• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

TfW class 398 Stadler Citylink tram trains

MikePJ

Member
Joined
10 Dec 2015
Messages
1,002
No 398s today because of engineering works closing the line north of Radyr - seems to be just a single 150 shuttle on the Bay branch.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,575
Location
Llanharan
No 398s today because of engineering works closing the line north of Radyr - seems to be just a single 150 shuttle on the Bay branch.
Tomorrow will be the opposite whereas a 398 is booked to shuttle on the Bay line the entire day.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
Tomorrow will be the opposite whereas a 398 is booked to shuttle on the Bay line the entire day.
I wonder how close are we to three 398s out in passenger service on one day ?.

Will the limit be number of trained crew OR number of accepted 398s....
 

chargesmith

Member
Joined
14 Nov 2023
Messages
251
Location
South Wales
Based on what I can see in RTT, there will be a 398 out next Sunday which would be a new milestone for the roll out if it happens.

It's a long way away so it's subject to change (especially with the engineering works next week) but checking RTT was how I was able to correctly work out that 2 units would be out this week.

I'll keep an eye out and see if any plans appear to put more than 2 services out on weekdays.

== Doublepost prevention - post automatically merged: ==

Tomorrow will be the opposite whereas a 398 is booked to shuttle on the Bay line the entire day.
That must mean that the wires are live.

== Doublepost prevention - post automatically merged: ==

RTT also says that on the 17th there is planned to be an early morning service from Cardiff Central to Pontypridd - so this could be the first 398 in public service to run on Network Rail infrastructure.

It seems that later in that week it is planned to bring at least one additional unit which will split at Cardiff Central, with at least one going to Pontypridd and at least one going to Queen Street and then into the Bay, mimicing the 150 entry into service from Cardiff Canton Depot.

(I believe the 398s are designed to be capable of running three in multiple, but only for empty stock moves and not in public service).
 
Last edited:

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
398030 arriving at the bay yesterday morning… couldn’t hear the pantograph retract but was down at Queen Street where I got off…
Nice photo.

It is really hitting home to me that they are in one of my stamping grounds - the bay (well not so in that they get wet !).
 

positron

Member
Joined
18 Oct 2022
Messages
660
Location
Cardiff
Has TfW updated its public position on when the 398s will be introduced to the Treherbert, Aberdare and Merthyr lines? In May, they said that it would be "later this summer", but that now looks very unlikely.
I don't think they've published anything to even acknowledge they're in passenger service yet. I think the question is how many units are needed to run the treherbert diagrams? I suspect that'll be the route that switches first, given they want to extend the pontypridd service up there too.

== Doublepost prevention - post automatically merged: ==

398030 arriving at the bay yesterday morning… couldn’t hear the pantograph retract but was down at Queen Street where I got off…
Nice to see them finally using the wires down there.

If they do run on network rail track soon that'll be a big milestone to show they're capable of actually making these things work in practice for their end plan.

Even if it's only a few units that are up to scratch hopefully they'll have worked out exactly the changes that need making the other units and they can get on with doing that.
 

EveningStarr

Member
Joined
24 Oct 2024
Messages
49
Location
South Wales
I wonder if they'll prioritise putting 398s on other Taff diagrams or extending the Pontypridd services to get Treherbert up to 4tph first? Am I right in thinking it would need an additional 4 diagrams for Treherbert-Bay? To slot these in with the current shuttle run up to Queen Street before going back Up the valley, it'll have to be only a single 3-car unit due to the length of platform 1.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
Newbie in service today. 398018 showing on the Bay shuttle
Thanks, list updated.
I feel a list coming on :-

398001
398002
398003
398004
398005
398006
398007
398008
398009
398010
398011
398012
398013
398014
398015
398016 Testing
398017 In service on 28/07/2026 6th, two in service 03/08/2026 (398017 and 398029 not coupled)
398018 In service on 10/08/2026, Testing (multi ?) before
398019
398020 Testing (multi)
398021 Testing
398022 In service on 03/07/2026 4th (all day 23/07/2026)
398023 Testing
398024 In service on 25/06/2026 3rd
398025 Testing
398026
398027
398028 In service on 23/06/2026 1st
398029 In service on 31/07/2026 7th, also did first weekend service (Saturday 01/08/2026), two in service 03/08/2026 (398017 and 398029 not coupled)
398030 In service on 14/07/2026 5th
398031 In service on 24/07/2026 2nd
398032 Old Dalby
398033
398034 Delivered on 14/05/2026 ?
398035 Not yet delivered
398036 Not yet delivered

That is all the past dates (before 01/08/2026) I can unearth.
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,935
Location
Wales (sometimes in England), thanks for replying!
Newbie in service today. 398018 showing on the Bay shuttle
Thanks for letting us know :)

The entry-to-service of 398018 'today' (Mon 10/8/26) now means that 8 (of 36) 398s have been in service:

398017-018, 398022, 398024, 398028-031

The number of 398s still to enter service is down to 28:

398001-016, 398019-021, 398023, 398025-027, 398032-036

=============================

The overall number of new Transport for Wales (TfW) trains that have been in service is now up to 119 (of 148):

76 (of 77) 197s
All 11 231s
8 (of 36) 398s
All 24 756s

This leaves 29 new TfW trains still to enter service:

1 197
28 398s

== Doublepost prevention - post automatically merged: ==

New YouTube video from Colin Prosser that starts out with Class 398s at Cardiff Central on Mon 10/8/26 (and has more clips of them at around 9 and 10 minutes):

 
Last edited:

Daniel Boone

Member
Joined
13 Oct 2024
Messages
113
Location
United Kingdom
With the closure of all lines past Radyr, the Bay diagram is continuing to be operated exclusively by 398s shuttling between QS and the Bay.

