• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Lewes derailment - Thursday 13th August

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dannyboy104

New Member
Joined
6 Jul 2013
Messages
2
went through Coulsdon south with another engine on the rear
 

Attachments

  • IMG_6562.jpeg
    IMG_6562.jpeg
    3.3 MB · Views: 268
  • IMG_6563.jpeg
    IMG_6563.jpeg
    39.6 KB · Views: 267

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,978
Location
Surrey
Network Rail Suusex have a new Twitter video up. They are planning on finishing earthworks Thursday than have 500m of track to replace and railways systems to reinstate.

Also in the video is a view of coach 7 being lifted which shows remarkable little damage on the side that was against the embankment.

1787694683657.png
 

williamn

Established Member
Joined
22 May 2008
Messages
1,652
Is there any chance the line will be opening earlier than had been expected? I note that journey planners are showing trains running normally on Saturday.
 

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,489
Location
London
Is there any chance the line will be opening earlier than had been expected? I note that journey planners are showing trains running normally on Saturday.
The Southern journey planner was saying that beyond a few days ahead, the timetabling might not be correct - so until an announcement about reopening I wouldn't necessarily trust the planner
 

BRX

Established Member
Joined
20 Oct 2008
Messages
4,477
The freight that has been stuck down at Newhaven Marine is being recovered tonight, running via Polegate and Hastings. Bet it is a while since a non p-way freight has been along there.

Light engine move is in daylight too


Why does it need an engine to rescue it - is it because it's not possible to run around in Lewes?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,398
Location
Northampton
Why does it need an engine to rescue it - is it because it's not possible to run around in Lewes?
The freight is almost certainly too long to run round in P4/5 at Lewes (it's only 6 or 7 cars long), and Platform 1 at Eastbourne (12 cars). It's also presumably too long to fit behind the signal at Brighton (platforms are 12car), hence running via Hastings (so reversing at Hampden Park).
 

trainmania100

Established Member
Joined
8 Nov 2015
Messages
3,031
Location
Newhaven
The freight that has been stuck down at Newhaven Marine is being recovered tonight, running via Polegate and Hastings. Bet it is a while since a non p-way freight has been along there.

Light engine move is in daylight too



Not booked but I captured this a while back.
Same principal except this only had 1 66. It ran around at Hampden park, left it's wagons there, down to Eastbourne, back up over the crossover .


And for info, there's a gbrf booked tomorrow morning as well to day aggs.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,978
Location
Surrey
Further update from NR Sussex and embankment nearly complete with even the replacement troughing route in place. Over to track renewals tomorrow to reinstate the track and railway systems. Can't see them opening earlier but with the rate of progress being made but I still believe they could.

HQpstGBWcAABChZ
HQptNAJWYAAyCLL
HQpuWQ0WgAAeQxO
 

BRX

Established Member
Joined
20 Oct 2008
Messages
4,477
The freight that has been stuck down at Newhaven Marine is being recovered tonight, running via Polegate and Hastings. Bet it is a while since a non p-way freight has been along there.

Light engine move is in daylight too


According to reports on se-gen, it only got as far as Southease before failing - and has had to be dragged back to Newhaven Marine.
 

Top