And so does rail, and heritage operators are not excluded from that legislation. Good luck using it without taking legal action, though.Ferries and coaches have specific legislation covering cancellations and leaving people stranded.
And so does rail, and heritage operators are not excluded from that legislation. Good luck using it without taking legal action, though.Ferries and coaches have specific legislation covering cancellations and leaving people stranded.
Not exactly unusual for an heritage line![]()
And gives you a link to the reverse direction - it's just how their site works I assume![]()
There is one wrong reference, but before that there is clear info about the journey with the change, just as for the morning
Josh Butler
I was under the impression it was 1 continuous trip without beed for changing
A half hour wait in the evening seems extreme
.
Josh Sands
How will it work for passengers travelling from Birmingham to bewdly SVR as the 101 is not mainline certified
Jon Pedley-Glover
Matthew Lee Hancox do we know what route it takes to Birmingham.
Adrian Payne
Does it go to Birmingham or do you change at Kidderminster?
They're not available yet, with less than a week to go. Type in Bewdley and nothing comes up in the from or to boxes.
I've heard that tickets are not available on the train. Unless WMR sort out the ticketing pdq there won't be any paying passengers on the service!!!
I've tried Northern App, WM Trains, nothing. National Rail shows Bewdley (SVR) but won't sell tickets for 1st September. So what's going on?
Heritage Railways do not subscribe to the national networks delay/repay scheme but they can be required by the Consumer Rights Act 2015 to offer full or partial refunds if the service they provide is not reasonably in keeping with that passengers have been led to expect. The argument that they are offering heritage experinces rather than timetabled transport was always tenuous as many benefit from VAT exemption on fares precisely because they are transport operators. Enforcement does not depend wholly on aggrieved passengers taking legal action. Local Authority trading standards departments may well take a dim view of failure to provide refunds in the event of delay or cancellation. Whilst the Act does not prescribe levels there may be expectations that, in the absence of any express levels in the railway's terms and conditions, the delay/repay levels of operators on the national network may set a suitable precedent.And so does rail, and heritage operators are not excluded from that legislation. Good luck using it without taking legal action, though.
I am not expert, but the individual railways own T&Cs will also be a factor surely? I know some have statements that go along the lines of: we operate heritage rolling stock and while we will make every effort to operate with advertised traction, on board facilities and to the published times we reserve the right to change this without notice.Whilst the Act does not prescribe levels there may be expectations that, in the absence of any express levels in the railway's terms and conditions, the delay/repay levels of operators on the national network may set a suitable precedent.
Indeed but the question then is whether such terms and conditions are compliant with the operator’s statutory obligations which must always take precedence.I am not expert, but the individual railways own T&Cs will also be a factor surely? I know some have statements that go along the lines of: we operate heritage rolling stock and while we will make every effort to operate with advertised traction, on board facilities and to the published times we reserve the right to change this without notice.
And in particular the obligation to provide the service with reasonable care and skill, and in accordance with information which influences the consumer's purchasing decision.As per my earlier post the Consumer Rights Act 2015.
Nor do they subscribe to the NRCoT. So they cannot be expected to provide the support to passengers specified in the NRCoT, e.g. if passengers miss the heritage rail service because the TOC connecting service arrived late.Heritage Railways do not subscribe to the national networks delay/repay scheme but they can be required by the Consumer Rights Act 2015 to offer full or partial refunds if the service they provide is not reasonably in keeping with that passengers have been led to expect.
Try getting delay repay from Wightlink or Hovertravel, for example, because their service has missed your train connection. That is the more likely precedent.there may be expectations that, in the absence of any express levels in the railway's terms and conditions, the delay/repay levels of operators on the national network may set a suitable precedent.
Still not on National Rail to purchase, or even see times. It's a special kind of special, when the railway industry sets out to make it fail!![]()
Raileasy are proud to support SVR's commuter trial | TrainSplit
On 1st September, Severn Valley Railway began running a commuter trial between Bewdley and Kidderminster. Raileasy are delighted to now be able to retail tickets for these services.trainsplit.com
(And, therefore, tix should now be available from the forum's ticketing site)
Indeed, it's completely absent from the Rail Delivery Group timetable. I think National Rail will do same-day enquiries (because of Darwin) but not much more beyond that. It's a shame.Still not on National Rail to purchase, or even see times. It's a special kind of special, when the railway industry sets out to make it fail!
