Heathrow Tunnel Partial Closure Monday 10/08

Thames99

Member
Joined
11 Sep 2023
Messages
324
Location
Reading
According to this article
the tunnel into Heathrow is partially closed because of a 'water leak'. No Elizabeth line trains are running between Hayes and Harlington and the airport. There is a limited Heathrow Express service.

GWR's website says that there is a good service on all lines, but Paddington departures show curtailed and cancelled services.

Does anyone know exactly what the problem is? The article puts water leak in inverted commas as if they are not sure whether to believe it or not.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

signed

Established Member
Joined
13 May 2024
Messages
2,369
Location
ROI

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,586
Location
Greater Manchester
Looking at Traksy the tunnel towards the City from Platform 2 at Heathrow Central) is shut.
Traksy screenshot with signal blocks showing *LB* and SHUT on the line out of Heathrow Central Platform 2

T4 seems to have a very limited service, only a couple Elizabeth Line trains so far today - bit surprised there's no Heathrow Express running as a shuttle, I assume everyone's having to get the Tube or Bus.
Looks like the service that remains is an every 30 minutes Heathrow Express from T5.
 

rower40

Member
Joined
1 Jan 2008
Messages
577
Given the number of lineside fires during this year's heatwaves, I'd suggest that an over-eager fire suppression system is a "right-side" failure.
 

TFN

Member
Joined
17 Aug 2017
Messages
458
Location
London
Leaving the water to leak can cause water to pool up, affecting track circuits and causing signal failures etc.

Switching off the water supply in that tunnel means I’m guessing there’s regulations that don’t allow trains into a tunnel with no fire suppression available?

This is the second time in recent months that the Up tunnel is closed between T2/3 and Hayes.
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
Still going on today.

Looks like the plan they've settled on is half hourly Heathrow express to T5 and half hourly Elizabeth line to T4.

Requires flighting to get 8tph through that tunnel and not looking very punctual so far.
 

Warrior2852

Member
Joined
27 Oct 2018
Messages
315
T4 seems to have a very limited service, only a couple Elizabeth Line trains so far today - bit surprised there's no Heathrow Express running as a shuttle, I assume everyone's having to get the Tube or Bus.
Would HEX drivers even have competencies on the T4 branch? There's no HEX services down there these days, not even a Parliamentary, it's all Elizabeth Line.
 

TFN

Member
Joined
17 Aug 2017
Messages
458
Location
London
Would HEX drivers even have competencies on the T4 branch? There's no HEX services down there these days, not even a Parliamentary, it's all Elizabeth Line.
They’re still competent. They can get diverted down to T4 if needs be and HEX run the terminal shuttles on Christmas and Boxing Day.
 

signed

Established Member
Joined
13 May 2024
Messages
2,369
Location
ROI
Is it the first time HEx only granted acceptance to pre-booked tickets only?

I had never seen this catch when seeing planned acceptance (when EL shut between Ealing Broadway and core in the wee hours of the morning for example.)
 

RJ

Established Member
Joined
25 Jun 2005
Messages
8,811
Location
Back office
Taxis will be busy. Fortunately Paddington is quite unique in Central London for being all dual carriageway / motorway to the airport. Even during the day it barely takes 40 minutes to get to T5.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
Taxis will be busy. Fortunately Paddington is quite unique in Central London for being all dual carriageway / motorway to the airport. Even during the day it barely takes 40 minutes to get to T5.
But the first 20 mins is painful crawling in traffic before you get to the motorway. The driver had to keep promising me and the guy I shared with last year that we would be going a lot faster once we reached the motorway.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
Fully reopened now.

The mad thing is this is almost a repeat of an incident that happened a couple of months ago. Not great for major national infrastructure and a railway line connected to one of the world's busiest airports.

== Doublepost prevention - post automatically merged: ==

Is it the first time HEx only granted acceptance to pre-booked tickets only?

I had never seen this catch when seeing planned acceptance (when EL shut between Ealing Broadway and core in the wee hours of the morning for example.)

Definitely not. In fact this is almost always the case because Contactless / Oyster will automatically calculate based on where you tap in / tap out at Paddington which service you have taken and of course the price difference can be substantial. It would be nice if there was a sensible workaround but all parties don't seem to be able to agree what that might be without zero fare being obtained (e.g. being let out of the gateline to tap in elsewhere).
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,586
Location
Greater Manchester
The mad thing is this is almost a repeat of an incident that happened a couple of months ago. Not great for major national infrastructure and a railway line connected to one of the world's busiest airports.
Would I be correct in saying Heathrow own the tunnels?
If so I'm sure they'll be having some interesting conversations about what happened given I would expect them to care more about customer experience than most TOCs.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
Would I be correct in saying Heathrow own the tunnels?
If so I'm sure they'll be having some interesting conversations about what happened given I would expect them to care more about customer experience than most TOCs.

