Not really. It takes time for the signal behind to clear, so I’d guess that eastbound trains would be overtaken at Thorpe Park/before Garforth, westbound at Cross Gates, if there was four-tracking between those two stations only.

(Which is more or less what @YorkshireBear wrote above.j

Adding a further station at Osmondthorpe/Killingbeck would slow the stopper into the clutches of the next fast service, and you’d be back to where you were.

All of those suburban stations ideas were abandoned (apart from East Garforth) after the first few WY Railplans, probably as traffic levels increased.
Agreed. What that gives you effectively is a dynamic passing loop with two stations. Which should (I think) give you time to pass two fast trains. If they run the fasts as hot behind the stoppers as they do now you should get two past them (the time I lose sat on the Airport services behind the York Leeds stopper from Garforth to Leeds whenever the stopper is more than 1-2L, which it often is as it gets held for late running Liverpool services).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,311
From Cross Gates to about the M1 over bridge is the maximum it would be. Allowing trains stopping at Thorpe Park and Cross Gates to be overtaken.
And presumably those stopping at Micklefield, subject to the track layout
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,697
Location
Leeds
Well here's a thing: updated visuals, on WYCA's LinkedIn page. They seem to suggest three platforms and three through lines - so a bit like Slaithwaite and Marsden? But a passing lane (bidi or just westbound), rather than a crawler?
 

Attachments

  • 1786447783507.jpeg
    1786447783507.jpeg
    181.7 KB · Views: 48
  • 1786447783186.jpeg
    1786447783186.jpeg
    228.9 KB · Views: 44
  • 1786447782835.jpeg
    1786447782835.jpeg
    187.7 KB · Views: 44
  • 1786447782683.jpeg
    1786447782683.jpeg
    173.6 KB · Views: 47

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
I suspect that is bad visuals. They always said they would build two platforms on a four track alignment, with then a temporary platform to serve the current, York bound line, with bridges between. Suspect the visualisations have just kept the track that isn't being built.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
I suspect that is bad visuals. They always said they would build two platforms on a four track alignment, with then a temporary platform to serve the current, York bound line, with bridges between. Suspect the visualisations have just kept the track that isn't being built.

The visualisations do appear to show the outer platforms to be prefab concrete sections with the inner/middle platform GRP (If I remember the term correctly) composite. So it look like they will build both permanent platforms from the get go.
 

Grimsby town

Member
Joined
4 Apr 2011
Messages
852
Well here's a thing: updated visuals, on WYCA's LinkedIn page. They seem to suggest three platforms and three through lines - so a bit like Slaithwaite and Marsden? But a passing lane (bidi or just westbound), rather than a crawler?
Thanks for posting, definitely interesting that the thinking is a temporary platform that can be removed to allow for four tracking. It seems to suggest that Network rail is fairly confident four tracking will happen and I'd guess that's what funding announced for NPR, between Leeds and York, will deliver.

I'm slightly disappointed they haven't gone with a solution that would allow the slow lines to be located between the slow lines, which would have potentially allowed for a turn back siding for trains to terminate at Thorpe Park. That would have required rebuilding Cross Gates as a central island platform. I hope they consider a potential flyover to allow trains to terminate at Thorpe Park, continue to a siding, reverse and cross the fast tracks to access the Leeds bound platform. That would provide extra resilience in the network and provide Cross Gates and Thorpe Park with turn up and go services.
 

xdbjacx

Member
Joined
18 Dec 2025
Messages
24
Location
Yorks
Thanks for posting, definitely interesting that the thinking is a temporary platform that can be removed to allow for four tracking. It seems to suggest that Network rail is fairly confident four tracking will happen and I'd guess that's what funding announced for NPR, between Leeds and York, will deliver.

I'm slightly disappointed they haven't gone with a solution that would allow the slow lines to be located between the slow lines, which would have potentially allowed for a turn back siding for trains to terminate at Thorpe Park. That would have required rebuilding Cross Gates as a central island platform. I hope they consider a potential flyover to allow trains to terminate at Thorpe Park, continue to a siding, reverse and cross the fast tracks to access the Leeds bound platform. That would provide extra resilience in the network and provide Cross Gates and Thorpe Park with turn up and go services.
Why would it be good to have a turn up and go service between Leeds and Thorpe Park only, as opposed to between Leeds and York, or at least between Leeds and Micklefield with the combined efforts of Leeds-York and Leeds-Hull stoppers? If you wanted to build an extremely expensive grade separated turnback, why there specifically?
 

Grimsby town

Member
Joined
4 Apr 2011
Messages
852
Why would it be good to have a turn up and go service between Leeds and Thorpe Park only, as opposed to between Leeds and York, or at least between Leeds and Micklefield with the combined efforts of Leeds-York and Leeds-Hull stoppers? If you wanted to build an extremely expensive grade separated turnback, why there specifically?
Because Cross Gates and Thorpe Park serve the Leeds urban area and therefore serve large populations and have better onward transport connections. East Garforth and Micklefield serve populations of a couple of thousand, East Garforth because most of Garforth's population will use Garforth and Micklefield because its only a large village. Half-hourly service is about right for that size of catchment area. Garforth gets a fairly good service already, so there's less need for an increase.

The other issue constraint is infrastructure. In my opinion, you'd ideally have a 10-15 minute headway for stopping services calling at Cross Gates, Thorpe Park and continuing on to Garforth, where some trains would terminate and two would continue to York/Selby. Unfortunately, there isn't the room around Garforth for additional tracks/platforms and it's going to be difficult to path additional all stop services all the way to York/Selby (particularly York given it already struggles with capacity).

The cheaper alternative to a flyover is stop services like the York-Blackpool at Cross Gates but that obviously creates a time penalty for those services.
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
547
Location
UK
Will Thorpe Park be able to terminate local services? 4ph stoppers, 2ph of which continue to York and 2ph terminating at Thorpe Park could work well. Thorpe Park terminators could be extensions of other services east of Leeds (eg, Bradford FS)
 

Grimsby town

Member
Joined
4 Apr 2011
Messages
852
Will Thorpe Park be able to terminate local services? 4ph stoppers, 2ph of which continue to York and 2ph terminating at Thorpe Park could work well. Thorpe Park terminators could be extensions of other services east of Leeds (eg, Bradford FS)
It's not the plan from what I've seen but it definitely should be considered and would revive the plan for an East Leeds Parkway.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
Will Thorpe Park be able to terminate local services? 4ph stoppers, 2ph of which continue to York and 2ph terminating at Thorpe Park could work well. Thorpe Park terminators could be extensions of other services east of Leeds (eg, Bradford FS)

If your going to send electric services through Leeds from Forster Square you might as well send them all the way to York!
 

Grimsby town

Member
Joined
4 Apr 2011
Messages
852
If your going to send electric services through Leeds from Forster Square you might as well send them all the way to York!
Using which platforms at York? I don't think there's much scope for terminating additonal services without additonal platforms. There's also potential capacity issues at Colton Junction.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
Using which platforms at York? I don't think there's much scope for terminating additonal services without additonal platforms. There's also potential capacity issues at Colton Junction.
Since we are in the 'Speculative Discussion' forum...

Additional South facing platforms could be added to the East in what is currently a disused island platform. If what used to be P12 was reinstated next to P8 then the through platforms wouldn't be needed to be used for North facing terminating services as much. I don't think creating capacity at York would be that much of an issue as for Colton Junction I'm not sure how to solve that but I suspect someone else will know.
 