Are the recent derailments indicative of poor performance from Network Rail?

saismee

Established Member
Joined
20 Oct 2023
Messages
1,672
Location
UK
Moderator note: split from



It looks as though this could become a trend with this hot weather. Two mainline derailments now.

Could this be indicative of Network Rail failing to monitor and enforce speed restrictions in a timely manner?

I seem to recall a post about someone from NR (a whistleblower?) suggesting that a major derailment was likely in the near future. I hope it's just a coincidence.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Tetragon213

Member
Joined
14 Oct 2024
Messages
675
Location
West Midlands
Three derailments in less than 24 hours is, shall we say, rather suboptimal and a very bad showing from the railway. I'll be surprised if it's not heat related.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
I'm aware rail travel is still very safe but at what point do we admit the number of serious accidents is increasing and is something more that a coincidence?
 

jack31439

Member
Joined
29 Apr 2016
Messages
77
Location
South London
I'm aware rail travel is still very safe but at what point do we admit the number of serious accidents is increasing and is something more that a coincidence?
All about having the data and identifying the trends. Of course that can often be interpreted in many ways, as usually happens.
 

driverd

Member
Joined
29 Mar 2021
Messages
904
Location
UK
Whichever way you interpret the data, we're seeing an increase.

Not necessarily, a clustering of incidents doesn't imply an overall increase. Eg: hypothetically speaking, if there were 10 derailments spread roughtly once per year 2006-2016, and 2 that occurred within a week 2016-2026, that is not an overall increase. Equally, if you compared with last week, you could plot a sharp and significant increase in just a week!

Hence the old adage about data being able to tell you anything in the right circumstances.

For all we know, this could just be a sheer coincidence. If there is a trend here, or similar causality, I have no doubt it will be identified by the RAIB. Until then, best not speculate and just rest assured that we have an incredibly safe railway system.
 

develop331

Member
Joined
9 Apr 2026
Messages
5
Location
London
It would be interesting if they treated all three as one large issue and made one big press release about it (if it is determined to all have been due to similar cause of course)... Three separate investigations with similar causes and ultimately similar learning points/recommendations probably wouldn't be productive for RAIB to publish
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,672
Location
UK
It would be interesting if they treated all three as one large issue and made one big press release about it (if it is determined to all have been due to similar cause of course)... Three separate investigations with similar causes and ultimately similar learning points/recommendations probably wouldn't be productive for RAIB to publish
Merging them sounds like a really good way to miss an important factor and cause a serious problem down the line.
 

Amos390

Member
Joined
22 Jan 2025
Messages
675
Location
Nottingham
There was one at Clapham yard this morning
Yes 444011 on 5Z02, won't go into further detail as there's a whole thread on that now (as linked by @Intercity_225 here), but it was very minor
 
Joined
27 Aug 2017
Messages
47
It would be interesting if they treated all three as one large issue and made one big press release about it (if it is determined to all have been due to similar cause of course)... Three separate investigations with similar causes and ultimately similar learning points/recommendations probably wouldn't be productive for RAIB to publish
Two higher speed at high temperatures and potentially due to buckling. The third was slow speed in a depot early when it was still cool. Two might be related, the other almost certainly not.
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,524
Location
Wales
Two higher speed at high temperatures and potentially due to buckling. The third was slow speed in a depot early when it was still cool. Two might be related, the other almost certainly not.
And incidents when shunting are far more common than outsiders realise.
 

Edders23

Member
Joined
22 Sep 2018
Messages
567
the sooner these high heat conditions finish and normal weather resumes the better it is pushing all of our transport infrastructure to the limits of it's endurance; not just the railways but roads, canals and rivers everything is being affected. At least this incident looks a lot less serious so a team of well equipped track staff should be able to get the errant carriage back on track. Any infrastructure damage might take longer
 

milooo

Member
Joined
3 Dec 2024
Messages
201
Location
Stevenage
National Rail released a statement on X saying
We understand many people may be feeling concerned following the recent incidents on the railway.

Our thoughts are with everyone affected.
Safety is, and always will be, our highest priority.

We're working closely with industry partners to establish the facts and understand exactly what happened.

