Getting the most out of the new Alstom units for TPE?

Northerngirl

Member
Joined
16 Aug 2023
Messages
504
Location
Wirral
The platform can clearly take more doors as their own website shows, however it is also advised as a commuter train, hardly a 'great' intercity train, 110 is laughably slow aswell

== Doublepost prevention - post automatically merged: ==

Where are the pictures of the seats? Not seen any pictures of the interior yet.
Quite visible in the render showing the level boarding, and its hardly a surprise that they would spec the cheapest option
 

Attachments

  • Adessia 1.png
    Adessia 1.png
    4.4 MB · Views: 587
  • TPE-TRU-Trains-3.jpg
    TPE-TRU-Trains-3.jpg
    89.6 KB · Views: 577
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
7,343
The platform can clearly take more doors as their own website shows, however it is also advised as a commuter train, hardly a 'great' intercity train, 110 is laughably slow aswell
Without seeing a full picture of the whole train I think only the leading carriage will have one door and all intermediate coaches will have 2.

== Doublepost prevention - post automatically merged: ==

The platform can clearly take more doors as their own website shows, however it is also advised as a commuter train, hardly a 'great' intercity train, 110 is laughably slow aswell

== Doublepost prevention - post automatically merged: ==


Quite visible in the render showing the level boarding, and its hardly a surprise that they would spec the cheapest option
A picture which shows 2 seat backs is hardly a basis to form an opinion on what the seats on the train will be like.
 

RUK

Member
Joined
5 Aug 2009
Messages
446
Location
East of England
Alstom have shown some designs with unusual door designs before - this was the X’TRAPOLIS UK which they offered for Thameslink:

1789079031804.jpeg

It seems that not all GBR trains will have yellow fronts, which is a disappointing inconsistency.
 

Attachments

  • IMG_1780.jpeg
    IMG_1780.jpeg
    12.3 KB · Views: 232
Last edited:
Joined
8 Feb 2021
Messages
1,045
Location
Manchester
Are these going to be specialist charging facilities, rather than just OHLE in the platforms?

The announcement is certainly good news, and would not be surprised if other operators seek follow-on orders of this fleet type where appropriate.
“25kV OHLE conductor bars fed off local electricity supplies”

Apparently the seats are to be spaced out more along with fewer but bigger windows to ‘maximise views for customers’
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,067
Location
Liverpool
The level boarding is a welcome addition, and I don't think the design itself looks too bad aside from the somewhat messy livery. I won't hide my disappointment of it being financed by Rock Rail though because I hoped ROSCOs would be a thing of the past by then. But hopefully the new fleet will be an improvement over the 185s which will be almost thirty years old by the time the fleet is ready (or at least supposed to be ready).
 

Grimsby town

Member
Joined
4 Apr 2011
Messages
861
Seems a strange decision to me. For one, 110mph seems to slow for the ambitions for new highspeed rail infrastructure in the north which is surely going to be 140mph capable. Yes that's still likely two decades away but these trains will only be ~10 years old at that point.

The 120 metre length also seems far too short. The government are spending £10 billion on infrastructure upgrades, including extending platforms to 200 metres, only to order trains nowhere near the length that can be accommodated. The upgrade is definitely going to induce additional travel and yet this seems to only be a small increase in capacity over the existing class 185s.
 

1D53

Established Member
Joined
2 Apr 2006
Messages
2,888
Intermediate coaches have 2 doors.

Those saying 2034 is a long time need to remember these are for use on TRU, the electrification of Huddersfield to Stalybridge doesn't complete until 2032. If introduced earlier would they have sufficient battery range considering the hilly nature of this section combined with the requirement to then run to Hull/Saltburn etc for a charge.
 

ox_chap

Member
Joined
7 Jun 2026
Messages
73
Location
Oxfordshire
Great news. Now can we also order some 10 car versions, add a 3rd rail pickup on the side, and run them Bournemouth to Manchester at a 30 minute frequency.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,370
Location
LBK
Just 5 cars again will be another topic of contention in 15 years time. Hideous front on it!
 

RUK

Member
Joined
5 Aug 2009
Messages
446
Location
East of England
This post on the previous, now locked, thread about the TPE procurement (which was known to be 5-car units) basically predicted what would happen - ~24-metre-long vehicles, Aventra-derived, 110 mph:

 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,463
Location
Sheffield
Intermediate coaches have 2 doors.

