• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

ScotRail - New app / website booking engine from 30 July 2026

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,373
Location
Calder Valley
Tried to add my app booking to my Google Wallet....
 

Attachments

  • Screenshot_20260818_210116_Google Play services.jpg
    Screenshot_20260818_210116_Google Play services.jpg
    178.6 KB · Views: 100
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

kkong

Member
Joined
8 Sep 2008
Messages
1,126
ScotRail have belatedly published the official notice of the contract award to SilverRail.

The total price (including the supply of new TVMs) is £83.7 million.

Interesting to note that the Quality weighting in the procurement was 70% which raises even more questions about the shambolic first publicly visible output of this contract.

Although the contract award date of 29 May 2026 may explain that...

This notices raises two immediate questions from me:
  1. Why did it take over two years from the start of procurement (21 May 2024) to finalize this contract. ScotRail must have known that their contract with Trainline was expiring on 31 July 2026 and would not be renewed; yet a new supplier was not contracted until just two months before the deadline.
  2. Why was only 1 (one) tender received?

Section V.2.5) seems to confirm that the app development was not outsourced (or, if it was, they didn't tell ScotRail about this).

I can only wonder what awaits us if the (outstourced) contract Options are exercised.

II.1.4) Short description
ScotRail have awarded a contract for a Retail Systems partner to provide a Website, App and Ticket Vending Machines powered by a single centralised Ticket Issuing System as well as a new Ticket Issuing System for On-train Mobile Ticket Sales and Ticket Office Ticket Sales. The contract includes the implementation and on-going support of the website and app, the manufacture and roll-out of new Ticket Vending Machines and the on-going support and maintenance, and the roll-out of new on-train ticket issuing equipment & ticket office equipment and the on-going support and maintenance.

II.2.5) Award criteria
Quality criterion: Technical & Quality / Weighting: 70
Price / Weighting: 30

II.2.11) Information about options
Options: Yes
Description of options:
FUTURE OPTION: On-Train Mobile TIS (Ticket Issuing System)
FUTURE OPTION: Ticket Office TIS (Ticket Issuing System)

V.2.2) Information about tenders
Number of tenders received: 1

V.2.3) Name and address of the contractor
SilverRail Technologies
27 Maiden Lane, Covent Garden
London
WC2E 7JS

V.2.5) Information about subcontracting
The contract is likely to be subcontracted
Value or proportion likely to be subcontracted to third parties
Proportion: 53 %
Short description of the part of the contract to be subcontracted:
Manufacture, Supply and Maintenance of Ticket Vending Machines
Supply, Software and Support for On-Train Mobile Ticket Sales and Ticket Office Ticket Sales
 

styles

Established Member
Joined
7 Dec 2014
Messages
4,615
Location
Gwynedd
ScotRail have belatedly published the official notice of the contract award to SilverRail.

The total price (including the supply of new TVMs) is £83.7 million.

Interesting to note that the Quality weighting in the procurement was 70% which raises even more questions about the shambolic first publicly visible output of this contract.

Although the contract award date of 29 May 2026 may explain that...

This notices raises two immediate questions from me:
  1. Why did it take over two years from the start of procurement (21 May 2024) to finalize this contract. ScotRail must have known that their contract with Trainline was expiring on 31 July 2026 and would not be renewed; yet a new supplier was not contracted until just two months before the deadline.
  2. Why was only 1 (one) tender received?

Section V.2.5) seems to confirm that the app development was not outsourced (or, if it was, they didn't tell ScotRail about this).

I can only wonder what awaits us if the (outstourced) contract Options are exercised.
£84m is obscene.

I've only worked in rail briefly but I'm pretty sure I could develop a better solution for a fraction of that coat.

Public sector procurement in the UK is honestly a joke.
 

alistairlees

Established Member
Joined
29 Dec 2016
Messages
4,379
£84m is obscene.

I've only worked in rail briefly but I'm pretty sure I could develop a better solution for a fraction of that coat.

Public sector procurement in the UK is honestly a joke.
There's about 350 TVMs in that, which presumably account for the £53m outsourced.
 

styles

Established Member
Joined
7 Dec 2014
Messages
4,615
Location
Gwynedd
There's about 350 TVMs in that, which presumably account for the £53m outsourced.
Ah I missed that when I skim read it.

Not that the TVMs are particularly great either mind.

Even if the amount was exclusively for TVMs, that would value each one at £240,000.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,480
Even if the amount was exclusively for TVMs, that would value each one at £240,000.
Bit it's not exclusively for TVMs, so you can't extrapolate the TVM costs from the total figure.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,427
Location
London
There's about 350 TVMs in that, which presumably account for the £53m outsourced.
The £83.7m is likely to be the total cost over the life of the contract, which is a minimum of 48 months with up to five 12-month extension periods available.
 

kkong

Member
Joined
8 Sep 2008
Messages
1,126
Also interesting that the contract award notice describes SilverRail as an SME (Small or Medium-sized Enterprise).

I would not describe a company which tendered for - and won - an £83 million contract an SME.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,574
Location
UK
Also interesting that the contract award notice describes SilverRail as an SME (Small or Medium-sized Enterprise).

I would not describe a company which tendered for - and won - an £83 million contract an SME.
The definition of SME is a company with a turnover lower than €50 million, or a balance sheet total below €43 million, which has fewer than 250 employees. Companies House documentation (e.g. the latest annual report) suggests that this is the case for the UK entity that the contract is with.

Whether or not a company is an SME is not dictated by the size of the contracts it wins. When you consider that the £83m contract is spread over 4 years, and 53% is subcontracted, the retained turnover from this contract is in the region of £10m a year. A substantial sum for sure, but not out of keeping with the turnover that an SME could have.
 

kkong

Member
Joined
8 Sep 2008
Messages
1,126
The definition of SME is a company with a turnover lower than €50 million, or a balance sheet total below €43 million, which has fewer than 250 employees. Companies House documentation (e.g. the latest annual report) suggests that this is the case for the UK entity that the contract is with.

Whether or not a company is an SME is not dictated by the size of the contracts it wins. When you consider that the £83m contract is spread over 4 years, and 53% is subcontracted, the retained turnover from this contract is in the region of £10m a year. A substantial sum for sure, but not out of keeping with the turnover that an SME could have.

Sub-contracted work still counts as turnover.

So - assuming the 4 years is correct - this will be >£20m per year turnover in addition to what they already do (which won't be insignificant).

Perhaps they were classed as an SME before the ScotRail win, but won't be from then on...

Edit: Your link to the annual report is broken, but I found it anyway. An extract from it (my emphasis):

Going concern

The Company reduced its operating loss from £1.5m in 2024 to £1.1m in 2025. Administrative savings of £1.5m were achieved from the restructuring undertaken in 2024, but these were offset by increased royalty charges (£0.2m), increased consultancy costs (£0.1m), further restructuring costs (£0.3m) and a year-on-year reduction of realised foreign exchange gains of £0.6m. A new customer signed terms in 2025 which will increase the annual revenue from the middle of 2026 onwards, and this contract launched successfully in February 2026. A further significant contract was finalised in early 2026 and went live at the end of July 2026. These two contracts, alongside the Company's existing customers, should enable the Company to return to profitability within two years. The parent company received further investment in 2025 which will enable the Company to meet all of its liabilities for at least the next 12 months.
 
Last edited:

kkong

Member
Joined
8 Sep 2008
Messages
1,126
Anyone have any thoughts or ideas as to why only one tender was received by ScotRail?

Unreasonable terms and conditions, unreasonable requirements, back-loaded milestone payments...?

You'd like to think there would be at least some competition for a contract such this.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,480
Do you think that say, £60k per TVM, is value for money?
I don't know the details of the contract, so I can't comment, but it's for a lot more than just TVMs. And you don't just buy a TVM, you pay for installation, lifetime maintenance, software, updates and so on.

== Doublepost prevention - post automatically merged: ==

Anyone have any thoughts or ideas as to why only one tender was received by ScotRail?

Unreasonable terms and conditions, unreasonable requirements, back-loaded milestone payments...?

You'd like to think there would be at least some competition for a contract such this.
Probably because there weren't other suppliers who wanted to bid for all the elements of the tender at one go.
 

styles

Established Member
Joined
7 Dec 2014
Messages
4,615
Location
Gwynedd
I don't know the details of the contract, so I can't comment, but it's for a lot more than just TVMs. And you don't just buy a TVM, you pay for installation, lifetime maintenance, software, updates and so on.
Sure, and I don't know either. I've taken quite a generous 75% discount off the contract to account for the non-TVM things. I'm asking if you think in principle £60k for a TVM is value for money?

