I'm on the 13:53 from Euston to Piccadilly. We just made an unscheduled stop at Nuneaton due to the issues further north. We're now on the move again (23 or so mins late), but it will be interesting to see how far we get!

Literally just now at 17:00!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,806
I've heard of generators failing effectively because they've been tested too often & run out of fuel! o_O This seems more complicated than a simple generator outage though.
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,770
At least presumably a (lengthy) Metrolink journey is possible from there?
Yes, the Metro stop is adjacent to the station. Think the line runs from Rochdale to Oldham then Victoria - if so a local bus to Manchester or to Bury (then Metro) might be quicker?
 

Andyh82

Established Member
Joined
19 May 2014
Messages
4,545
On the TPE, it looks like there hasn’t been a train from Huddersfield to Manchester since just before 1pm. Some trains got as far as Marsden before turning back.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,488
Location
Cheshire
Oh I dread to think what the Schedule 8 cost for NR will be at the end of all this! Although note that the compensation from NR is tied to the value of each minute's delay/cancellations of the TOC's trains, not the value of any compensation the TOC may be required to pay out to their passengers.
Judging by the fact that Piccadilly is mess, and nothing much has moved from Victoria and Oxford Road, someone's got an awkward meeting tomorrow.

Just as an aside, whilst I realise how difficult a situation this is, a "Do not travel" notice in the middle of a working day, from one of the biggest cities in the country isn't really helpful. People will have to travel one way or another, so maybe have a "Here's how you might be able to make your journey", with a live page offering alternatives wherever possible.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,824
This shows the problem with what might be regarded as overcentralisation. Historically the local signal boxes were too labour intensive and there was rightly seen as a need to get away with that. What did other countries do? I know Switzerland has signal panels in stations and people seem to appear from other jobs to set routes.

If you are going to place a lot of dependence on these huge 'ROCs', a lot of thought should be going into the power supply arrangements. There should be multiple grid feeds with the opportunity to switch automatically between them along with diesel generators that can come in if needed. I once worked on a safety critical plant with A and B supplies where a failure of the A supply (I heard the bang when it disconnected at the substation). The B supply failed to take over and the diesel generator also failed to start up. Subsequent investigation showed that the B supply was in fact dependent on the A supply and there was another design issue in the diesel system. Much improvement was needed.
The flip side is that it can take a certain scale before redundancy is worth it. Does every individual signalbox have generator backup? Whereas with something of the scale of the ROC you absolutely will put in UPS, generator backup, redundant grid feeds etc.
 

matchmaker

Established Member
Joined
8 Mar 2009
Messages
1,868
Location
Central Scotland
This shows the problem with what might be regarded as overcentralisation. Historically the local signal boxes were too labour intensive and there was rightly seen as a need to get away with that. What did other countries do? I know Switzerland has signal panels in stations and people seem to appear from other jobs to set routes.

If you are going to place a lot of dependence on these huge 'ROCs', a lot of thought should be going into the power supply arrangements. There should be multiple grid feeds with the opportunity to switch automatically between them along with diesel generators that can come in if needed. I once worked on a safety critical plant with A and B supplies where a failure of the A supply (I heard the bang when it disconnected at the substation). The B supply failed to take over and the diesel generator also failed to start up. Subsequent investigation showed that the B supply was in fact dependent on the A supply and there was another design issue in the diesel system. Much improvement was needed.


That one too. One piece of equipment had a redundant and a current database in the PC. The responsible person wanted to reformat the PC. i told him there were two databases and to make sure he had a copy of the right one. It turned out that the automated daily backups had been made of the redundant database and he lost all the data.
Meantime, on the Caledonian Sleeper thread...

"Dalwhinnie Signaller reports, mains power failure affecting signalling at Dalwhinnie area of control. Unable to run to or from Blair Atholl and Kingussie."

Highland Main Line closed due to power failure at isolated traditional box!
 

