Whistler40145
Established Member
With East Coast planning a refurbishment programme for it's Class 91 fleet.
I have read in a Railway publication that top & tail 91s are to be used as a testbed for the InterCity Express Project, is this to ascertain any problems with 2 91s drawing power at the same time?
I have read in a Railway publication that top & tail 91s are to be used as a testbed for the InterCity Express Project, is this to ascertain any problems with 2 91s drawing power at the same time?