I travelled from Glasgow to Stranraer and back last Saturday and couldn't help noticing the posters advertising the three week closure of the Girvan-Stranraer section for engineering works from next Saturday 8th August. Replacement buses will be in operation during this period for (long-overdue) track replacement and viaduct & tunnel repairs.

I don't have any inside information - so this is purely speculative - but on arrival at Stranraer, there was ample evidence that a major rationalisation will be taking place at the terminus. There were large stacks of new concrete sleepers and a large pile of new ballast in the former lorry park at the landward end of the pier....and the numerous painted markings on the track and paintwork at the station throat would seem to indicate that the signalbox and signalling - which have been rarely switched-in since the ferries moved to Cairnryan in 2011 - are to be abolished and removed, with just a single line running into and out of platform 1.

This would be very logical as it would pave the way for the construction of a new single platform station at the landward end of the pier....which would enable shortening of the line and removal of the rapidly-deteriorating pier in the not-to-distant future.

A local staff member also told me that they thought that the remote Glenwhilly signalbox and passing loop were also to be abolished. This would be ironic, as the box has recently had its unique semaphore up distant signal replaced by a brand new colour light.

Does anyone have any definite information?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LukeG

New Member
Joined
1 Oct 2023
Messages
1
Location
Eastriggs
I am on the South West of Scotland Transport Partnership board. We had a presentation from Network rail on the new station designs. One of the proposals was to keep a single track running half way up the pier that could be used for charter trains. The new station would still sit on the pier just much further down however there are 3 proposals for exactly where it would be. This is proposed to happen in 3 years when the line is resignalled. I don't remember anything being said suggesting that the whole pier would be demolished I think this would be up to Stena line however as they own large parts of it.
 

Farigiraf

Established Member
Joined
23 Jul 2023
Messages
1,231
Location
Bridge on the River Cam
A local staff member also told me that they thought that the remote Glenwhilly signalbox and passing loop were also to be abolished. This would be ironic, as the box has recently had its unique semaphore up distant signal replaced by a brand new colour light.
How much does this impact future growth potential?
I get that the line is not exactly a money-spinner, but if Stranraer gets a more usefully located station, and the rolling stock is also replaced by something more comfortable, then having the potential to upgrade from the current 5tpd to an even 2-hourly pattern would make sense if you want to increase rail usage, but may not be possible without the Glenwhilly passing loop.
 

TransportHub

Member
Joined
20 May 2015
Messages
178
Location
London
How much does this impact future growth potential?
I get that the line is not exactly a money-spinner, but if Stranraer gets a more usefully located station, and the rolling stock is also replaced by something more comfortable, then having the potential to upgrade from the current 5tpd to an even 2-hourly pattern would make sense if you want to increase rail usage, but may not be possible without the Glenwhilly passing loop.
It's 34mins Stranraer to Barhill, so a 2hourly service would be possible without the Glenwhilly loop
 

Farigiraf

Established Member
Joined
23 Jul 2023
Messages
1,231
Location
Bridge on the River Cam
It's 34mins Stranraer to Barhill, so a 2hourly service would be possible without the Glenwhilly loop
That's great, but then the question is why hasn't it been done yet? (I think I know the answer already)
Nonetheless that'd make for a great quick-win for ScotRail once the station's relocated.

Of course, hourly would still not be possible without the Glenwhilly loop, but given the fairly long journey times and competition by Citylink, I think the chance of that happening is about as high as the chance of the Port Road railway reopening - particularly so since the ferries moved to Cairnryan, which is more or less impossible to serve by rail.

This is already rather far from the topic of the upcoming engineering works though - Stranraer essentially is just one of those towns that are quite difficult to serve well (and affordably) due to the highly isolated nature of the place from the rest of the transport network. Good to see that it isn't being left to rot like some in other countries are though.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,507
Location
Moorpark, CA
I am on the South West of Scotland Transport Partnership board. We had a presentation from Network rail on the new station designs. One of the proposals was to keep a single track running half way up the pier that could be used for charter trains. The new station would still sit on the pier just much further down however there are 3 proposals for exactly where it would be. This is proposed to happen in 3 years when the line is resignalled. I don't remember anything being said suggesting that the whole pier would be demolished I think this would be up to Stena line however as they own large parts of it.
I have a recollection of reading that there’s a large diesel tank under the pier which makes any alterations/demolition challenging. Hadn’t heard anything about the Glenwhilly distant (last operational semaphore distant on NR in Scotland) being replaced.