Still not on National Rail to purchase, or even see times. It's a special kind of special, when the railway industry sets out to make it fail!
Indeed, it's completely absent from the Rail Delivery Group timetable. I think National Rail will do same-day enquiries (because of Darwin) but not much more beyond that. It's a shame.
Raileasy's workaround is very much a stop-gap, and my hope is it'll be distributed properly by the industry soon in the data feeds it should've been in from the start.
Darwin is the realtime train information system procured by Rail Delivery Group and used for the whole National Rail network, including all journey planners, station screens, etc.Bold?
"Allows" is a strong word given what happens if you tap on the "1h 21m, 2 changes" link on an itinerary on National Rail Enquiries to try and view what it's proposing.....NRE allows you to plan a journey in the next 24-48h with them
To be fair, I've seen no indications that WMT want anything other than this to get sorted out as soon as possible.Surely West Midlands Railway and West Midlands Rail Executive would be kicking up a fuss about this?
This is embarrassing. Such a simple thing, and they messed it up. Only a few more weeks before the experiment is deemed unsuccessful. Partly down to NRE."Allows" is a strong word given what happens if you tap on the "1h 21m, 2 changes" link on an itinerary on National Rail Enquiries to try and view what it's proposing.....
So if it's not NR's fault, and it's not NRE's fault, and it's not RDG's fault, and it's not WMT's fault, whose fault is it?Darwin is the realtime train information system procured by Rail Delivery Group and used for the whole National Rail network, including all journey planners, station screens, etc.
It consumes both the Network Rail timetable information as well as the filtered down timetable which retail sites use and merges them together. As a result, it sees these heritage services from the Network Rail timetable and NRE allows you to plan a journey in the next 24-48h with them, but nothing further.
It was RDG's fault because they control the process which filters the timetable down, and this is what is removing the heritage services from the timetable given to retailers.So if it's not NR's fault, and it's not NRE's fault, and it's not RDG's fault, and it's not WMT's fault, whose fault is it?
Back in BR days, someone would be closing the lines instead of running a commuter service on them!Back in BR days, someone's arse would have been getting a kicking for this kind of fiasco, and it would have got sorted pdq.
So who is responsible for RDG? Who are they accountable to?It was RDG's fault because they control the process which filters the timetable down, and this is what is removing the heritage services from the timetable given to retailers.
Back in BR days, if one of the regional or sector managers was pushing a particular initiative, they wouldn't stand for this kind of fiasco. The relevant people would have been told in no uncertain terms to get it done.Back in BR days, someone would be closing the lines instead of running a commuter service on them!
Which really shouldn't be necessary, RDG's side should be able to re-evaluate services on demand (even after it's processed them once already), but here we are. This is not the only problem with the timetable process.The next test is relying on the timetables for these trains being "republished" to see if they still get filtered out from the retail system timetable after some changes were made, but this is running into some issues somewhere between WMT/Network Rail at the moment.
I would not say this, for the reasons @MrJeeves outlines. The services exist until RDG process the timetable data and then they disappear.it's not RDG's fault
The DfT.So who is responsible for RDG? Who are they accountable to?
Contrary to popular belief on the forum (including from some posters who work at RDG!), as much as they are owned by the train operators, they still are responsible day-to-day for many of the industry systems that retailers and operators have to use, and actively make decisions on the architecture, input and maintenance of information in those systems - as well as the specifications around how to use them.I thought they were set up to represent the TOCs. Have they now become an authority unto themselves, with the power to stymie a TOC's aspirations?
So the TOCs own and pay for RDG, but have no control over it?!!Which really shouldn't be necessary, RDG's side should be able to re-evaluate services on demand (even after it's processed them once already), but here we are. This is not the only problem with the timetable process.
I would not say this, for the reasons @MrJeeves outlines. The services exist until RDG process the timetable data and then they disappear.
The staff at RDG who have tried to assist with this have done their best, and I have no criticism of them personally.
It is really an organisational failure to a) maintain the software powering these systems properly and b) ensure that staff have the resources and understanding they need to effectively troubleshoot and fix problems that we have ended up with this not working at all.