Today, 017 was running the service until a problem with it's brakes at ∼16:30 this afternoon (according to RTT)

028 is booked for the rest of the day, not sure if this was originally planned or whether it's reactionary. Yesterday's bookings suggest the latter.

Apologies, I should've been more precise in my language - there are currently no passenger services beyond Radyr*
 
Last edited:

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,900
How are they getting to and from Taffs Well depot if the line is closed beyond Radyr?

Presumably it's actually closed somewhere north of Taffs Well but Radyr is a more appropriate place to terminate passenger services.

I was wondering the same thing earlier and looked at Traksy but there are no closures shown which is a little surprising.
 

Da142072

Member
Joined
26 Jun 2021
Messages
12
Location
Tonteg
Presumably it's actually closed somewhere north of Taffs Well but Radyr is a more appropriate place to terminate passenger services.

I was wondering the same thing earlier and looked at Traksy but there are no closures shown which is a little surprising.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,709
Location
West of Andover
Presumably it's actually closed somewhere north of Taffs Well but Radyr is a more appropriate place to terminate passenger services.

I was wondering the same thing earlier and looked at Traksy but there are no closures shown which is a little surprising.
Considering there are ECS shunts from Radyr to Radyr via Taffs Well (ie
https://www.realtimetrains.co.uk/service/gb-nr:V05804/2026-08-11/detailed#allox_id=0) the line must be open to at least Taffs Well.

I presume the crossover being used at Taffs Well isn't a permitted passenger move
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,002
I finally got a ride on a 398 today, on a steaming hot day, and the air chill seemed to be working perfectly. All very comfortable, at least for the very short ride to Queen Street.
 

Attachments

  • IMG_4042.jpeg
    IMG_4042.jpeg
    2.6 MB · Views: 131

trainspotter4

Member
Joined
24 Jul 2025
Messages
41
Location
Cardiff
Seems like another unit has made it out on testing (to Cardiff Central and back) overnight, 398011, the earliest (oldest) unit to be seen out on testing so seems like modifications to the older delivered units must be progressing.
 
Last edited:

MikePJ

Member
Joined
10 Dec 2015
Messages
1,002
Looks like we’re back to 2x 398s in service again after last week’s engineering works. 398028 and 398029 are both out today on the Pontypridd to Cardiff Bay service.
 

chargesmith

Member
Joined
14 Nov 2023
Messages
251
Location
South Wales
I saw 033 on the A470 side of the depot this morning, might make a testing appearance soon.

001 is in what some think is the wheel lathe siding but I think it's been there for a while.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
Have had word to say there should be 3x 398s out from Wednesday
Great to hear.

Given all the doom and gloom we were hearing about the units from one contributor (who has gone strangely quiet for the last month), it's really positive that there seems to be slow but steady progress in rolling the units out.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,575
Location
Llanharan
Great to hear.

Given all the doom and gloom we were hearing about the units from one contributor (who has gone strangely quiet for the last month), it's really positive that there seems to be slow but steady progress in rolling the units out.
Weird that the moment they start rolling out in larger numbers with few failures that said contributor who said so many different things about the units and how awful they would be has vanished. Good to see them rolling out in bigger numbers and hopefully that means a positive outlook for December when a significantly larger workload is required. It just means all the fleets can move to their retrospective lines (i.e. 231s Mainline, 756s on the Rhymney line, 197s off Maesteg/Ebbw/Cheltenham to elsewhere...)

Wonder if we'll see one be used on the TAM lines before the December timetable!
 

tomoufc

Member
Joined
12 Dec 2014
Messages
358
Great to hear.

Given all the doom and gloom we were hearing about the units from one contributor (who has gone strangely quiet for the last month), it's really positive that there seems to be slow but steady progress in rolling the units out.
The job lot of portable showers must have been delivered
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,575
Location
Llanharan
How many units does Pontypridd - Bay (including the shuttling) require?
3 units. Today 2 of the diagrams are 398s and one is a 150. If a 3rd 398 is sent out that'll mark the end of 150s on the Cardiff Bay branch, assuming none need to be called in to help.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,727
Location
Worcester
3 units. Today 2 of the diagrams are 398s and one is a 150. If a 3rd 398 is sent out that'll mark the end of 150s on the Cardiff Bay branch, assuming none need to be called in to help.
Mind you, when I left Cardiff (lived there 2021-2024), they weren’t regular on the line anyway. Used to be a 153/9 Mon-Sat and a 150 on Sundays.
 

Top