Glenwhilly loop was out of action for several months a couple of years back due to damaged points and difficulty in getting replacement parts, and the service continued pretty much as normal.

== Doublepost prevention - post automatically merged: ==

Just to follow up on this, I am advised from people in the know that there is no plan to close Stranraer box as part of these works. As to Glenwhilly‘s semaphore distant, it still exists and there are no plans do do anything, given that Glenwhilly box has something of a “finite lifespan“: indeed, it was pointed out to me that if NR was forced to do something, it would be a reflectorised distant board.
 
Last edited:

D6130

Established Member
Joined
12 Jan 2021
Messages
9,147
Location
West Yorkshire/Tuscany
As to Glenwhilly‘s semaphore distant, it still exists and there are no plans do do anything, given that Glenwhilly box has something of a “finite lifespan
Ah....I must have been looking at the wrong direction distant signal! Is it true that Glenwhilly box is due for closure in the near future?
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,507
Location
Moorpark, CA
Ah....I must have been looking at the wrong direction distant signal! Is it true that Glenwhilly box is due for closure in the near future?
I‘m told that all sorts of ideas are being looked at including possible freight facilities at Girvan and the old Stranraer Town site. I would imagine that things will become much clearer once the Stranraer station situation is decided.
 

d9009alycidon

Member
Joined
22 Jun 2011
Messages
985
Location
Eaglesham
Pictures appearing today on Facebook showing that all signals and points have been disconnected, what's left beyond Dunragit now effectively a long siding.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,507
Location
Moorpark, CA
Pictures appearing today on Facebook showing that all signals and points have been disconnected, what's left beyond Dunragit now effectively a long siding.
It looks like they’ve, to all intents and purposes, closed the box. The plan I saw a couple of weeks back shows south of Girvan becoming a long single line with a small new box at Stranraer, new station near the A77 bridge and part of the Harbour station staying so that you could stick a train in there and run a second train from Girvan.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,595
Location
Taunton or Kent
There's an article in the latest RAIL edition reporting Network Rail are planning rationalisation work that would remove all passing loops and signalling/token infrastructure from Girvan-Stranraer, creating a 38-mile single track section. They cite the ageing unreliable infrastructure and journey time reductions that would be possible by removing the token exchanges.
 

Avenger20

Member
Joined
8 Aug 2011
Messages
287
There's an article in the latest RAIL edition reporting Network Rail are planning rationalisation work that would remove all passing loops and signalling/token infrastructure from Girvan-Stranraer, creating a 38-mile single track section. They cite the ageing unreliable infrastructure and journey time reductions that would be possible by removing the token exchanges.
Does that include the passing loop and therefore second platform at Barrhill?
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,507
Location
Moorpark, CA
Does that include the passing loop and therefore second platform at Barrhill?
Would go. Girvan-Stranraer would be the token section and would become the longest “traditional“ block section of any type on NR. There’s some irony in that we were trying to get money to replace the tablet instruments with key token some 35 years ago!

On a related note, Stranraer Harbour box still “technically exists” and could be switched in, albeit minus any signals, to allow two trains into Stranraer.
 

Avenger20

Member
Joined
8 Aug 2011
Messages
287
Seems a bit short sighted to have such a long section with no passing ability and offers no contingency when things go wrong. I can see why removal of Dunragit and Glenwhilly should be progressed but Barrhill should remain for contingency purposes.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,595
Location
Taunton or Kent
Seems a bit short sighted to have such a long section with no passing ability and offers no contingency when things go wrong. I can see why removal of Dunragit and Glenwhilly should be progressed but Barrhill should remain for contingency purposes.
If the station re-siting proposal goes ahead, maybe worth considering having two platforms there for resilience (and possibly also allowing railtours to visit the line at the same time as the regular timetable); if done by island there's no need for any footbridge.
 

