I thought it about time for a summary update.

Transpennine Railway Upgrade – route sections
• W1 – Manchester Victoria Stalybridge - Complete
• W2a – Stalybridge station - Complete
• W2b – Stalybridge – Marsden – in design
• W2c – Marsden to Huddersfield – in design
• W3 – Huddersfield- Ravensthorpe – major work in progress (TWAO)
• W4 – Ravensthorpe – Leeds – work in progress
• W5– Morley station – boots on the ground
• E1 – Church Fenton – Colton Jct – awaiting final commissioning
• E2 – Leeds station and to Crossgates – major work in progress
• E3 – Crossgates – Micklefield – major work in progress
• E4 – Micklefield – Church Fenton – major work in progress
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

xdbjacx

Member
Joined
18 Dec 2025
Messages
24
Location
Yorks
I didn't mention car travel, SUVs or otherwise. The worksite is on people's doorsteps. I had the inconvenience of noise during the construction of P0 at Leeds, this is much worse for much longer.
Yes, but the collective benefit of the much-needed and long-deferred investment surely greatly outweighs the temporary disruption and inconvenience, even if it is acutely frustrating at a local level.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,615
Location
Rochdale
Some major closure dates to add the calendar going forward

I've not added every weekend closure because there is just too many!

Gledholt Tunnel works - 19.09.26 - 05.10.26
Church Fenton works - 24.10.26 -02.11.26
Huddersfield TWO - 24.12.26 - 25.01.27
Dewsbury W9 - Only open at weekends between 22.02.27 and 21.05.27

The big one - Thornhill LNW EIS L - 22.05.27 - 28.06.27

Heaton Lodge works W7 - 17.07.27 - 26.07.27
Shipley Depot connection block - 07.08.27 - 23.08.27

TRU works W5,W6,E7,W9 and EIS 23.12.27 - 27.12.27

Gleaned all the information from Vexed website he linked the other day, again its great!

 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
Sorry is that Dewsbury is only open at weekends for three months? I.e. Morley Batley Dewsbury don't get a commuter service for three months?
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,978
Location
Surrey
Some major closure dates to add the calendar going forward

I've not added every weekend closure because there is just too many!

Gledholt Tunnel works - 19.09.26 - 05.10.26
Church Fenton works - 24.10.26 -02.11.26
Huddersfield TWO - 24.12.26 - 25.01.27
Dewsbury W9 - Only open at weekends between 22.02.27 and 21.05.27

The big one - Thornhill LNW EIS L - 22.05.27 - 28.06.27

Heaton Lodge works W7 - 17.07.27 - 26.07.27
Shipley Depot connection block - 07.08.27 - 23.08.27

TRU works W5,W6,E7,W9 and EIS 23.12.27 - 27.12.27

Gleaned all the information from Vexed website he linked the other day, again its great!

Another long closure at Church Fenton whats it for this time?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
Another long closure at Church Fenton whats it for this time?
Won't it be for demolition of old bridge/opening of new, plus OHL wiring through the station linking already-wired sections north and west?
It should be the last bit of work to allow energisation of the OHL through the station.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Won't it be for demolition of old bridge/opening of new, plus OHL wiring through the station linking already-wired sections north and west?
It should be the last bit of work to allow energisation of the OHL through the station.
I think the sheer length of closure is mainly for the bridge, which, unlike most of the ones on the Huddersfield 4-tracking section, is being built in the same position as the old one; said bridge just happens to provide the pedestrian access to Church Fenton's platforms.

From what I've seen, they're adding an additional pier between the Leeds lines and the Normanton lines, which isn't there on the current structure. Perhaps they're using it as an opportunity to replace the decks one pair at a time? (I don't know for certain as I'm not personally involved with the job)
 

Andyh82

Established Member
Joined
19 May 2014
Messages
4,545
What will the block at Shipley consist of? No services to Bradford Forster Square?
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
I think the sheer length of closure is mainly for the bridge, which, unlike most of the ones on the Huddersfield 4-tracking section, is being built in the same position as the old one; said bridge just happens to provide the pedestrian access to Church Fenton's platforms.

