Due to an unfortunate incident at Taunton on Saturday evening, the Cross Country 1V64 Edinburgh to Plymouth service reached Plymouth at 0130, 223 minutes late (as shown in the link below). I was wondering what the latest a train to arrive at its destination was without being curtailed at a station on the way.

Realtime Trains | 1V64 1305 Edinburgh to Plymouth | 15/08/2026 https://share.google/ItlbRSpKsOuta9w4s
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Tester

Established Member
Joined
5 Jul 2020
Messages
1,656
Location
Watford
If railtours qualify, I offer the RCTS 'End of Steam Commemorative Rail Tour' on 4 August 1968, which I was on aged 12.

Due Euston 21:47 - actual arrival around 02:15 next day, so around 4.5 hours late. To BR's credit buses to other London terminals were laid on, and I got home via Waterloo to Kingston on the first train.

A bit of an adventure!
 

steamybrian

Established Member
Joined
26 Nov 2010
Messages
1,996
Location
Kent
29 December 1962- last two trains on the Launceston- Tavistock- Plymouth line were delayed over 6 hours- stuck in snow drifts.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
Multiple times due to disruption on ECML I've know trains to arrive into Edinburgh and London over 6 hours late, usually the services towards the end of the day.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
Only a few months back I think people were quoting 6/7/8 hour delays during a recent ECML meltdown. The Caledonian Sleeper is normally a favourite for picking up such ridiculous delays.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
Didn’t Henry and train get bricked up in a tunnel? He was there months!
 

Tester

Established Member
Joined
5 Jul 2020
Messages
1,656
Location
Watford
Unless it was re-railed.
A train which derails, and is re-railed with the passengers still on board (or even with the passengers watching from the sidelines) and then continues its journey to its original destination with said passengers on board, would in my opinion most definitely qualify for this thread!

Of course in reality this is not what happens.

Having said that, I have been on a train in exactly that situation, and indeed assisted with the re-railing. However as it was on the Leighton Buzzard Light Railway, it really doesn't count :D
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,244
Via Rail 46 (Toronto to Ottawa) reached its destination 344 minutes late the Thursday before last due to mechanical issues. I'm sure that far longer delays are common on their non-corridor routes and on longer Amtrak routes; that's just the first delay over an hour I found.
 

notspy

Member
Joined
1 Mar 2023
Messages
60
Location
Manchester
The longest I’ve ever seen out and about. +479 late into EDB last year, I believe due to a inside fire near Peterborough.
 

Attachments

  • IMG_0238.png
    IMG_0238.png
    483.6 KB · Views: 188

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
I had about 18 hours on a Friday Plymouth to Newcastle service around spring 1972. There was some sort of industrial dispute going on, I think the maximum time we spent stationary was at Derby, for about 4-5 hours. Was it even known as Cross Country back then?

I think the normal through service took about 7 hours, but taking one train for the whole distance was unusual, most of the day you had to change as the majority of trains didn’t cover the full route. I think you could change at any main station between Sheffield and Bristol, but that’s from my 54 year memory…
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
I had about 18 hours on a Friday Plymouth to Newcastle service around spring 1972. There was some sort of industrial dispute going on, I think the maximum time we spent stationary was at Derby, for about 4-5 hours. Was it even known as Cross Country back then?

I think the normal through service took about 7 hours, but taking one train for the whole distance was unusual, most of the day you had to change as the majority of trains didn’t cover the full route. I think you could change at any main station between Sheffield and Bristol, but that’s from my 54 year memory…

"North East - South West".
 

JohnofWessex

Member
Joined
3 Jan 2026
Messages
134
Location
frome
I seem to remember in the early 80's the Edinburgh - Plymouth or VV train could turn up anywhere at any time usually horribly late.

I remember passing it in the loop at Bromsgrove, two 37's on the back but nothing on the front.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
The longest I’ve ever seen out and about. +479 late into EDB last year, I believe due to a inside fire near Peterborough.
Getting into Via Rail/Amtrak lengths of delay there!
I raise you 486L, Wednesday last week:

Screenshot_20260818_205157_Samsung Browser.jpg

(Screenshot shows Realtimetrains running data for train 1S15 1203 LNER London King's Cross to Inverness 'Highland Chieftain' for Wednesday 12th August, in which the train arrived at destination 486 mins late by the public timetable.)
 

FenMan

Established Member
Joined
13 Oct 2011
Messages
1,538
1990, on honeymoon and returning to Paris Bercy from Nice on the sleeper/motorail service, due in around 8am. In the middle of the night a lorry jumped off a bridge onto the tracks somwhere north of Lyon. Job stopped and we were in the middle of nowhere. It stayed stopped for many hours - water supplies exhausted, no food, non-air conditioned carriages getting steaming hot under the summer sun and the loos getting very grim indeed. Angry American tourists demanding instant action colliding with the confusion of the onboard staff added to the gaiety.