Farigiraf

Established Member
Joined
23 Jul 2023
Messages
1,231
Location
Bridge on the River Cam
Seems a bit short sighted to have such a long section with no passing ability and offers no contingency when things go wrong. I can see why removal of Dunragit and Glenwhilly should be progressed but Barrhill should remain for contingency purposes.
Being a bit less optimistic than I was 2 months ago (post #3), chances are that this is step 2 of a stealth closure process, step 1 being the low train frequency. There are probably no immediate plans to close the line but it's pretty clear that it's seen as a liability rather than a growth corridor. The line is a money pit for ScotRail and, since Stena's relocation to Cairnryan, only serves a struggling town of under 10,000 people with a station that isn't convenient for most of the town. The bus is generally faster, more frequent, cheaper and more direct than the train, ticking all the boxes.

I still think it has potential but if ScotRail isn't prepared to commit the funding to making it a useful train service then I agree that there's not much reason to keep such a basket case afloat, other than the hope of a future Transport Scotland leadership perhaps changing their mind. Plus that it'd set a precedent to start closing lines, which is a Pandora's box in itself.

Though the proposed relocation of Stranraer station does give mixed messages - you propose investing £5M in the line to make it somewhat useful (more if you want a proper urban redevelopment & bus interchange), then remove any realistic way of increasing the service frequency and relability by singling the whole thing! Do they plan to fund the new station with the rationalisation savings (incredibly short-sighted but wouldn't be surprising) or are there two different teams at TS/ScotRail dealing with the GSW Stranraer line's future with no communication between them?

Does Stena still own the station, 15 years after abandoning it?
 

50010 Monarch

Member
Joined
30 May 2010
Messages
90
Would go. Girvan-Stranraer would be the token section and would become the longest “traditional“ block section of any type on NR. There’s some irony in that we were trying to get money to replace the tablet instruments with key token some 35 years ago!

On a related note, Stranraer Harbour box still “technically exists” and could be switched in, albeit minus any signals, to allow two trains into Stranraer.

Is Stranraer station capable of handling two trains at once? I thought all the points had been disconnected leaving just a single line in and out. Happy to be corrected!
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,900
Location
"Marston Vale mafia"
That's great, but then the question is why hasn't it been done yet? (I think I know the answer already)

Because it costs money?

Another example of such is the Ormskirk-Preston branch, where trains don't routinely pass at Rufford any more and haven't for years (outside of maybe Grand National charters?), but removing the loop and automating the crossing would cost money.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,626
Location
Torbay
Would go. Girvan-Stranraer would be the token section and would become the longest “traditional“ block section of any type on NR. There’s some irony in that we were trying to get money to replace the tablet instruments with key token some 35 years ago!

On a related note, Stranraer Harbour box still “technically exists” and could be switched in, albeit minus any signals, to allow two trains into Stranraer.
So, a covered ground frame with remote token instrument for shutting in stock for a peak extra or a special working. You'd only need one turnout acting as a trap to protect the regular service in the new single line platform, released by the token. Other points in the existing station layout might be converted to hand lever operation for run-round.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,900
Location
"Marston Vale mafia"
Why would Network Rail or ScotRail/Scottish government pay for an extra platform for railtours?

This seems very fanciful.

The cheapest way to deal with that issue is to offer the railtour operator one of the regular passenger slots on that day on the condition that they carry the one passenger (if present) and their dog and bicycle on that section free of charge.

It's not like there's much in Stranraer to want to spend very long there. The thing of interest is probably just the obscurity of the line.
 

RGM654

Member
Joined
19 Jul 2022
Messages
249
Location
Harrow
Probably neither this line nor the Port Road from Dumfries would ever have been built in the first place if not for the ferries (and briefly the prospect of ferries to/from Portpatrick as well). Since the remaining ferry service transferred to Cairnryan, apparently without any convenient connection from the railway, the justification for the line's continuing existence has been weak. Might there be a case for a permanent rail-replacement bus service?
 

Sealink

Member
Joined
16 Aug 2006
Messages
892
Location
Bridport
What are the reasons for not re-opening the line near to the old Stranraer Town Station? (At Station Street - the line going further into Stranraer seems unusable, requiring level crossings etc.)

I have just taken a screenshot from Google Maps and I may have answered my own question as it seems a tad further from the town centre, than nearer Cairnryan Road which I assume is the option being considered.


Screenshot 2026-10-12 142903.png
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,052
Location
Up the creek
Two not-utterly-diabolically-costly possibiliities:

- Move the platform down to by the Cairnryan Road bridge, put a catch point worked from a token released ground frame just beyond it (on the side away from the water, please), as it looks like there is still enough width inside the railway fence add a run around to the stabling siding beyond the catch point. Only worthwhile if they keep token/staff working south of Girvan: if they go to One Train Working the line is probably stuffed.