Indeed - all owned by Heathrow Airport Limited (HAL). Although NR often come to assist them on infrastructure issues.
 

stuving

Member
Joined
26 Jan 2017
Messages
722
Indeed - all owned by Heathrow Airport Limited (HAL). Although NR often come to assist them on infrastructure issues.
According to the HAL Network Statement, Network Rail are Asset Manager, Infrastructure Manager, and Operator for the track, railway communications, signalling, and overhead lines. HAL have the same full responsibility for ventilation, non-railway communications, stations, and the control room. For tunnel structures HAL is AM and NR is IM.

In the description of the two tunnels (covering the whole HAL network) there is this:
Intervention shafts are provided at locations allowing egress and access for emergency services.
Intervention points also exist at the tunnel portals and at the stations. Cross passages link the
twin tunnels. All the tunnels have emergency walkways, at track level for emergency services
and at platform level for passengers. A tunnel ventilation system provides a supply of fresh air
that removes stale air and enables the direction of air flow to be controlled. The ventilation is
controlled from the HRCR.

A wet fire main is provided throughout the running tunnels to provide the emergency services
with a water supply for firefighting purposes should a fire break out on a train. This is
supplemented by a forced ventilation system to ensure that passenger escape routes and access
routes for emergency services are kept clear of smoke.

The W&W Sectional Appendix clarifies that the Heathrow Rail Control Room does control fire monitoring and protection, and access to the tunnels, so this is all HAL's responsibility. So while it is not explicit that HAL are responsible for the fire suppression system itself, it does sound as though they are.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
According to the HAL Network Statement, Network Rail are Asset Manager, Infrastructure Manager, and Operator for the track, railway communications, signalling, and overhead lines. HAL have the same full responsibility for ventilation, non-railway communications, stations, and the control room. For tunnel structures HAL is AM and NR is IM.

In the description of the two tunnels (covering the whole HAL network) there is this:


The W&W Sectional Appendix clarifies that the Heathrow Rail Control Room does control fire monitoring and protection, and access to the tunnels, so this is all HAL's responsibility. So while it is not explicit that HAL are responsible for the fire suppression system itself, it does sound as though they are.

Good overview of the network responsibility. Yes, I am pretty sure HAL are the fire suppression system managers and maintainers.

The issues that have caused prolonged disruption in recent months have mostly been around the fire suppression issues and leaking hydrants and looking up who is responsible gives some context as to why it seems to take so long to resolve.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Fully reopened now.
Looks like the Elizabeth line got the full service back to both Terminals 4 and 5 just after 5pm. HEX have advertised the cancellation for the half-hourly service, presumably there's a fairly low chance of them reinstating them and they'll stick with half-hourly to the end of service.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
Looks like the Elizabeth line got the full service back to both Terminals 4 and 5 just after 5pm. HEX have advertised the cancellation for the half-hourly service, presumably there's a fairly low chance of them reinstating them and they'll stick with half-hourly to the end of service.

It is a little easier for the Elizabeth line - instead of terminating at Hayes / West Drayton / Paddington the trains just run through so very easy to reinstate. HEX shouldn't be too hard but if they've sent trains off to West Ealing sidings it's a little bit more of a faff to reintroduce.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
It is a little easier for the Elizabeth line - instead of terminating at Hayes / West Drayton / Paddington the trains just run through so very easy to reinstate.
Indeed. They also didn't cancel the services too far in advance, so it's less work to reinstate them (just ask the driver to phone control and tell them they're going on to Heathrow)
HEX shouldn't be too hard but if they've sent trains off to West Ealing sidings it's a little bit more of a faff to reintroduce.
By the looks of RTT they never took the units of Reading TCD this morning.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
By the looks of RTT they never took the units of Reading TCD this morning.

Even more hassle then! Guess they need to find a driver who signs the 387-Air units (ETCS trained).
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
And today the water main in the road tunnel to the CTA (T2 and T3) has burst so Heathrow are advising all passengers to use rail or tube to get to / from T2+3.
Luckily the 2 sets of problems didn't happen at the same time!


 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
It is worrying just how many issues they appear to have with water mains / hydrants / fire supression systems; it can't all be coincidence but appears to be taking their eye off the ball for maintenance.

Looks like its reopened now.
 