Intercity_225

Member
Joined
13 Jan 2024
Messages
582
Location
March
It's the specific part of the contract between NR and TOCs/FOCs that handles the delay compensation between them:


Other people will probably be able to provide far more detail than me.
Cheers :)
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,151
Yes, the Metro stop is adjacent to the station. Think the line runs from Rochdale to Oldham then Victoria - if so a local bus to Manchester or to Bury (then Metro) might be quicker?
If you're talking about getting a bus from Rochdale over to Bury Interchange, and then a tram from Bury into Manchester, then that, IMHO, has to be a somewhat longer overall journey time than just getting a tram from Rochdale to Manchester (via Oldham).
 

Steddenm

Established Member
Joined
2 Mar 2017
Messages
1,250
Location
Clane, Co. Kildare
Would the Metrolink between Deansgate Junction/Navigation Road to Altrincham be affected by the disruption as isn't this section signalled by Network Rail?
 

Topmandog1

Member
Joined
18 Apr 2026
Messages
28
Location
England
They probably do but it is a classic in the IT world that generators get tested quite often but then one or more things happen to cause the test to be meaningless:

1. They don't do an actual switchover - just see that the generators start and never apply load
2. They have used nearly all the fuel in testing and when needed in anger there is none / little left - stop laughing there at the back as it happens all to often.
Guess it's like the 2000s when television centres backup supply caught fire
 

dantheman1973

New Member
Joined
6 Aug 2026
Messages
2
Location
Durham
Hello everyone. I hope yous can help.

I’m booked on the 22:12 from Durham to York on TPE. Then the 23:38 from York to Manchester, once again with TPE. I also need to be at Manchester airport in time for a 6am flight.

I’ve noticed that the York-Manchester train has now been cancelled, and with TPE announcing to not travel at all for the rest of the day, what are my options.

Thank You!
 

sharpener

Member
Joined
4 Oct 2018
Messages
370
I've heard of generators failing effectively because they've been tested too often & run out of fuel! o_O This seems more complicated than a simple generator outage though.
Lots of failure modes are possible and many described upthread.

To give them their due the recovery seems under way and much more quickly than after the Heathrow substation fire.
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,488
Location
Cheshire
Would the Metrolink between Deansgate Junction/Navigation Road to Altrincham be affected by the disruption as isn't this section signalled by Network Rail?
No it seems, I travelled down to Altrincham without issue.
 

Topmandog1

Member
Joined
18 Apr 2026
Messages
28
Location
England
Not necessarily. A firm I worked for tested them once a month. On one occasion the Facilities Manager thought it would be smart to put the batteries on boost charge afterwards. Then he forgot and they boiled dry.

A few days later there was a real power cut and the genny failed to start leaving entire complex without any power.
Well I mean yes testing too often is an issue but clearly something needs to happen to prevent what happened today happening again anytime soon
 

Justin Smith

Established Member
Joined
14 Nov 2009
Messages
1,415
Location
Sheffield
I’m at Oxford Road waiting for a train, nothing is moving although there are signs of life at Piccadilly now so that’s promising.

It would happen the one day I manage to finish early at work…
We were travelling to Sheffield, originally from Oxford Rd, and took the decision to walk to Piccadilly despite being told "it'd be no better". For once the Gods were smiling on us and we just had time to get on the 14.48 stopper because it left 36min late ! This goes via Romiley not Stockport and actually gained 3 minutes on its journey, arriving Sheff at 16.38. I expected it to be packed, as did the guard, but it wasn't, which was very surprising. In my view a lot of passengers at Piccadilly made the wrong decision......
 

wilsontown

Member
Joined
11 Feb 2012
Messages
141
Just seen a 10-car TPE 802 formation go through Leeds, empty. All TPE towards York cancelled for the next couple of hours. Going to sit in Leeds with a pint for a bit and probably go Northern to York, possibly via Harrogate.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,075
Location
Wilmslow
Would the Metrolink between Deansgate Junction/Navigation Road to Altrincham be affected by the disruption as isn't this section signalled by Network Rail?
No, because the signals are controlled by the local signal boxes (Deansgate Junction), as is Stockport, so were either not directly affected or recovered quickly.
As others have pointed out, the downside of large centralised control centres mean they can be "all or nothing" under certain circumstances, and clearly Manchester Victoria has been much more badly affected than I first thought. It's not a "Network Rail" issue, it's to do with how Network Rail has implemented certain systems in certain places.
 

