up.
And perhaps more importantly for all the otherwise perfectly fine trains stuck in the isolated electrical section, as they don't need to wait for an OLE team to come out and reduce the isolation limits before they can start moving again.
 