If the track is a continuous track as said to me earlier.

Can someone explain to me how a continuous rail track can expand with the hot or cold weather please
 

SECR 65

Member
Joined
2 Apr 2026
Messages
643
Location
East Sussex
I can confirm that as of mid-morning today (20th Aug) a white 387 coach was at Cooksbridge on the down platform. We can reasonably extrapolate this to be the county end driving car of 387304. How would it have got there, if the down line is significantly damaged? Would it be possible to haul (or propell) the coach slowly if the rail is still intact albeit damaged? Did this coach stay on the rails or not?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
I can confirm that as of mid-morning today (20th Aug) a white 387 coach was at Cooksbridge on the down platform. We can reasonably extrapolate this to be the county end driving car of 387304. How would it have got there, if the down line is significantly damaged? Would it be possible to haul (or propell) the coach slowly if the rail is still intact albeit damaged? Did this coach stay on the rails or not?
There are photos in post #184 showing it off the rails but still almost vertical, but next to a badly distorted rail. My suggestion is the Kirov cranes might have lifted it onto the other track?
 

NaZzAtAzEr

Member
Joined
29 Mar 2018
Messages
60
I saw a video circling around on Facebook of them towing a carriage by crane very slowly.


Video links to Facebook and shows a kirkrow crane towing the crane from one end through a station.
 

RUK

Member
Joined
5 Aug 2009
Messages
400
Location
East of England
I presume that the black-on-yellow hazard stripes on the part of the crane lifting and dragging the damaged end of the carriage might show the parts which are wider and higher than the usual loading gauge, and hence would have had to be pre-checked for special clearance along the route that they wanted to take?
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,513
I presume that the black-on-yellow hazard stripes on the part of the crane lifting and dragging the damaged end of the carriage might show the parts which are wider and higher than the usual loading gauge, and hence would have had to be pre-checked for special clearance along the route that they wanted to take?
There was a lot of that crane that wasn't painted with stripes that was clearly hugely out of gauge in the video. I would have thought it would need an assessment whenever it was moving with the crane deployed.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,165
Location
Yorkshire
If the track is a continuous track as said to me earlier.

Can someone explain to me how a continuous rail track can expand with the hot or cold weather please
This thread is just to discuss the actual incident itself (and what is actually happening in relation to it); any spin-off discussions are very welcome, but only in threads of their own, please :)

The good news is, here are some links for you to find a lot of information on the topic; see below...
Current thread:
(In particular, take note of the posts by @Bald Rick in the thread linked above, and you may also want to read the article I linked to)

Other/previous threads include:
 
Last edited:

kitchenoven

Member
Joined
17 Jun 2024
Messages
22
Location
London
Some news sites are reporting it as 1st September
New NR video confirms 1st september.
An update from Lucy McAuliffe, the route director for Sussex at Network Rail, a week on from the derailment at #Lewes. The line between Lewes and Haywards Heath will reopen to customers on Tuesday 1 September:
 
Last edited by a moderator:

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,886
Location
Fenny Stratford
Its a rather wild photo that even though obviously it could have been way worse. Well done to the onboard staff, imagine being that guy, I don't know if I'd save and keep that photo or never want to think about it again! I thought the calmness of the announcements that got reported on was very good too, last thing you want is panic in the rest of the train.
I would put it in my next performance review to evidence that I had exceeded the customer support objectives!
 

liam456

Member
Joined
6 May 2018
Messages
312
Yes indeed, part of the return to service remit includes earthworks on both sides - work to support the cranes while they lift the carriages further from the track as well as a permanent remediation to the embankment on the down side. Also included is around 400m worth of track renewal for obvious reasons...
 

cats_five

Member
Joined
19 Sep 2021
Messages
225
Location
Scotland
I saw a video circling around on Facebook of them towing a carriage by crane very slowly.


Video links to Facebook and shows a kirkrow crane towing the crane from one end through a station.

I'm not surprised it was slow, looks like what was the back of the carriage is being supported by the crane. Sans wheels? Or no weight on the wheels?
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
it’s also been observed that the derailment site was next to a bridge - which opens the possibility of any change in the earthworks happening abruptly.
The transitions from earthworks to overbridges are often problematic as the sheer mass of the bridge makes it a mostly immovable object, while the approaches either side are flexible. I’ve seen the effects of that registered many times in track measurement vehicles with engineers on board generously explaining the issues.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,915
Location
West Yorkshire/Tuscany
The transitions from earthworks to overbridges are often problematic as the sheer mass of the bridge makes it a mostly immovable object, while the approaches either side are flexible. I’ve seen the effects of that registered many times in track measurement vehicles with engineers on board generously explaining the issues.
....but this is an underbridge. ;)
 

Rick1984

Member
Joined
23 Aug 2012
Messages
1,144
One of the cranes can be seen towing the
re-railed carriage. I take it the other one follows to the point where the carriage is transferred to road?

Update:
I see in later post a road based crane is lifting them off the track onto a low-loafer
 
Last edited:

gabrielhj07

Established Member
Joined
5 May 2022
Messages
1,600
Location
Herts
What appears to have been the leading carriage of 387304 seen today on the M25.
 

Attachments

  • IMG_9504.jpeg
    4.7 MB · Views: 374
Last edited:

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,978
Location
Surrey
Theres some pictures of 387304s coaches being transferred to road vehicles presumably at Cooksbridge

115beff0-9d6d-11f1-a2d1-59489fee904d.jpg


More carriages from a train that derailed near Lewes have been lifted off the tracks and searched as passengers wait to be reunited with their belongings.

A recovery operation is ongoing after the Southern 14:24 BST service from London Victoria to Eastbourne came off the tracks on 13 August, with 150 people on board.

British Transport Police are "sweeping the carriages for personal possessions as soon as they are safe to enter", said a spokesperson for Southern. Network Rail said two out of four carriages at the site were lifted and moved on Thursday, with two others to be moved on Friday.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,722
What appears to have been the trailing carriage of 387304 seen today on the M25.
That looks to be the leading vehicle of 387304, not trailing. If it was the trailing vehicle, the side in the photo would have been the one it came to rest on and it clearly isn't.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,232
That looks to be the leading vehicle of 387304, not trailing. If it was the trailing vehicle, the side in the photo would have been the one it came to rest on and it clearly isn't.
Agreed, leading vehicle of the 387304
 

SECR 65

Member
Joined
2 Apr 2026
Messages
643
Location
East Sussex
Theres some pictures of 387304s coaches being transferred to road vehicles presumably at Cooksbridge

115beff0-9d6d-11f1-a2d1-59489fee904d.jpg
This indeed looks to me like Cooksbridge railway station. I recognise the house on the left. This looks like the station car park. I have to assume they have lifted the coach over the platforms. For reference the line runs from bottom left in this image to centre middle. The light that can be seen on the pole towards the left of the image stands square to the edge of the platform
 

GEC465

Member
Joined
10 Mar 2016
Messages
413
intriguing how none of the pics show the sides that were previously facing the ground
 