Trainguy34

Established Member
Joined
29 Apr 2023
Messages
1,227
Location
Kent
Hello everyone. I hope yous can help.

I’m booked on the 22:12 from Durham to York on TPE. Then the 23:38 from York to Manchester, once again with TPE. I also need to be at Manchester airport in time for a 6am flight.

I’ve noticed that the York-Manchester train has now been cancelled, and with TPE announcing to not travel at all for the rest of the day, what are my options.

Thank You!
Best bet I can see is either a taxi from York or the 2315 Northern RRB to Leeds, spend an hour there and get the 0220 National Express Coach to Manchester Airport (Arrives 04:20). In theory you should be able to get reimbursed for the coach, although it looks to only cost £9.90.
 

sjm77

Member
Joined
8 Jan 2020
Messages
327
Location
Manchester
Just as an aside, whilst I realise how difficult a situation this is, a "Do not travel" notice in the middle of a working day, from one of the biggest cities in the country isn't really helpful. People will have to travel one way or another, so maybe have a "Here's how you might be able to make your journey", with a live page offering alternatives wherever possible
100% agree with this! When I read this on Northern website I thought they might as well have said "Sleep in your office tonight".
 

James268

Member
Joined
1 Feb 2014
Messages
37
That service is terminating at Rochdale - looks like Victoria is still entirely blocked.

And Rochdale is enirely blocked. That service has been sat at (or near) Smithy Bridge for 50 mins.

This has shown as gone into the bay on platform 2. I do wonder when that was last used?



This is sat on the through Manchester bound platform 3.


Don't know if there's bi-directional signaling to go Manchester bound on platform 1. I'm sure someone on here will know!
 

The Mercian

Member
Joined
9 Apr 2024
Messages
155
Location
Henbury, Macclesfield
Having previously worked in Facilities Management, incidents like this massively trigger me. I can regale people with numerous tales of poorly designed power failure systems and processes, poorly maintained UPS and generator systems and power system interlocks that haven’t ever been tested in anger. I’m just thinking of some poor maintenance tech, the FM and his mates at the moment trying to get a stable power supply back on whilst the world and his wife are shouting down the telephone at them.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,662
Location
West Riding
We were travelling to Sheffield, originally from Oxford Rd, and took the decision to walk to Piccadilly despite being told "it'd be no better". For once the Gods were smiling on us and we just had time to get on the 14.48 stopper because it left 36min late ! This goes via Romiley not Stockport and actually gained 3 minutes on its journey, arriving Sheff at 16.38. I expected it to be packed, as did the guard, but it wasn't, which was very surprising. In my view a lot of passengers at Piccadilly made the wrong decision......
I arrived Man Oxford Road at about 1445, so probably passed you somewhere. Unfortunately, I was too encumbered with work equipment to easily walk to Piccadilly, although I could see on Traksy that that was probably the best place to be. After waiting a while I got a taxi to my local station in West Yorkshire to pick up my car and have just got home now.
 

Justin Smith

Established Member
Joined
14 Nov 2009
Messages
1,415
Location
Sheffield
I arrived Man Oxford Road at about 1445, so probably passed you somewhere. Unfortunately, I was too encumbered with work equipment to easily walk to Piccadilly, although I could see on Traksy that that was probably the best place to be. After waiting a while I got a taxi to my local station in West Yorkshire to pick up my car and have just got home now.
How much did the taxi cost ? ! ?
 

Ballyheigue

Member
Joined
11 Sep 2025
Messages
313
Location
Leeds
Daft question coming up, I'm planning on going to the Lake District from Leeds via Lancaster tomorrow, because trains and crews are all over the place with this disruption, is it likely to affect my journey at 10am tomorrow or are crews who do the Bentham line trains not affected?
 