- Build a new platform and a stabling siding at the old Town station, connect it at the old Stranraer Harbour Junction and abandon the line down to the Harbour. Possibility only worthwhile if the old station area belongs to the railway or some other actor that won’t charge the earth for it.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,900
Location
"Marston Vale mafia"
What are the reasons for not re-opening the line to the old Stranraer Town Station?
I have just taken a screenshot from Google Maps and I may have answered my own question as it seems a tad further from the town centre, than nearer Cairnryan Road which I assume is the option being considered.

Cheaper just to cut it back to the start of the pier, and there seems to be plenty of land around there for a car park.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,626
Location
Torbay
Being a bit less optimistic than I was 2 months ago (post #3), chances are that this is step 2 of a stealth closure process, step 1 being the low train frequency. There are probably no immediate plans to close the line but it's pretty clear that it's seen as a liability rather than a growth corridor. The line is a money pit for ScotRail and, since Stena's relocation to Cairnryan, only serves a struggling town of under 10,000 people with a station that isn't convenient for most of the town. The bus is generally faster, more frequent, cheaper and more direct than the train, ticking all the boxes.

I still think it has potential but if ScotRail isn't prepared to commit the funding to making it a useful train service then I agree that there's not much reason to keep such a basket case afloat, other than the hope of a future Transport Scotland leadership perhaps changing their mind. Plus that it'd set a precedent to start closing lines, which is a Pandora's box in itself.

Though the proposed relocation of Stranraer station does give mixed messages - you propose investing £5M in the line to make it somewhat useful (more if you want a proper urban redevelopment & bus interchange), then remove any realistic way of increasing the service frequency and relability by singling the whole thing! Do they plan to fund the new station with the rationalisation savings (incredibly short-sighted but wouldn't be surprising) or are there two different teams at TS/ScotRail dealing with the GSW Stranraer line's future with no communication between them?

Does Stena still own the station, 15 years after abandoning it?
Running more trains than today could occur with the new long single line layout if desired. It could support trains at two-hourly intervals all day, but that would leave no space for additional special workings, like many single track branches.

For any further growth, a new longer, faster, and more dynamic loop might be planned somewhere around Glenwhilly as part of a subsequent conversion from ET to TCB using axle counters.
 

Flying_Turtle

Member
Joined
4 Apr 2016
Messages
200
Especially nowadays, maintaining a railway service, in a remote area goes well beyond the mere economic profitability aspect.
In terms of planning it makes absolutely no sense removing the railway from Stranraer (and we have been there many moons ago).
While the bus might be faster, the railway has far more greater power in maintaining Stranraer integrated in the Scottish urban system due to its visibility. If you remove the railway from Stranraer it will the end of the Town.
What should be done is,at the very least, is to relocate the station nearer to the Town and modernize the signalling to lower manpower costs.
The rest is just a cost of having people living somewhere rather remote.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,626
Location
Torbay
Cheaper just to cut it back to the start of the pier, and there seems to be plenty of land around there for a car park.
A sea of tarmac I recall. And plenty of room for a bus interchange and taxi rank.

I recall a masterplan for the port redevelopment which moved the station to create a more convenient transport hub and created a new station square around such facilities. Perhaps a basic new platform in the planned location could help kickstart such development, with rail buildings and facilities upgraded later in conjunction with development partners.
 

Bill57p9

Member
Joined
1 Dec 2019
Messages
908
Location
Ayrshire
Why would Network Rail or ScotRail/Scottish government pay for an extra platform for railtours?

This seems very fanciful.
In theory Stranraer still retains a platform 2, though I have no idea when it was last used. It does include a run round loop, so maybe the answer could be removing some rather than all of the current station as somewhere a special train could stable & run round.

The track measurement train does occasionally visit Stranraer and an autumnal daily RHTT used to run as far as Barrhill (but I can't see it now). Whilst I understand the need to reduce the operating costs of the line a single block section from Girvan does sound somewhat short sighted and terminal for flexibility.

For what it's worth, passenger service trains do currently pass at Barrhill once per week: Sundays at 2015.

Dunragit box also operates the local level crossing.
 