Those saying 2034 is a long time need to remember these are for use on TRU, the electrification of Huddersfield to Stalybridge doesn't complete until 2032. If introduced earlier would they have sufficient battery range considering the hilly nature of this section combined with the requirement to then run to Hull/Saltburn etc for a charge.
2 doors on intermediate units clearer here. Adessia at Hull.jpg

== Doublepost prevention - post automatically merged: ==

Surely the 185's will be cascaded to replace Northern 15x units.
Sent to whatever EMR becomes to cover Liverpool - Nottingham, displacing 158s?
 

RUK

Member
Joined
5 Aug 2009
Messages
446
Location
East of England
It looks like they will have a plain blue carriage as the centre one of 5, as the Class 720s do. Black cab roofs, like the re-painted (rather than vinyled into GBR livery) Class 357s, with dark grey roofs behind the cabs. The horn grille position seems to look more like that on the Bombardier Talent 2/3, having moved down a bit from on the Aventra. I’m not sure about the blobby, rounded front - it looks like a Paris Métro train - I suppose Alstom are French, and built a lot of those, after all. It might have been interesting to see the SIEMENS Desiro Verve UK, as a follow-up to their Class 185s that TPE have now.
 
Last edited:
Joined
16 Oct 2024
Messages
18
Location
Up North
Main thing that worries me is if it takes until 2034 to put a train into service if you order it now … how long is it going to be before we are rid of the 150s/156s? I thought northerns plans were for replacement to start 2031/2
 

positron

Member
Joined
18 Oct 2022
Messages
676
Location
Cardiff
I was just about to make a comment asking how they placed and order without a procurement but it seems I missed one. I'd only heard about the orders for ScotRail, Northern and GWR/SWR/Chiltern.

I too wish the ROSCOs would be removed but GBR explicitly doesn't include that for silly reasons.

Regarding 110MPH that doesn't seem unreasonable, from what I can tell these trains are for stopping services more than the super fast express services (where 125 might actually be helpful). TRU doesn't seem to adding much 125MPH track anyway.

Step-free boarding - the "elimination of gaps between the train and platform" - are also being promised as part of a commitment to accessibility, alongside three dedicated wheelchair spaces, two accessible toilets, family-friendly areas and cycle and buggy storage on each train.

This from the BBC article linked up thread is good to read. Multiple wheelchair spaces, and also some decent buggy storage
Obviously the key bit is the level boarding which thankfully I think will be required for all new train procurements.

== Doublepost prevention - post automatically merged: ==

I wonder where the batteries are in these units? Presumably not enough room under floor?
 

CapabilityB

Member
Joined
27 Feb 2022
Messages
64
Location
York
Main thing that worries me is if it takes until 2034 to put a train into service if you order it now … how long is it going to be before we are rid of the 150s/156s? I thought northerns plans were for replacement to start 2031/2
Think in this case it's a mixture of: construction schedule, extra infrastructure capacity available for testing and driver training, full infrastructure capacity available for delivery of passenger benefits.

It's not a standalone project but intrinsically linked with TRU infrastructure.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,857
Location
west yorkshire
Disapointing 2026 to 2034 build 29 trains. That's about not far off the duration of both World wars.
Must do better or the much slicker Chinese will do the same as they have with the euopean car makers. To be successfully in business it is said you have to be slick.
K
 

Crithylum

Member
Joined
21 May 2024
Messages
336
Location
London Borough of Ealing
Regarding 110MPH that doesn't seem unreasonable, from what I can tell these trains are for stopping services more than the super fast express services (where 125 might actually be helpful). TRU doesn't seem to adding much 125MPH track anyway.
The door arrangement however does not make sense for stopping services. Wide double leaf doors (and 2 per side on all carriages) would make more sense.

I wonder where the batteries are in these units? Presumably not enough room under floor?
Almost certainly under the floor. As a conservative estimate, there will be at least 5 m^3 per carriage (0.5 x 1 x 10m), enough for at least ~10 tonnes of battery per carriage. As per my calculations on this thread https://www.railforums.co.uk/thread...eration-using-class-897-as-an-example.306652/, a 9 car pendolino only needs ~50 tonnes total for London to Glasgow. Unlike diesel engines, batteries can be put basically anywhere in any somewhat reasonable shape, as long as the battery is designed for that specific shape.

The price tag of "almost £1bn" seems quite high. IIRC SWR got the equivalent of 150 5 car Aventras for about £900m, and EMR got 33 5 car trains for ~£400m. Have prices really gone up that much?
 

positron

Member
Joined
18 Oct 2022
Messages
676
Location
Cardiff
It's not 2026 to 2034, they say they won't start being built till 2028 at least. They can't use them much earlier than 2034 anyway. I also suspect they're deliberately leaving Alston with some manufacturing capacity between now and 2028...

