*In theory* a GBRf 92 could take a 16 carriage mk5 sleeper train down the WCML, then through Kensington Olympia and Wandsworth Rd onto the old route to the Channel Tunnel...is that correct?
 

ShadowKnight

Member
Joined
22 Oct 2019
Messages
240
Location
Liverpool
Existing infrastructure needs to, well, exist.
Existing infrastructure does exist. There are 4 probably usable interfaces between HS1/Channel tunnel and the classic GB network.
1. NLL connection at St Pancras
2. Ripple lane sidings in Barking
3. Ashford international
4. Dollands Moor sidings/the channel tunnel itself
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
Existing infrastructure does exist. There are 4 probably usable interfaces between HS1/Channel tunnel and the classic GB network.
1. NLL connection at St Pancras
2. Ripple lane sidings in Barking
3. Ashford international
4. Dollands Moor sidings/the channel tunnel itself

NLL connection at St Pancras doesn’t exist. Although there is track there, you could not run a passenger train on it without some fairly hefty expenditure on signalling.

*In theory* a GBRf 92 could take a 16 carriage mk5 sleeper train down the WCML, then through Kensington Olympia and Wandsworth Rd onto the old route to the Channel Tunnel...is that correct?

I genuinely don’t know … Do any of the 92s retain operational signalling and electrification electrification equipment for all the necessary systems on the UK network and Channel Tunnel?
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,043
Location
Liverpool
On the subject of actually likely future services, do we know of anything in relation to Virgin's plans to compete with Eurostar? Have they applied for track access or signed any contracts with Alstom over rolling stock orders?
 

Trainguy34

Established Member
Joined
29 Apr 2023
Messages
1,227
Location
Kent
I genuinely don’t know … Do any of the 92s retain operational signalling and electrification electrification equipment for all the necessary systems on the UK network and Channel Tunnel?
I believe they can run on HS1/CTRL, but I'm not sure about anything past Dollands Moor towards Calais.
 

TheWierdOne

Member
Joined
30 Oct 2020
Messages
386
Location
Yorkshire
On the subject of actually likely future services, do we know of anything in relation to Virgin's plans to compete with Eurostar? Have they applied for track access or signed any contracts with Alstom over rolling stock orders?
Track access not sure, although there’s no reasonable obstacle to them being successful on the UK side. I believe there are available paths on the European side otherwise Virgin et al. would not be bothering.

For rolling stock they have a “purchase rights” deal with Alstom which I believe will now become a contract for 12 Avelia Stream trainsets.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,043
Location
Liverpool
Track access not sure, although there’s no reasonable obstacle to them being successful on the UK side. I believe there are available paths on the European side otherwise Virgin et al. would not be bothering.

For rolling stock they have a “purchase rights” deal with Alstom which I believe will now become a contract for 12 Avelia Stream trainsets.
To be honest I would've thought the biggest obstacle in this situation would've been SNCF with LGV Nord access, although legally they cannot stop competition by EU law, especially when they have a stake in every passenger service currently running on the line (100% all TGV services as well as majority shares in Eurostar). I do think it'd be great to see Virgin enter by the end of the decade.
 

TheWierdOne

Member
Joined
30 Oct 2020
Messages
386
Location
Yorkshire
To be honest I would've thought the biggest obstacle in this situation would've been SNCF with LGV Nord access, although legally they cannot stop competition by EU law, especially when they have a stake in every passenger service currently running on the line (100% all TGV services as well as majority shares in Eurostar). I do think it'd be great to see Virgin enter by the end of the decade.
Yes I would think the same, although it would be silly of SNCF to try anything more than being slow with responses and applications. The ECJ would quickly slap anything blatant down when Virgin challenged.
 

BRX

Established Member
Joined
20 Oct 2008
Messages
4,477
I genuinely don’t know … Do any of the 92s retain operational signalling and electrification electrification equipment for all the necessary systems on the UK network and Channel Tunnel?

Info on this thread suggests that those in the GBST pool do.
 

Clansman

Established Member
Joined
4 Jan 2016
Messages
2,646
Location
Scotland and Hong Kong
Either it's a good old kamikaze-by-consultancy to provide some red meat to transport campaigners, or the Scottish Government are genuinley committed to the service being extended under the right conditions in future as an oven ready option.

Remember that the Scottish Government has a track record of subsidising transport into oblivion relative to counterparts across the UK, and for good economic justification if it proves to increase tourism direct to the Highlands (and notwithstanding that Scotland by geographical nature naturally cannot generate an overall profit for rail).

Difficult to gauge which way the pendulum swings on this one, but it wouldn't be in the nature of the Scottish Government to do the former since you'd expect their homework to have been done internally on this, with some degree of consultation with Transport Scotland, Caledonian Sleeper and ScotRail on the economic prospect of it all without the need to commission any third party studies.
 

CdBrux

Member
Joined
4 Mar 2014
Messages
919
Location
Munich
If they are canny (as opposed to cannae) they will at least mention that one of the main obstacles is Brexit / non Schengen.
I'm sure they will, no matter how relevant, or not, that would be.
Even if there were no need for security checks, passports etc... there were no infrastructure compatibility issues (not including capacity to find suitable paths) would there be a big enough market for this to work even to the level of subsidy the Scottish government may wish to give it... I highly doubt it! If there isn't all other possible obstacles mentioned in these posts are quite irrelevant!