The mobile app is garbage, the website is buggy, the TVMs are often broken; it's hard to see where £84m is providing value.
 

kkong

Member
Joined
8 Sep 2008
Messages
1,126
The mobile app is garbage, the website is buggy, the TVMs are often broken; it's hard to see where £84m is providing value.

The new TVMs haven't been deployed yet (as far as I can see). It would be surprising if they had been, given the contract was only signed 12 weeks ago and they need to be manufactured first!

The current TVMs are S&B.
 

styles

Established Member
Joined
7 Dec 2014
Messages
4,615
Location
Gwynedd
The new TVMs haven't been deployed yet (as far as I can see). It would be surprising if they had been, given the contract was only signed 8 weeks ago and they need to be manufactured first!

The current TVMs are S&B.
Well, I hope for a magically-enhanced experience from the new TVMs at such a price tag. Next time I'm up buying a ticket from a new TVM I'll report back :D
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,480
Surprising that the previous supplier didn't bid considering the app was functional and ready to use
Was the previous supplier in a position to bid for an integrated retail system including TVMs, ticket office and on board TIS?
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,480
Well, was SilverRail if they've had to outsource half of it and haven't delivered a functioning app?
They got the contract, so must have satisfied the requirements. Others didn't bid so must have felt they couldn't or that the requirements were too onerous, I guess.

Point is that it's no good saying this supplier or that supplier could have bid, because we know that they didn't.
 

scosutsut

Established Member
Joined
1 Jan 2019
Messages
1,217
Location
scosutsut
As the on board and station TIS are options, those wouldn't be included in the initial cost? So 53% outsourced would represent what was in the contract and if so it's £44m for ~350 TVMs?

Which would be roughly £125k each over 4 years. Maintenance of a metal box with a computer and a printer inside it shouldn't be crazy I'd imagine.... So that's high set up and installation costs.

I'm sure they will be as big a success as the app tho... I can imagine the self congratulatory posts from the SR PR machine now.
 

teaspoon

Member
Joined
31 May 2011
Messages
61
having had a look at SilverRail's website, their case studies include EMR's 'smart kiosks' - which appears to be the ones that print eTickets on plain paper.

thinking a bit more about this, for me the disappointment isn't that they've given the contract to a company who've failed quite badly at the first hurdle, it's that ScotRail (or Transport Scotland or the Scottish Ministers) haven't been a bit bolder and made any steps towards a modern ticketing system that isn't just based on vending largely point-to-point tickets, whether that's on orange bits of cardboard, ITSO cards, or barcodes on phone screens or on till rolls. (And yes I'm aware of the Tap & Pay app but it's still a right faff compared to TfL contactless or OVpay.)
 

styles

Established Member
Joined
7 Dec 2014
Messages
4,615
Location
Gwynedd
having had a look at SilverRail's website, their case studies include EMR's 'smart kiosks' - which appears to be the ones that print eTickets on plain paper.

thinking a bit more about this, for me the disappointment isn't that they've given the contract to a company who've failed quite badly at the first hurdle, it's that ScotRail (or Transport Scotland or the Scottish Ministers) haven't been a bit bolder and made any steps towards a modern ticketing system that isn't just based on vending largely point-to-point tickets, whether that's on orange bits of cardboard, ITSO cards, or barcodes on phone screens or on till rolls. (And yes I'm aware of the Tap & Pay app but it's still a right faff compared to TfL contactless or OVpay.)
Yeah but those brown envelopes don't come cheap mate.
 

Wallsendmag

Established Member
Joined
11 Dec 2014
Messages
6,258
Location
Wallsend or somewhere on the ECML
having had a look at SilverRail's website, their case studies include EMR's 'smart kiosks' - which appears to be the ones that print eTickets on plain paper.

thinking a bit more about this, for me the disappointment isn't that they've given the contract to a company who've failed quite badly at the first hurdle, it's that ScotRail (or Transport Scotland or the Scottish Ministers) haven't been a bit bolder and made any steps towards a modern ticketing system that isn't just based on vending largely point-to-point tickets, whether that's on orange bits of cardboard, ITSO cards, or barcodes on phone screens or on till rolls. (And yes I'm aware of the Tap & Pay app but it's still a right faff compared to TfL contactless or OVpay.)
These TVMs are very different to those at EMR.
 

Top