Let’s not turn this into yet another For / Against CDL debating thread please. There’s been enough of them and I think after all this time, most of us just want to see the Jacobite running in some form again without hearing the CDL debate.
I don't see how a CDL requirement is "idiotic", especially when...I have every sympathy with anyone trying to get away with not complying with idiotic rules.....
This is false - there is no (generally) interlock between CDL systems and a locomotive on hauled stock of the type West Coast use. There is nothing to stop a train from moving with a door open, and this is safeguarded by other processes and procedures.c) A WCR charter left York with a door wide-open, which wouldn't have happened with CDL
You'd suspect that the BIL that would be left illuminated, would be a bigger hint to the guard and dispatchers that something wasn't quite right.This is false - there is no (generally) interlock between CDL systems and a locomotive on hauled stock of the type West Coast use. There is nothing to stop a train from moving with a door open, and this is safeguarded by other processes and procedures.
The CDL light does not work in that way on BR CDL fitted stock. It goes out regardless once the guard has operated the door close button if the system is working. If it stays lit it's because the system has failed to operate usually because of flat batteries. If the door is not correctly shut but the system is working then the light will still go out.You'd suspect that the BIL that would be left illuminated, would be a bigger hint to the guard and dispatchers that something wasn't quite right.
It's pretty easy to miss a door handle being not quite right. A bit more difficult to miss a door being wide open, but I suppose it could happen. To miss an illuminated bright orange BIL, though? Practically impossible.
This is why I'm hoping that WCR sorts out the Mk1s. My family aren't into trains in the slightest, but are Potterheads. A ride in a Mk1 compo just like in Harry Potter and the Philosopher's Stone might be the only railtour I'll ever get to convince them to go on with me!

Possibly if this is the 1st C.D.L. coach with orange indicator lights is it out on light test minus passengers as back at 10A W.C.R.C. depot at Carnforth W.C.R. fitters could be fitting more C.D.L. to more M.K.1 T.S.O. carriages just a thought I'm only speculating also when I've wrote that.We travelled on the Jacobite last week, diesel hauled by 37685 due to the steam ban. We noticed that, as mentioned earlier, Mk1 99318 has been CDL fitted. However this coach was completely empty there and back with its doors labelled out of use, despite having visible CDL locks and hazard lights. Curious to know why this is? It seems strange to have a whole empty coach on such a lucrative train, which is showing as sold out on virtually every trip. Running an empty coach will be thousands of pounds in missed revenue each day for WCR as the demand is clearly there.
I love that even Railway herald are throwing shade at WCR here:It is being reported that the ORR have reached a decision on WCR's application to run their Mk.1 stock without CDL in the interim whilst they retrofit their fleet with the system. It would seem (from the radio silence from WCR) that this decision has not fallen in their favour - thus it could be speculated that the ORR have demanded that CDL be fitted before any vehicles enter service, and no leeway is being given in the meantime.
web
railwayherald.com
At the end of the day - why on earth would anyone trust WCR with any kind of exemption? They should consider themselves fortunate they're even allowed on the mainline at allIt should be noted however that the exemption applied for does not stop any operator from actually fitting Central Door Locking to its stock, which is a process that WCR could have undertaken at anytime in the past two-and-a-half years since its previous exemption was revoked by the ORR.
Quite possibly, it depends how much they choose to do over the winter monthsIs there any expectation that they'll have the issues sorted for next year? I'm intending to book a compartment for a large trip when they get the Mk1s back in service.
The ORR for one does since WCRC have a Regulation 4 Exemption for running MKI's on the mainline, "https://www.orr.gov.uk/sites/defaul...lway-safety-regulations-1999-regulation-4.pdf". As do every other operator of "MKI's".At the end of the day - why on earth would anyone trust WCR with any kind of exemption?