London to some points on the continent seems to me to be the only speculation worth even spending effort to discuss! Not that this ever stops the fantasists
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,043
Location
Liverpool
London to some points on the continent seems to me to be the only speculation worth even spending effort to discuss! Not that this ever stops the fantasists
I think the only other cities that could fit into a cross-Channel network would be Birmingham, Manchester and Leeds which are significant enough that HS2 was planned to serve them directly. Sleeper trains are already difficult enough to be worth the money as it is now, so adding the complexities of juxtaposed controls and different track access charges, rolling stock specification and training staff over multiple networks with different rules would be a nightmare.
 

CdBrux

Member
Joined
4 Mar 2014
Messages
919
Location
Munich
I think the only other cities that could fit into a cross-Channel network would be Birmingham, Manchester and Leeds which are significant enough that HS2 was planned to serve them directly.
As I've said before this conversation has been done to death (and way beyond) on this and other forums multiple times in the last 10 years and the answer is a clear no. The only change since then with the pruning back of HS2 is that paths on HS2 may now be available. I doubt this gets close to changing the basic economics though
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
The only change since then with the pruning back of HS2 is that paths on HS2 may now be available. I doubt this gets close to changing the basic economics though
Whatever capacity may or may not be avaiable on HS2 became irrelevant once the HS1/2 link was canned.
 

CdBrux

Member
Joined
4 Mar 2014
Messages
919
Location
Munich
Whatever capacity may or may not be avaiable on HS2 became irrelevant once the HS1/2 link was canned.
I agree, however the conversation always seems to be "there's enough demand from xyz to justify an HS1/ HS2 link" and my view is that, even with a link and other issues such as security being solved there still would be (generously) an extremely marginal case, and certainly not enough to have built the link as first mooted. Anyway enough time spent on, what is to me, an obvious non starter!
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
I agree, however the conversation always seems to be "there's enough demand from xyz to justify an HS1/ HS2 link" and my view is that, even with a link and other issues such as security being solved there still would be (generously) an extremely marginal case, and certainly not enough to have built the link as first mooted. Anyway enough time spent on, what is to me, an obvious non starter!

And completing full HS2 to fill the spine to 18tph is more economically useful than reserving some of those paths for Channel Tunnel traffic.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,043
Location
Liverpool
As I've said before this conversation has been done to death (and way beyond) on this and other forums multiple times in the last 10 years and the answer is a clear no. The only change since then with the pruning back of HS2 is that paths on HS2 may now be available. I doubt this gets close to changing the basic economics though
The point was that that they are the only others cities that might be worth cross-Channel traffic compared to Caledonian Sleeper services. But unless the UK joins Schengen and paths become available it's not happening. It's already difficult enough getting passengers from London where the catchment is actually worth it.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
would there be a big enough market for this to work even to the level of subsidy the Scottish government may wish to give it...

Well, the air + rail market for Glasgow / Edinburgh to Paris / Brussels / Amsterdam is roughly 15-20% of the air + rail market of London to Glasgow / Edinburgh.

A decent proportion of the Scotland - Amsterdam air market will be transfer passengers at Schiphol. Paris will have quite a few too. (Albeit so does Heathrow).

It’s reasonable to assume that if the same proportion of the city to city market willing to travel by sleeper between London / the South East and the Central Belt were willing to travel between the Central Belt and Paris / Brussels / Amsterdam by sleeper, there would be enough for about 2 sleeper coaches per night each way total.
 
Last edited:

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,496
Location
Neilston, East Renfrewshire
you'd expect their homework to have been done internally on this, with some degree of consultation with Transport Scotland, Caledonian Sleeper and ScotRail on the economic prospect of it all without the need to commission any third party studies.

The only homework necessary is to consider what happened to the last proposal for Channel Tunnel Sleeper services. That is all that is required to sink this madcap idea.
 

CdBrux

Member
Joined
4 Mar 2014
Messages
919
Location
Munich
And completing full HS2 to fill the spine to 18tph is more economically useful than reserving some of those paths for Channel Tunnel traffic.

Quite!

Well, the air + rail market for Glasgow / Edinburgh to Paris / Brussels / Amsterdam is roughly 15-20% of the air + rail market of London to Glasgow / Edinburgh.

A decent proportion of the Scotland - Amsterdam air market will be transfer passengers at Schiphol. Paris will have quite a few too. (Albeit so does Heathrow).

It’s reasonable to assume that if the same proportion of the city to city market willing to travel by sleeper between London / the South East and the Central Belt were willing to travel between the Central Belt and Paris / Brussels / Amsterdam by sleeper, there would be enough for about 2 sleeper coaches per night each way total.

Thanks, that's given me a good laugh!

The only homework necessary is to consider what happened to the last proposal for Channel Tunnel Sleeper services. That is all that is required to sink this madcap idea.