From what I've seen, they're adding an additional pier between the Leeds lines and the Normanton lines, which isn't there on the current structure. Perhaps they're using it as an opportunity to replace the decks one pair at a time? (I don't know for certain as I'm not personally involved with the job)
No it's to do with raising the deck and having to slim down the depth of the structure due to road constraints. Means you can't span as far so need an intermediate pier. That's the short version.
 

Tim_UK

Member
Joined
9 Jan 2019
Messages
223
Then that 3 month slot also runs straight into the 5 weeks for Thornhill LNW… Seems odd doesn’t it?
Not if the Dewsbury work is all prep on the embankment and then the Thornhill works are plumbing it all in. Bringing the baker viaduct into use. All the plant will still be in the right place.

It is a year away so plenty of time to be ready. (But this project is full of surprises)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Not if the Dewsbury work is all prep on the embankment and then the Thornhill works are plumbing it all in. Bringing the baker viaduct into use. All the plant will still be in the right place.

It is a year away so plenty of time to be ready. (But this project is full of surprises)
But even then, the major embankment straightening and new bridge at the Thornhill Road & Fall Lane area shouldn’t reach Dewsbury station?

Also, a station ‘only open at weekends’ for such a long period seems a completely unexpected way round, doesn’t it?
 

flyer

Member
Joined
4 Nov 2024
Messages
18
Location
leeds
I’m sure posted already but anyway… the Leeds end looks ready for its wires.
 

Attachments

  • IMG_5865.jpeg
    IMG_5865.jpeg
    6.1 MB · Views: 296

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,377
Location
Taunton or Kent
Is there a link to the document that contains all the planned line speed increases along the route? I remember one existing but can't find it in this mammoth thread.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,615
Location
Rochdale
Apologies to our Dewsbury folks, its not as bad as it looks

Should read...

Dewsbury W9 - Only open at weekends between 22.02.27 and 21.05.27 26.03.27

Then

16.05.27
leading into the big block from the 22.05.27 onwards. So April is a normal month with no weekend closures either as far as Dewsbury its self is concerned. There are still the usual closures at Heaton Lodge etc but trains can depart North from Dewsbury
 

Revaulx

Member
Joined
17 Sep 2019
Messages
524
Location
Saddleworth
What do the Gledholt Tunnel works consist of? Lowering the trackbed to give clearance for overhead wires?

Huddersfield TWO is a long one. Presumably reconfiguring the track layout at the Leeds end. Will the new platforms be ready by then? Progress looks pretty rapid right now.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,232
What do the Gledholt Tunnel works consist of? Lowering the trackbed to give clearance for overhead wires?

Huddersfield TWO is a long one. Presumably reconfiguring the track layout at the Leeds end. Will the new platforms be ready by then? Progress looks pretty rapid right now.
Hopefully line speed increases in the Gledholt tunnel area too.
 

speedy1

Member
Joined
1 Sep 2023
Messages
301
Location
Mossley
I've never seen so many people confused about platforms as at Huddersfield currently. Is it that Platform 1 is so hardly used that people expect P1 to be the westbound and P2 to be eastbound services? The temporary signs don't seem that bad. There are tons of staff to ask. But people are still walking around very confused, reluctant to ask staff, and couples spending minutes reassuring themselves they're on the right platform etc.

Was it this bad before the works?

I think the underpass being closed is still contributing a bit - is it the bridge doesn't register, and people think there is no platform in use on that side ?? (Despite all the staff and people waiting on the platform)

Very interesting people watching there !
 

neil65

Member
Joined
15 Jul 2022
Messages
510
Location
Huddersfield, Kirklees, United Kingdom
I've never seen so many people confused about platforms as at Huddersfield currently. Is it that Platform 1 is so hardly used that people expect P1 to be the westbound and P2 to be eastbound services? The temporary signs don't seem that bad. There are tons of staff to ask. But people are still walking around very confused, reluctant to ask staff, and couples spending minutes reassuring themselves they're on the right platform etc.

Was it this bad before the works?