Is there any expectation that they'll have the issues sorted for next year? I'm intending to book a compartment for a large trip when they get the Mk1s back
I fThe ORR for one does since WCRC have a Regulation 4 Exemption for running MKI's on the mainline, "https://www.orr.gov.uk/sites/defaul...lway-safety-regulations-1999-regulation-4.pdf". As do every other operator of "MKI's".
I’ve often wondered over the last couple of years throughout this whole debacle whether it’s not the CDL that’s the issue, it’s the spending money on mk1s. Especially when he has way more than anyone else, but is their future on the mainline guarenteed?The ORR for one does since WCRC have a Regulation 4 Exemption for running MKI's on the mainline, "https://www.orr.gov.uk/sites/defaul...lway-safety-regulations-1999-regulation-4.pdf". As do every other operator of "MKI's".
Going off topic but Reg 4 requires improved crash pillars and buck eye lower shelf brackets to avoid the danger of over riding at higher speeds so doesn't have any relevance to operation at lower speeds (heritage railways)A Reg 4 exemption is also a completely different kettle of fish to a Reg 5 exemption, with different standards, benchmarks and other things to follow.
Ultimately if you don't trust WCRC's Reg 4 exemption you probably shouldn't travel on any heritage railway ever again.
As per the ORR certificate; "have crash pillars of an equivalent or greater strength than the original British Rail design;" so there's no requirement for improvement on the original build. Mainline MkI's can remain the same matchwood design as when built.Going off topic but Reg 4 requires improved crash pillars and buck eye lower shelf brackets to avoid the danger of over riding at higher speeds so doesn't have any relevance to operation at lower speeds (heritage railways)
It shouldn't be a great problem running at a maximum speed of 25 mph between Fort William and Mallaig. Although the permitted line speed for loco-hauled trains is 40 mph to a point shortly before Glenfinnan viaduct - and then 30 mph thence to Mallaig - the schedules include waiting time at Glenfinnan and Arisaig, which should be able to absorb any slack in the schedule caused by a lower permitted line speed.There is one way round it, as CDL isnt required above 25 mph, ORR should just say, ok yes, you can run without CDL, but no faster than 25 mph, and of course, just try getting paths at 25 mph, it's going to be nay on impossible, and the moment a West coast service breaks that speed limit, which it will, you pull their operating licence,
I was thinking network wide, that it itself would render any argument against fitting CDL mute. but as you point out, it would solve a problem over using traditional MK1's on that route, the pathing to get them there though, would be interesting.It shouldn't be a great problem running at a maximum speed of 25 mph between Fort William and Mallaig. Although the permitted line speed for loco-hauled trains is 40 mph to a point shortly before Glenfinnan viaduct - and then 30 mph thence to Mallaig - the schedules include waiting time at Glenfinnan and Arisaig, which should be able to absorb any slack in the schedule caused by a lower permitted line speed.
It shouldn't be a great problem running at a maximum speed of 25 mph between Fort William and Mallaig.
the pathing to get them there though, would be interesting.
With replanning I would expect this to be possible without impacting ScotRail: might need to leave earlier to ensure passing at Glenfinnan.It shouldn't be a great problem running at a maximum speed of 25 mph between Fort William and Mallaig. Although the permitted line speed for loco-hauled trains is 40 mph to a point shortly before Glenfinnan viaduct - and then 30 mph thence to Mallaig - the schedules include waiting time at Glenfinnan and Arisaig, which should be able to absorb any slack in the schedule caused by a lower permitted line speed.
Regulation 5 exemption applies to Grosmont to Whitby not Pickering.The relevent regulations apply to railways operating above 25mph rather than trains, the logic being around the risks of interaction between trains at higher speeds, hence why NYMR still require a regulation 5 exemption. This has been granted strictly limited to 25mph and to between Grosmont and Pickering, which is a single track section without passing places and therefore no interaction with other trains is possible.
Whitby is indeed what I intended to type...Regulation 5 exemption applies to Grosmont to Whitby not Pickering.