This is something Thameslink often do when there is major disruption to their services. They remove the cancelled services from the departure boards, to only show services that are confirmed as running. Granted they do also explain this with an additional message on the departure boards.
Paying for a second office location forever vs a once-in-thirty-year shut-down event ...
Monzo isn't the only one. The bank used by the charity of which i am the treasurer has had several outages over the summer (including right now) and is currently only fully available online during normal banking hours (which is a real pain if you are a volunteer with an unrelated day job). This follows a badly botched relaunch of their website last year.That wouldn't work for me at all during the approximately four hours it was up for while I was trying to do something with it. Typically the failure was when I did want to use my account to make a payment.
This is more acute with Monzo because they don't provide any in-person or telephone services. Also from some journalists and tweets a number of other users were also unable to make any payments. I was able to view stale balances but not receive or make payments. I'm considering complaining actually, as it could have been very bad. Luckily I avoided economic losses.
I think it's because it's self contained today due to engineering works, so the stock and staff arrangements would be very easy to manage, as opposed to the rest of the (very complex) networkSo does anyone actually know what happened, also how come Peterborough to Stansted continued to operate (short of declaring UDI or defecting to Greater Anglia)_
Not everyone has the benefit of VFH and many places still insist on Office working with deskbound PC's, and for many companies resiliance/duplication is a dream.
As for resiliance what do you do when the cloud takes a nap, of Microsoft Teams (if you use it) takes a lie down (taking out phones as well)? Many companies reply on these so much now (along with AI but lets steer clear of that rabbit hole) and when they fail everything stops. At my last job before retiring the mantra was Cloud! Cloud! Cloud! (before coming AI! AI!), no desk phones (all Teams), even email in the cloud,
I do wonder what they do when it all falls over or a JCB takes out the lines to a manufacturing plant (you can't take an assembly line home with you)
Sometimes with the way everythings is getting interconnected I wonder that we have so few outages
From what I have read it was a power outage = no computers running. For all we know their IT room could have been a small room off to one side with a small UPS for power blips and and air-conditioner (we don't actually know).As others have said XC have used the same building for decades so it is not necessarily “negligence” or “heads such roll” for using such a shared facility, especially when it would have been some time since such a decision was made.
The more awkward questions will be why they couldn’t then operate practically at all without access. If the company suffered some sort of critical IT failure, then the physical location may not have mattered if people couldn’t access details even their cloud or VPN site. Also many telephony systems can’t be transferred to just run from a mobile as they are bespoke. But the fact remains that if this was a physical issue (let’s say Cannon House had a gas leak outside with no access), would the outcome have been any different?
I would suggest that the Government are rather unlikely to admit it if a rogue nation had managed to halt the railway! It will forever remain a ‘power cut’!I trust the Government will now initiate a full inquiry into this XC Fiasco including any involvement by ‘outside of the UK organisations etc.’
This.Consequences for whom?
XC to DfT - we need to spend £1m on improved Business Continuity Plan/infrastructure. Dft to XC - Er, no. .....
From what I have read it was a power outage = no computers running. For all we know their IT room could have been a small room off to one side with a small UPS for power blips and and air-conditioner (we don't actually know).
I think you must be living in the Green and Sunny Uplands, DR/BC can cost serious money and not every company can afford it, there are thousands of companies out there, some medium/small that may not even have an IT department.Those businesses are therefore somewhere between incompetent and grossly negligent. Their shareholders would have a good case against them for the loss of value or dividend the resulting outages would cause.
A lot of the software isn't supplied in a cloud-based format. Of course anything is possible but every operator has a slightly different combination of control software and interfaces. To achieve what you're suggesting I'd suggest a large in-house development project would probably be needed as there'd be no single external supplier (Magellan, Siemens, IVU Traffic Technologies, whoever) willing to take on such a risky migration. Tens of millions to build the system from scratch essentially.If that was their sole IT facility then it is not fit for purpose. If you're running operationally critical stuff onsite for a large business you really need at least two independent facilities.
If you're using cloud facilities your cloud provider has that (many times over).
Only if you configure and pay for it, you will be surprised to know that this is not automatically the case (ask the customers of OVHcloud and it's SBG2 data centre in Strasbourg)If you're using cloud facilities your cloud provider has that (many times over).
I think you must be living in the Green and Sunny Uplands, DR/BC can cost serious money and not every company can afford it, there are thousands of companies out there, some medium/small that may not even have an IT department.
I assume your company has a DR/BC plan for a comet strike vapourising central London ?
Yes it is a deliberatly absurd suggestion
but it is a valid senario to consider, in this case the odds would be astronomical (sorry for the pun), this costs of implimenting it literally out of this world (DC on the moon?) and your customers would probably be vapourised as well anyway.
The point I am trying to make (repeatably) is that every senario has a cost/benefit ratio, and here we have a single event in 31 years for XC (the recent ROC's are another story), so someone decided it was not worth it. There is no point implimenting something if it bankrupts the company
According to a reply by Xcountry on Facebook just before today's shambles, they are experiencing significant delays in processing delay repay claims. So even getting a refund could take weeks. At what point does the government take the contract back? Trains are still regularly cancelled because of a lack of drivers.
That is pathetic, but nothing about the abysmal information system on our railways today surprises me anymore.
All sorts of large businesses have had embarrassing major outages. Remember when Facebook locked themselves out of their datacentre?A business critical single point of failure like this is incompetent. Whataboutery does not change that.
In the last few years, numerous IT and telephone line failures.How many other significant issues has it caused that have been detrimental to train operation since XC first started using Cannon House 20 years ago?
I am booked to travel from Leicester to Newport on Monday on two Cross Country services.
There are quite a few other Glamorgan cricket fans returning from here to South Wales tomorrow
Hope the trains are running tomorrow morning.
NoWas BR just as brittle but it's just with poorer communications things like this happened without people generally being aware?
== Doublepost prevention - post automatically merged: ==
A single point of failure? Or a concatonation? We are still without any information at all on immediate or underlying causes but have no end of eye-wateringly expensive ‘solutions’ on offer such as duplicate locations.A business critical single point of failure like this is incompetent.
Everything here about causes is currently whataboutery.Whataboutery does not change that.
And what was out there for everyone to see had generally been subject to some rigour and journalistic professionalism rather than every man and his dog throwing muck at Twitter.No
In many ways communication pre internet was more effective as newspapers and television reached a high percentage of the population.

Thanks..it was a good game though.The currently timetabled services (subject to planned engineering work) between Leicester and Birmingham ran in full from 18.00 until the end of services on Sunday evening, there's a full complement of XC 170s on Leicester depot tonight so the omens for trains to Birmingham on Monday are good; I wouldn't like to comment on the prospect of services from New Street to Newport though.
Commiserations on losing at Grace Road, although it was a great result for us Foxes, consecutive victories in Division One of the County Championship? I can't remember the last time!
Wishing you all a safe trip back home tomorrow.
In many ways communication pre internet was more effective as newspapers and television reached a high percentage of the population.
Pretty certain that thousands of people stranded because of no trains would have been reported!Perhaps but the threshold for something being worth reporting is somewhat higher than for someone posting in a web forum.
In the last few years, numerous IT and telephone line failures.
Will there be any consequences for XC for being unable to run a service because of poor business decisions?
Consequences for whom?
XC to DfT - we need to spend £1m on improved Business Continuity Plan/infrastructure. Dft to XC - Er, no. .....