I think the underpass being closed is still contributing a bit - is it the bridge doesn't register, and people think there is no platform in use on that side ?? (Despite all the staff and people waiting on the platform)

Very interesting people watching there !


i wouldn't say P1 at Huddersfield as hardly used 16 trains arrive and depart every day!!!!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
i wouldn't say P1 at Huddersfield as hardly used 16 trains arrive and depart every day!!!!
It’s also quite a while since the P1 and P2 designations were swapped round, (coming up to a year), so that shouldn't be a source of confusion now?
 
Last edited:

speedy1

Member
Joined
1 Sep 2023
Messages
301
Location
Mossley
i wouldn't say P1 at Huddersfield as hardly used 16 trains arrive and depart every day!!!!
I only meant compared to the 150-200 (?) from other platforms combined ;)

Also just remembered I saw someone walk over the bridge to P3 then ask me if it's the way out.

Maybe the signage is a problem?
 

Tim_UK

Member
Joined
9 Jan 2019
Messages
223
Also just remembered I saw someone walk over the bridge to P3 then ask me if it's the way out.

For many years (at least 18) there has been a rumour around Huddersfield that the subway will be extended to the car park and warehouse out the back. 'The dirty carpark' locally. Maybe this person was just been hopeful.


33 years ago the theatre was going to be in the warehouse. 12 years ago there were plans for a hotel, retail space, offices and maybe a multi storey car park.

The building's owner did spend about £1M fixing the roof.

Remember that pre TPU about 500 people a day would park in the car park looking at trains (and hearing the station announcements), walk out, down Fitzwilliam street, under the bridge and round into the station.

I've had a few people say `oh, I've been driving to Leeds, the trains are messed up for months. Oh it will be great when it's finished and you'll be able to walk straight in from the car park.` I hope that they aren't disappointed and the better service makes up for still having to walk 6 minutes


I'm presuming there will just be an emergency exit route around the back west end of platform 6. And not 2 gatelines. I'm presuming platform 7 definitely gone from the plans.


Also I don't know if the vehicle access to the garages under Brian Jackson house will stay after everything finished.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
I've had a few people say `oh, I've been driving to Leeds, the trains are messed up for months. Oh it will be great when it's finished and you'll be able to walk straight in from the car park.` I hope that they aren't disappointed and the better service makes up for still having to walk 6 minutes

I'm presuming there will just be an emergency exit route around the back west end of platform 6. And not 2 gatelines. I'm presuming platform 7 definitely gone from the plans.
There’s definitely no platform 7, and the station design & access statement doesn’t mention an emergency exit specifically from P6 (it doesn’t really have a ‘back’ as it’s part of the P5/6 island), its two means of escape will be the extended subway and the new footbridge. But the P5/6 island does have an escape route from its south end. The two islands do however get disabled refuges at the extended Leeds end, in case there’s no access available towards the footbridge.
 
Last edited:

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,205
For many years (at least 18) there has been a rumour around Huddersfield that the subway will be extended to the car park and warehouse out the back. 'The dirty carpark' locally. Maybe this person was just been hopeful.


33 years ago the theatre was going to be in the warehouse. 12 years ago there were plans for a hotel, retail space, offices and maybe a multi storey car park.

The building's owner did spend about £1M fixing the roof.

Remember that pre TPU about 500 people a day would park in the car park looking at trains (and hearing the station announcements), walk out, down Fitzwilliam street, under the bridge and round into the station.

I've had a few people say `oh, I've been driving to Leeds, the trains are messed up for months. Oh it will be great when it's finished and you'll be able to walk straight in from the car park.` I hope that they aren't disappointed and the better service makes up for still having to walk 6 minutes


I'm presuming there will just be an emergency exit route around the back west end of platform 6. And not 2 gatelines. I'm presuming platform 7 definitely gone from the plans.


Also I don't know if the vehicle access to the garages under Brian Jackson house will stay after everything finished.
On the first point, that is not in the scope of what the TRU is delivering. Might happen in the future as part of the station master plan that did the rounds online earlier in the year.

The warehouse owner was apparently approached as part of TRU but didn’t want to sell. Apparently they live in Dubai.

Platform 7 will only happen if NPR become a thing.
 