The issue being, our consist was so long, and being a motorail service, it could only be accommodated at Bercy. After slowly backing up to a junction, we headed northeast and eventually approached Paris from the east. Instead of SNCF evacuating foot passengers somewhere reasonably sensible we then shuffled around Paris, including reversals, for nearly three hours before finally arriving at Bercy at 5pm.

That was a long day, around 19 hours on the train!
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,574
Location
UK
Via Rail 46 (Toronto to Ottawa) reached its destination 344 minutes late the Thursday before last due to mechanical issues. I'm sure that far longer delays are common on their non-corridor routes and on longer Amtrak routes; that's just the first delay over an hour I found.
I was about 9 hours late when I took the Canadian from Toronto to Vancouver. We were up to 15 hours late at one point. I'm sure longer delays have happened but extreme delays seem routine on Via Rail, even more so than the couple of hours of delays you can almost expect with Amtrak (5 hours when I took the California Zephyr).
 

Strathclyder

Established Member
Joined
12 Jun 2013
Messages
3,819
Location
Clydebank
I raise you 486L, Wednesday last week:

View attachment 209845

(Screenshot shows Realtimetrains running data for train 1S15 1203 LNER London King's Cross to Inverness 'Highland Chieftain' for Wednesday 12th August, in which the train arrived at destination 486 mins late by the public timetable.)
Good lord, being stuck on an Azuma that long would have me wearing a groove in the carpet/floor from having to give my backside a break from those bloody awful seats.
 

150249

Established Member
Joined
13 Dec 2021
Messages
1,235
Location
The better Devon city
I raise you 486L, Wednesday last week:

View attachment 209845

(Screenshot shows Realtimetrains running data for train 1S15 1203 LNER London King's Cross to Inverness 'Highland Chieftain' for Wednesday 12th August, in which the train arrived at destination 486 mins late by the public timetable.)
Is that real and not a Realtime Trains bug where it tracked again the next morning while running ECS? What could have possibly happened between Aviemore and Inverness?

I raise you 486L, Wednesday last week:

View attachment 209845

(Screenshot shows Realtimetrains running data for train 1S15 1203 LNER London King's Cross to Inverness 'Highland Chieftain' for Wednesday 12th August, in which the train arrived at destination 486 mins late by the public timetable.)
I wonder why it stayed at Doncaster for so long. I would assume to switch train crew for safety reasons?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
Is that real and not a Realtime Trains bug where it tracked again the next morning while running ECS? What could have possibly happened between Aviemore and Inverness?
No, it's accurate.

It sadly hit a person at Carrbridge and the line was blocked for several hours.

The next morning's service south was cancelled and the unit worked to Craigentinny ECS in the mid-afternoon instead.
 

etr221

Established Member
Joined
10 Mar 2018
Messages
1,581
The classic story - apocryphal maybe, but with basis in how it was - was of someone who went to visit their friends who lived up country in one of the colonies, and when it was time to return, saw that train was at 12:00, and insisted on being at the station in ample time, over the protests of their friends, who said it was never on time; but there, at 12:00 was the train. So they said good bye and told you so to their friends, boarded the train and off they went. At which point friends rounded on the station master: 'What's going on, the train is never on time?'. To which the response was 'No, that wasn't today's train on time, it was yesterday's, 24 hours late'.

And an Amtrak story: railfan in (I think) Buffalo, NY, went down to the depot to see the (daily) train go through - which, after a couple of hours, it did. And when they were walking back to their car, the station man, who knew what them and what they were doing, called that there would be another in a couple more hours. Which there was. That was yesterday's train. The first one they'd seen was the day before yesterday's train. Today's train had been cancelled; the stock to form it hadn't yet arrived on its outward run... But there was several feet of snow on the ground.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
Getting into Via Rail/Amtrak lengths of delay there!

Co-incidentally I struck up a conversation with a couple next to me on an Avanti service a couple of weeks ago. The lady, even older than me, had first worked on the Monon Railroad (she said 'It ran from Chicago to Kentucky!! - I had to look it up, it does make sense) so we got talking railways.
They went on to describe their luckless Amtrak journey from California to Chicago, though it doesn't count in this thread because the train never reached Chicago. After a couple of engine failures - one visually spectacular - they then stood 'in a cornfield' for a long while to allow the affects of a freight train derailment ahead to be resolved. Freight trains were then given priority, and when the delay exceeded 2 days, Amtrak gave in and arranged for road coaches.
The last meal they were offered on the train was dinner consisting of mashed potato and beef gravy with a spoon for cutlery. The lavatories and sinks had long run out of water. Couples with children had run out of nappies, people had run out of medication. Hotel accommodation, onward flights, family visits at Chicago were all ruined.
Puts delays on our rail network in the shade.
 

Top