DB were route learning for this last week - there are also schedules in for next week between Toton and Handsworth EMR. I’d assume this is the FOCs trying to get back into the scrap market before the Port Talbot electric arc furnace comes online - that will require huge quantities of scrap. Good news for railfreight though
That schedule is bullet proof with 3 hours at Arpley to soak up any delays at Liverpool Docks as it can sometimes get trapped in by Biomass services. Good on DB
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

j37401

Member
Joined
16 Feb 2017
Messages
103
That schedule is bullet proof with 3 hours at Arpley to soak up any delays at Liverpool Docks as it can sometimes get trapped in by Biomass services. Good on DB

Not any more. The track layout has been altered slightly at the biomass terminal meaning a train can shunt in & out or EMR and a biomass train can load at the same time.
 

matt99001

Member
Joined
19 May 2026
Messages
30
Location
bristol
Any more newly introduced freight schedules that are up and coming? I've heard Freightliner are looking at Okehampton Quarry for October(ish) and scrap metal movements to TATA Steel in Wales.
 

class 9

Member
Joined
18 Nov 2010
Messages
1,078
Any more newly introduced freight schedules that are up and coming? I've heard Freightliner are looking at Okehampton Quarry for October(ish) and scrap metal movements to TATA Steel in Wales.
Freightliner are Intermodal only now.
 

matt99001

Member
Joined
19 May 2026
Messages
30
Location
bristol
Ok, I might have read it a while ago when it was still under Freightliner.

I heard NR have declined a GWR request for running a very early/late train from Okehampton Station for this reason.

== Doublepost prevention - post automatically merged: ==

Does anyone know what happened to 6M53 (China Clay Cornwall to Stoke)? looks like it started on a schedule, then a VSTP one was created and a new path formed. Then it stopped at Bristol Parkway.

Guessing it didn't make its way to Cliffe Vale?
 
Last edited:

Tobytrain10

Member
Joined
2 Feb 2026
Messages
370
Location
Lincoln
I created a thread about it, then discovered this thread again that i forgot about, there is another oil path being reinstated from Humber to Kingsbury from next week, 6M57
 

172007

Member
Joined
2 Jan 2021
Messages
1,156
Location
West Mids
Query, the current DB route learner this week, Toton to EMR Handsworth (Birmingham) has me puzzled.

I assume its to restart the scrap metal trains out of there / Queens Head sdgs opposite to the new eletric arc furnace in Port Talbot. The part that puzzles me is why Margam Drivers who already sign the route to Round Oak steel terminal (Past Stourbridge) appear to be not learning through to Handsworth / Tyeseley.
Just seems stange that East Midlands drivers are route learning.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,348
Query, the current DB route learner this week, Toton to EMR Handsworth (Birmingham) has me puzzled.

I assume its to restart the scrap metal trains out of there / Queens Head sdgs opposite to the new eletric arc furnace in Port Talbot. The part that puzzles me is why Margam Drivers who already sign the route to Round Oak steel terminal (Past Stourbridge) appear to be not learning through to Handsworth / Tyeseley.
Just seems stange that East Midlands drivers are route learning.
Maybe they are being bussed in to Toton, rather than bringing a light engine all the way from S Wales for no benefit?
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,462
Query, the current DB route learner this week, Toton to EMR Handsworth (Birmingham) has me puzzled.

I assume its to restart the scrap metal trains out of there / Queens Head sdgs opposite to the new eletric arc furnace in Port Talbot.

As far as I am aware, the Port Talbot furnace won't be operational until 2028,
so until then any workings from Handsworth will presumably run to Liverpool.
 

geordieblue

Member
Joined
11 Jan 2020
Messages
787
Location
Leeds
As far as I am aware, the Port Talbot furnace won't be operational until 2028,
so until then any workings from Handsworth will presumably run to Liverpool.
Also worth saying that the Port Talbot scrap is planned to go in containers, for ease of unloading, so presumably the loading points may change/new loading points be developed before the EAF comes online
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,908
Also worth saying that the Port Talbot scrap is planned to go in containers, for ease of unloading, so presumably the loading points may change/new loading points be developed before the EAF comes online
If it is planned to use containers, every loading point need not be rail connected. More intensive use of any container terminals not currently working to capacity could be on the cards.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
776
Location
Doncaster
Also worth saying that the Port Talbot scrap is planned to go in containers, for ease of unloading, so presumably the loading points may change/new loading points be developed before the EAF comes online

If it is planned to use containers, every loading point need not be rail connected. More intensive use of any container terminals not currently working to capacity could be on the cards.

The type of containers proposed for use at Port Talbot are specialised bulk containers, so I'd be surprised if they run to regular container terminals where all of the traffic would have to come in and out by road. See this post - https://www.railforums.co.uk/threads/the-new-era-of-steelmaking-in-port-talbot.285614/post-7271297

Containers that are or were used for bulk products are often loaded without being removed from the train (e.g. ash and gypsum at Drax, lime at Hardendale). I'm not sure if this will also be done with scrap metal to Port Talbot - a couple of issues would be the possibility for bits of scrap to end up on the intermodal wagons during loading, and the rougher handling that occurs during scrap loading which could potentially damage things like twistlocks. It's possible that scrap terminals loading these containers might work more like refuse transfer stations (where the containers are removed from the train for loading on site) but this would require more room for manoeuvre than is available at a typical scrapyard.