If you're travelling today, please check your before you travel at http://nationalrail.co.uk

For the latest incident and infrastructure updates, follow
@networkrail
https://x.com/nationalrailenq/status/2088311110583628215?s=20 is the link to the statement on X
 

Intercity_225

Member
Joined
13 Jan 2024
Messages
582
Location
March
National Rail released a statement on X saying

https://x.com/nationalrailenq/status/2088311110583628215?s=20 is the link to the statement on X
Of course I'm sure alot of us here believe that it is just a coincidence that all of these incidents have happened so close to eachother, but I'm sure alot of ordinary passengers are worried about the fact these incidents have happened and may cancel plans to take the train. I think a campaign of some kind should be made on how safe the railway really is (especially compared to other modes of transport).
 

GPR

Member
Joined
16 Oct 2011
Messages
226
Location
Liverpool
Statistically the most likely place to have an incident given the concentration of services. I wouldn't read too much into it.
It’s been consistently 5-10 degrees warmer down south than where I live though. With the way the track looked regarding yesterdays derailment I believe temperature will have be a factor in the derailments.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,604
Location
Hope Valley
It’s been consistently 5-10 degrees warmer down south than where I live though. With the way the track looked regarding yesterdays derailment I believe temperature will have be a factor in the derailments.
I note that your profile shows you in Liverpool.
Yesterday Sheffield was 35 degrees. Fair play to Kew Gardens that broke the record for this year at just over 38 degrees but it’s not that much cooler in the ‘North of England’ (as described by some).
 

millemille

Member
Joined
28 Jul 2011
Messages
407
Location
Derbyshire
And incidents when shunting are far more common than outsiders realise.
This.

Depots and yards typically use track that has been removed from mainline use, unless being built from scratch, because it is life expired for high speed running but is fine, in theory, for low speed use when moving trains around depots or yards.

I was an on-call Fleet Technical Officer for a TOC many moons ago and I reckon myself and my colleagues were probably looking at an average of a derailment during shunting every 2 or 3 weeks.
 

evergreenadam

Member
Joined
23 Nov 2013
Messages
323
This.

Depots and yards typically use track that has been removed from mainline use, unless being built from scratch, because it is life expired for high speed running but is fine, in theory, for low speed use when moving trains around depots or yards.

I was an on-call Fleet Technical Officer for a TOC many moons ago and I reckon myself and my colleagues were probably looking at an average of a derailment during shunting every 2 or 3 weeks.
Interesting, was it difficult to get the trains back on the rails? I have no idea how you would go about doing it.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,733
Location
Newport
This.

Depots and yards typically use track that has been removed from mainline use, unless being built from scratch, because it is life expired for high speed running but is fine, in theory, for low speed use when moving trains around depots or yards.

I was an on-call Fleet Technical Officer for a TOC many moons ago and I reckon myself and my colleagues were probably looking at an average of a derailment during shunting every 2 or 3 weeks.
Another burgeration factor in most yards - Handpoints.
 

millemille

Member
Joined
28 Jul 2011
Messages
407
Location
Derbyshire
Interesting, was it difficult to get the trains back on the rails? I have no idea how you would go about doing it.
We had our own re-railing gang with a variety of jacks and traversing tables and air bags and generator sets and all the blocks of wood etc.

But a lot of the time you could, because they were invariably low speed and only one or two axles "in the dirt", with judicious use lumps of wood simply drive the derailed axles back on simply reversing back up the direction of derailment.
 

millemille

Member
Joined
28 Jul 2011
Messages
407
Location
Derbyshire
Another burgeration factor in most yards - Handpoints.
Indeed.

With shunter/drivers who will swear back is white and that they definitely checked the blades were thrown and latched in place despite the forward facing CCTV from the train clearly showing they weren't even looking at the points when they threw the handle and you could see the blades bounce and not latch and the diverging gauge being clear to see but they still drove the train over them and it MUST have been a points failure and the trade union will NOT stand for the cause of the derailment being listed in the internal investigation report as shunter/driver error and not following company procedures, despite this being the 3rd time they've put a train in the dirt....

....and breathe.
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,524
Location
Wales
Indeed.

With shunter/drivers who will swear back is white and that they definitely checked the blades were thrown and latched in place despite the forward facing CCTV from the train clearly showing they weren't even looking at the points when they threw the handle and you could see the blades bounce and not latch and the diverging gauge being clear to see but they still drove the train over them and it MUST have been a points failure and the trade union will NOT stand for the cause of the derailment being listed in the internal investigation report as shunter/driver error and not following company procedures, despite this being the 3rd time they've put a train in the dirt....

....and breathe.
Don't forget the number of SPADs involving ground signals.
 