I suspect prices have gone up quite a bit, I suspect that all the choices would be expensive too, you've either got Alstom and Siemens with new platforms that they probably put a premium on. Or Stadler with an existing platform that does just generally cost a bit more. Not sure any Hitachi and CAF but perhaps DfT decided the cheapest doesn't mean the best.
 

CapabilityB

Member
Joined
27 Feb 2022
Messages
64
Location
York
Why are we ordering short trains at small numbers for such huge expensive numbers and a delivery date so far away…

The door arrangement however does not make sense for stopping services. Wide double leaf doors (and 2 per side on all carriages) would make more sense.


Almost certainly under the floor. As a conservative estimate, there will be at least 5 m^3 per carriage (0.5 x 1 x 10m), enough for at least ~10 tonnes of battery per carriage. As per my calculations on this thread https://www.railforums.co.uk/thread...eration-using-class-897-as-an-example.306652/, a 9 car pendolino only needs ~50 tonnes total for London to Glasgow. Unlike diesel engines, batteries can be put basically anywhere in any somewhat reasonable shape, as long as the battery is designed for that specific shape.

The price tag of "almost £1bn" seems quite high. IIRC SWR got the equivalent of 150 5 car Aventras for about £900m, and EMR got 33 5 car trains for ~£400m. Have prices really gone up that much?
You are though basing this off a publicity shot which doesn't show the detail of what's actually been bought.

And even if they are single leaf doors, at 2/3rds of each carriage is better than carriage ends.

There will have been clear metrics that need to be delivered to support journey times and dwell times
 

Diedinium

Member
Joined
31 Oct 2021
Messages
185
Location
Shropshire
To me this train order just confirms that we're never going to get a fully OHLE operated rail network in the UK... there will just forever be the excuse of battery-electric trains to avoid doing things properly in the first place.

We could've instead electrified properly and forever be able to order cheaper, more reliable, lighter and more standardised trains... but alas it seems we'll be stuck with BEMU all over the network that inevitably keep causing issues with failures to switch over between OHLE/Battery plus more general failures from it being a more complex system on board the train.

I wish we could just do what needs to be done instead of penny pinching as always, guess it's just a representation of the modern state of this country.

Anyway, moaning aside - will these trains actually be equipped with pantographs and be able to run from OHLE when it's available? Charging while running if necessary? Or are they going to be more like the GWR class 230 where it uses a bottom contact charging system?
 

positron

Member
Joined
18 Oct 2022
Messages
676
Location
Cardiff
They have a pantograph I would have thought that much would be obvious. They're not gonna spend billions on wires and use pure battery anyway.

Also there was always going to be a period where we had battery trains. We need to get rid of diesel running and this is a step in that direction. Obviously we should continue to electrify and at some point OLE might become cheap enough to where that's done more widespread but I can't see us doing more than Oxford and Bristol and maybe a few islands elsewhere in any immediate future.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
To me this train order just confirms that we're never going to get a fully OHLE operated rail network in the UK... there will just forever be the excuse of battery-electric trains to avoid doing things properly in the first place.

We could've instead electrified properly and forever be able to order cheaper, more reliable, lighter and more standardised trains... but alas it seems we'll be stuck with BEMU all over the network that inevitably keep causing issues with failures to switch over between OHLE/Battery plus more general failures from it being a more complex system on board the train.

I wish we could just do what needs to be done instead of penny pinching as always, guess it's just a representation of the modern state of this country.

Anyway, moaning aside - will these trains actually be equipped with pantographs and be able to run from OHLE when it's available? Charging while running if necessary? Or are they going to be more like the GWR class 230 where it uses a bottom contact charging system?
We were never going to electrify to Scarborough and Saltburn. This was always going to be required if TPE were to continue serving those destinations.

And generally lots of comments about ROSCOs, they still exist because the government does not have much capital currently, certainly not enough to buy all the trains currently needed so ROSCOs will continue to be needed to fund it.
 

sh24

Established Member
Joined
28 Sep 2023
Messages
1,486
Location
London
As noted above ROSCO’s aren’t going anywhere as the UK government desperately needs sources of capital that aren’t gilts.

And yes Covid made things much much more expensive. Steel, power, labour are all massively more expensive.
 

Northerngirl

Member
Joined
16 Aug 2023
Messages
504
Location
Wirral
Unless prices have gone up by 300% in the last couple of years, there's something very strange here. The extra 345s were about 200 mill for a 90 carriages, so 800 for 145 is unbelievable steep, surely the chargers cannot possibly be more than a couple million
 