Precisely, but (unfortunately) not good politics or a nice earner for a consultancy company to try and disprove the obvious
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Appears TrenItalia has ordered another 19 high speed trains from Hitachi for cross border services, including ambition to establishing Paris-London

FS Italiane Group has unveiled a major €2 billion investment programme that will see its French subsidiary, Trenitalia France, acquire 19 new high-speed trains from Hitachi Rail, reinforcing its long-term ambition to expand across France and establish a direct high-speed service between Paris and London by 2029.

The new trains will enable Trenitalia France to strengthen operations on its established Paris–Lyon, Paris–Milan and Paris–Marseille routes through higher frequencies, improved passenger experience and increased capacity. Crucially, the fleet will also support the launch of the company's planned Paris–London high-speed service, which remains targeted for 2029.

Designed for operation across Europe's major high-speed rail networks, the trains will enhance cross-border interoperability and support FS Group's wider ambition of creating a truly connected European rail network.

Alongside the fleet expansion, work is continuing on schedule at the new Maisons-Alfort Pompadour maintenance facility near Paris. The depot will provide the maintenance capacity required to support a larger fleet and future international services.

 

danshrimp

Member
Joined
3 Oct 2018
Messages
187
Location
Birmingham/Leeds
Nothing actually new here, according to Jon Worth. But good to hear their intentions restated I suppose.
Before anyone gets carried away with this "Trenitalia places an order for 19 trains" thing https://www.railmagazine.com/news/t...ed-trains-to-spearhead-paris-london-expansion

... is the same news as was announced in December https://www.ansa.it/english/news/20...ces_63c0c38d-8688-4ccb-9a73-35a43cffdf4c.html

19 200m trains for ALL their French services, AND *theoretically* Paris-London is not many
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Nothing actually new here, according to Jon Worth. But good to hear their intentions restated I suppose.
The 19 take order to 74, and they are already in production, 9 have been delivered (most recent is numbered 109). An earlier batch of 50 have been in service in italy a few years (of which 2 are out of service due to incidents)

The new announcement today allocated the 19 to France, to be based at Maisons Alfort Pompadour (Paris), the new depot on leased land where old goods sidings were. Initially for Paris-Lyon, Paris-Milan and Paris-Marseille with Paris-London from 2029.

It appears they want to launch ahead of Eurostar and Virgin getting new trains, presumably to build market share before competition hots up
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
Slightly OT, but does anyone know if Trenitalia plan on running double sets on their LGV Sud-est services? Thanks.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,043
Location
Liverpool
Given Virgin plan on ordering 12 trains for a London to Paris, Brussels and Amsterdam service, I'd think 19 would be enough for London to Paris which is the only bit of Eurostar competition they're interested in.
 

marshlinker

Member
Joined
18 May 2026
Messages
143
Location
Romney Marsh
Aside from regional Eurostar and the odd Kent-North England services (1tph Dover to Manchester?), I wouldn’t imagine all that much through running. But you could have consolidated the termini of HS1, HS2 and Eurostar into one purpose built high speed station to facilitate easy interchange and tube connections. Stick it all in one station deep under Bond Street and Oxford Circus (nobody said I had to go for realism, crayons galore) and hey presto you have a direct tube link to every conventional London terminus, except the special star Fenchurch Street.
You wouldn't run the train to Dover south of London anymore, Canterbury, Ramsgate, Margate would have far more traffic.
Dover is really just a romantic trainspotter destination because of the 5 foot passenger ferries per day but the reality is to hasn't really attracted any rail sail traffic since the channel tunnel opened.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
News that ORR has pre-approved upto 20 Virgin trains daily from 1st October 2030 to 31 Dec 2040. London to Paris / Brussels / Amsterdam
The Office of Rail and Road (ORR), the rail regulator, has today announced that on 13 August it decided to pre-approve a new framework track access agreement between HS1 Limited (trading as London St. Pancras Highspeed) and VTE OPCO Limited (Virgin Trains). The agreement will allow Virgin Trains to operate up to 20 new daily return services between London and Paris, Brussels or Amsterdam from 1 October 2030 to 31 December 2040.

Appear to have given Virgin just 3 weeks to enter into agreement with St Pancras station
Virgin Trains and London St Pancras High Speed may now enter into the agreement by 4 September 2026.

There are a number of steps before the new services will be able to run. Virgin Trains must also procure rolling stock, secure access to other rail networks, and obtain safety approvals from ORR and the relevant authorities in the EU. Virgin Trains plans to begin running services in 2030.

 
Last edited:

TheWierdOne

Member
Joined
30 Oct 2020
Messages
386
Location
Yorkshire
Appear to have given Virgin just 3 weeks to enter into agreement with St Pancras station
It would be monumentally short sighted of the ORR to give them three weeks to negotiate a complex commercial contract without knowledge that Virgin and St Pancras had something basically ready to go. The press would have a field day over the matter, and they’re already doing quite well off of the various derailments in the Southeast.
 

CdBrux

Member
Joined
4 Mar 2014
Messages
919
Location
Munich
Do we have any idea how well Virgin are progressing in the "secure access to other rail networks, and obtain safety approvals from ORR and the relevant authorities in the EU." part?
 