The DfT.
Contrary to popular belief on the forum (including from some posters who work at RDG!), as much as they are owned by the train operators, they still are responsible day-to-day for many of the industry systems that retailers and operators have to use, and actively make decisions on the architecture, input and maintenance of information in those systems - as well as the specifications around how to use them.
I wouldn't go quite that far, but remember none of the TOCs have significant in-house technical resource that e.g. work actively on a ticket issuing system.So the TOCs own and pay for RDG, but have no control over it?!!
The theory - and to be clear it's only a theory, but I don't think we have a better one - is that other links work because they involve travel to/from at least one "National Rail" station (for example, Ryde Pier Head, Portsmouth Harbour are both considered National Rail stations). Services that do not call at any locations deemed "National Rail" locations appear to be automatically dropped when the timetable is compiled by RDG. "Bewdley SVR" and "Kidderminster SVR" are both (or at least, were both at the time the schedules were created) not considered mainline railway stations.The software as it stands can cope with timetables and through fares for the Isle of Wight ferry and hovercraft links, for example, so why not in this case?
So surely the answer is to classify the two SVR stations as "mainline stations" in the same way? If there is a solution that works, the obvious thing to do is copy it.I wouldn't go quite that far, but remember none of the TOCs have significant in-house technical resource that e.g. work actively on a ticket issuing system.
They'll have an understanding of the systems from a fares management perspective. They're not going to be the ones advocating loudly for validation or architectural/schema improvements that directly relate with actually planning journeys and retailing. They might report bugs with the parts of the system they touch, ask for changes that improve their day to day work of managing the fares, E-Ticketability for their own products etc. But the overall task of keeping the lights on, maintaining technical documentation and coordinating with suppliers is RDG's.
The theory - and to be clear it's only a theory, but I don't think we have a better one - is that other links work because they involve travel to/from at least one "National Rail" station (for example, Ryde Pier Head, Portsmouth Harbour are both considered National Rail stations). Services that do not call at any locations deemed "National Rail" locations appear to be automatically dropped when the timetable is compiled by RDG. "Bewdley SVR" and "Kidderminster SVR" are both (or at least, were both at the time the schedules were created) not considered mainline railway stations.
So, because they don't have the expertise to do the work, the TOCs have outsourced the job to RDG, who also don't have the expertise, and don't even know how their own software works! What a fiasco.This is why the detail of exactly how the software works matters, because the impression I got was that there was not a good understanding of where the location types are derived from, the interaction with the location definitions in Network Rail's CIF and how they can be changed, or indeed if this was what was going on at all (i.e. are there diagnostic logs from the timetable processing job to explain what it has done and why?).
All of these things are inherently quite technical and relate directly to how the software systems were designed to work and are working day-to-day.
Well quite - and that's exactly what I suggested they do to fix it, but things are rarely quite that straightforwardSo surely the answer is to classify the two SVR stations as "mainline stations" in the same way? If there is a solution that works, the obvious thing to do is copy it.
Darwin is the realtime train information system procured by Rail Delivery Group and used for the whole National Rail network, including all journey planners, station screens, etc.
It consumes both the Network Rail timetable information as well as the filtered down timetable which retail sites use and merges them together. As a result, it sees these heritage services from the Network Rail timetable and NRE allows you to plan a journey in the next 24-48h with them, but nothing further.
Further testing, I can get the WMR website to offer me tickets for stations from Bewdley to as far as Jewellery Quarter or Droitwich, but if I try Birmingham or Worcester it fails.
So I've just tried buying a ticket for Bewdley to Stourbridge Junction on 15th September on the West Midlands Railway website. I can actually select the services and have got up to the payment screen. E-tickets aren't an option, with it either being collect from a ticket machine or via the post.
Raileasy/TrainSplit do not require registration before purchase.I then tried changing the retailer to a couple of others and while each one seemed to recognise Bewdley and Birmingham they wanted me to sign up/register with them before I presume/hope they would sell me a ticket
For now: Just .. don't buy the tickets from West Midlands Railway if this is important. Other retailers offer E-Tickets.So you cant use the option that the vast majority of people will choose particularly younger passengers![]()