If the loading points require container handling equipment, it's possible that there might be locations which act as regional hubs which load scrap on site, but also receive traffic by lorry in containers from other scrapyards for loading to the train, as suggested above. Treating an open-top container on an intermodal wagon the same as if it was a box wagon, with no change to loading methods or terminals, would require less equipment and no change to terminal operations. But on the other hand, swapping empty containers for loaded ones could reduce the time a train spends in the terminal and make the operation more efficient - loading a scrap train can take several hours. It also depends on whether the current scrap loading points would have the capacity to feed Port Talbot with sufficient volumes in their current configuration. It will be interesting to see what changes come about...
 

Amlag

Member
Joined
8 Jul 2018
Messages
312
An update on the progress at Port Talbot in installing the EAF etc, incl construction of the facilities to transport the scrap from the RAIL delivery (sidings) yard, states that 70,000 tons of scrap steel will be required each week, most will come by RAIL, that I suspect equates to about 7-10 loaded trains a day from several loading points, hopefully including somewhere in the Devon & Cornwall rail freight ‘desert’.
 

BRX

Established Member
Joined
20 Oct 2008
Messages
4,515
Containers that are or were used for bulk products are often loaded without being removed from the train (e.g. ash and gypsum at Drax, lime at Hardendale). I'm not sure if this will also be done with scrap metal to Port Talbot -
In the video in the other thread you link to, they appear to talk specifically about a wagon type where the container is lifted up and the contents tipped out - it seems they are procuring them specifically.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
776
Location
Doncaster
In the video in the other thread you link to, they appear to talk specifically about a wagon type where the container is lifted up and the contents tipped out - it seems they are procuring them specifically.
For offloading at Port Talbot they will definitely be removed from the train, like the lime containers were. From what I remember of the video, the idea is that the whole container (or rotainer as they call it) can be rotated upside down, by the reach stacker or similar equipment, to empty it in one go instead of using a magnet or grab. My question is what happens when the scrap is loaded - the ash, lime and gypsum flows using containers are or were all loaded with the container still on the wagon, but lifted off the wagon for discharge at the other end.
 

172007

Member
Joined
2 Jan 2021
Messages
1,156
Location
West Mids
For offloading at Port Talbot they will definitely be removed from the train, like the lime containers were. From what I remember of the video, the idea is that the whole container (or rotainer as they call it) can be rotated upside down, by the reach stacker or similar equipment, to empty it in one go instead of using a magnet or grab. My question is what happens when the scrap is loaded - the ash, lime and gypsum flows using containers are or were all loaded with the container still on the wagon, but lifted off the wagon for discharge at the other end.
Queens head sidings in handsworth does have a concrete pad that would probably be compatable with placing scrap in containers, storing and using a reach stacker/lifter to load then onto trains. I am not sure other scrap yards will have the room or a suatable surface to do this easily looking at a few on google. It will costs a few bob too to handle containers as i guess none have reach lifters and also the room to stack containers.

I am guessing over time it may end up with loose scrap going to Port Talbot and then transfered to a container due to costs and convenience. Like many things, looks good on paper but......
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,532
Location
Northampton
Queens head sidings in handsworth does have a concrete pad that would probably be compatable with placing scrap in containers, storing and using a reach stacker/lifter to load then onto trains. I am not sure other scrap yards will have the room or a suatable surface to do this easily. It will costs a few bob too to handle containers.

I am guessing over time it may end up with loose scrap going to Port Talbot and then transfered to a container due to costs and convenience. Like many things, looks good on paper but......
Weren't containers being talked about for use in the Severn Tunnel to stop the risk of scrap metal causing sparks or damage to the OLE? Less relevant for trains from the Birmingham direction (which is probably most of them) but it may be that at least some scrap ends up conveyed by container from e.g. London to facilitate transit of the Severn Tunnel.
 

BRX

Established Member
Joined
20 Oct 2008
Messages
4,515
On the subject of steel (not scrap though) does anyone know if anything is actually happening with Peel Ports' supposed expansion of rail connected facilities as announced about a year ago?


The UK’s second largest port operator is progressing with £32m to add a further 140,000 sq ft of storage at its Port of Liverpool steel and metals terminals. Overall across the Ports of Liverpool and London Medway, warehousing will be increased by 50 percent from the current 1 million sq ft to create an additional 500,000 sq ft of capacity.


Further plans include creating a second automated terminal in Liverpool dedicated to steel coils, as well as a new automated terminal for the Port of London Medway in Sheerness.


These will be developed to include rail connectivity by a new inland rail terminal in the Midlands.

Of interest here was the possibility of rail freight returning to Sheerness/Medway.
 

172007

Member
Joined
2 Jan 2021
Messages
1,156
Location
West Mids
Weren't containers being talked about for use in the Severn Tunnel to stop the risk of scrap metal causing sparks or damage to the OLE? Less relevant for trains from the Birmingham direction (which is probably most of them) but it may be that at least some scrap ends up conveyed by container from e.g. London to facilitate transit of the Severn Tunnel.
Pass, never heard. That said, the way scrap is loaded there is always a chance some moves and a piece springs up. I have wached the magnetic claws when loading being used to tamp the load down. Always wondered why they never squashed the metal into cubes like they do cars tbh. May be it is graded the other end.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,389
Location
The Fens
Stone traffic to Sizewell from October/November.
Sizewell has already started see here:


The first train conveying materials to be used for the construction of a new nuclear power station has arrived at the site.

Sizewell C is being built on the Suffolk coast and is expected to cost £38bn.

The train arrived at 01:30 BST on Tuesday, and bosses at the project said it brought the equivalent of 50 HGVs' worth of construction material.
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,462
Running for three days this week already, according to RTT.
One week only for now - more trains should run in October.


There is quite a bit if detail on deliveries by rail on the Sizewell C 'works tracker' website:

 