Killingworth
Established Member
All trains stopped between Manchester and Sheffield since about 14.00. Fire crews in attendance at Totley end which is quite hard to access.
From SY Fire & Rescue Facebook
== Doublepost prevention - post automatically merged: ==
Rail replacement buses being organised. Inspection needed so no trains expected to run before 17.30 according to National Rail on X.
== Doublepost prevention - post automatically merged: ==
In olden times smoke would pour out of both ends of the tunnel and out of the air shafts after a heavy coal train had laboured through. More recentky there have been occasional small fires on modern dmus and they've caused passengers some concern when the train has stopped. Fortunately none have been serious.
Today the last train through seems to have been a late running EMR service; https://www.realtimetrains.co.uk/service/gb-nr:05016/2026-08-15/detailed#allox_id=0
It appears to have taken almost 18 minutes instead of the normal maximum of 5 to pass through.
The previous TPE services in both directions were delayed for long periods before passing through.
This event reminds us of the almost 6 minute necessary separation that adds further to delays on the Hope Valley line. No train is permitted to enter the tunnel until the previous train has fully cleared.
Latest is that 6 fire engines were deployed
From SY Fire & Rescue Facebook
Four fire crews are in attendance at a fire in Totley rail tunnel in Sheffield.
There is a lot of smoke in the area so please keep windows and doors closed if you live nearby and avoid the area if possible.
== Doublepost prevention - post automatically merged: ==
Rail replacement buses being organised. Inspection needed so no trains expected to run before 17.30 according to National Rail on X.
== Doublepost prevention - post automatically merged: ==
In olden times smoke would pour out of both ends of the tunnel and out of the air shafts after a heavy coal train had laboured through. More recentky there have been occasional small fires on modern dmus and they've caused passengers some concern when the train has stopped. Fortunately none have been serious.
Today the last train through seems to have been a late running EMR service; https://www.realtimetrains.co.uk/service/gb-nr:05016/2026-08-15/detailed#allox_id=0
It appears to have taken almost 18 minutes instead of the normal maximum of 5 to pass through.
The previous TPE services in both directions were delayed for long periods before passing through.
This event reminds us of the almost 6 minute necessary separation that adds further to delays on the Hope Valley line. No train is permitted to enter the tunnel until the previous train has fully cleared.
Latest is that 6 fire engines were deployed
Last edited: