Loadhaul60059
Member
Have the Lynemouth to Tyne Coal Terminal (and reverse) workings ceased? Neither service appears to have run yesterday or today.
Tyne Dock has been temporarily closed after the collapse of a dock side crane on Sunday. Probably connected.Have the Lynemouth to Tyne Coal Terminal (and reverse) workings ceased? Neither service appears to have run yesterday or today.
Tyne Dock has been temporarily closed after the collapse of a dock side crane on Sunday. Probably connected.
Tyne Dock has been temporarily closed after the collapse of a dock side crane on Sunday. Probably connected.
Thanks for the responses. Will keep an eye out for it later!The Lynemouth biomass trains are back on the Northumberland Line today so whatever issue there is must have been resolved.
6E89 taking wagons for storage from Fiddlers Ferry PS to Gascogine WoodHigh speed freight?...
![]()
40K views · 661 reactions | Always good to see unusual traction at Sheffield Station! The team caught this today - a couple of Class 43 power cars working together to haul freight for Rail Adventure! Good catch, guys! Rails of Sheffield Store, Rail
Always good to see unusual traction at Sheffield Station! The team caught this today - a couple of Class 43 power cars working together to haul freight for Rail Adventure! Good catch, guys! Rails...www.facebook.com
Couple of HST power cars (incl. 43423) hauling (empty?) wagons through Sheffield Midland earlier today (23/07/26).
What was the train headcode and has this run before?....
Has to be the weirdest train I've ever seen! Two down at heel HST power cars and a train of rusty old wagons, passed me doing about 20mph this morning.6E89 taking wagons for storage from Fiddlers Ferry PS to Gascogine Wood
Nothing has run to or from "Tilbury 2" (which usually sees two daily departures to Daventry)
for the past two weeks.
The 4M77/4L48 and 4M07/4L27 services are still running, but have been diverted to run to/from
"Seabrook reception sidings" at Tilbury Docks.
I always get confused between Tilbury LCT, Tilbury RCT and Seabrook sidings, but I thought the
latter was just a set of run round roads where trains reverse to get to Tilbury Docks 'proper',
so I presume that the DRS trains are not actually being loaded there?
Anyone know what is going on with these DRS workings and why Tilbury 2 is out of use?
At Tilbury, the Rail Container Terminal (RCT) is adjacent to the main line and is operated by Freightliners, whereas the mini-terminal is situated at the end of a short privately-owned branch and is reserved exclusively for OCL and ACT traffic. (Freight Only Volume 2: Southern and Central England, Rhodes & Shannon, 1988)
Like Thamesport, I think Tilbury lost most of its deep sea traffic after London Gateway opened in 2013, leading to the closure of Tilbury Rail Container Terminal operated by Freightliner. Part of the former Tilbury RCT is now used as the "bulk siding" to load recycled glass "cullet" (resembling sand) for URM heading to Ince & Elton, plus a Freightliner-hauled aggregate service for FM Conway at Theale. There's also a separate Tarmac "CMAT" aggregate terminal over at Tilbury 2 which currently receives stone from Mountsorrel, but has also been used to load imported stone for East Anglian destinations. The exchange sidings at the former Tilbury RCT are also used to access London Container Terminal, further down the branch on the dockside. There is also the Maritime Railport here, where tinplate coils from Trostre are transferred from train to ship for onward movement to European destinations.
66621 in Tilbury bulk siding (not the LCT as per caption) loading aggregate for FM Conway in 2021:
https://www.flickr.com/photos/world_railways/51270543305/ (Photo: David Smith)
66792 in Maritime Tilbury Railport / London Container Terminal (containers and tinplate are offloaded in the same place) with a tinplate train from Trostre in 2021:
https://www.flickr.com/photos/139865875@N07/51834559902/ (Photo: 37408)
This 2-page PDF has a handy map of the track layout in Tilbury Docks (zoom in to see it better):
https://www.londoncontainerterminal...23/12/ForthPorts_Rail-Insert-2023-Eden-v1.pdf
And this webpage has more info on London Container Terminal itself:
https://www.londoncontainerterminal.com/terminal-details/
A long time since a freight has used the Barnsley branch.Has to be the weirdest train I've ever seen! Two down at heel HST power cars and a train of rusty old wagons, passed me doing about 20mph this morning.
That prompted me to see if there had been any more recent mention of the Paris Valenton - Daventry service that, supposedly, was originally going to start last year, but has so far produced nothing
Gallo went on to highlight the “considerable uncertainty” amongst shippers, linked both to the oil crisis, the European economic slowdown and to the war in Ukraine. “The prevailing attitude is one of ‘wait and see’ and is weighing on the launch of new services”, he said.
This has led DB Cargo France to postpone the launch of its proposed France-UK combi service, linking Paris-Valenton and Daventry, (in Northamptonshire, England), as the required volume commitments have not materialised.
On the other hand, the combined transport operators that DB Cargo France is working with are seeing their trains running at high capacity, no doubt due to the high price of diesel, Gallo noted. “It’s a pity this is not translating into additional services.”
Thanks.Shoreham is a long-standing wharf (as is Portsmouth), no rail connections.
the sites will support the increased use of rail and marine transport, helping to move materials more efficiently and sustainably by reducing the number of journeys made by road.

A centuary ago Shoreham (Aldrington Basin) had a rail connection with the LBSCRThanks.
So when they say
what it actually means is the chichester site might support increased use of rail and the shoreham one will only support increased marine transport. Presumably increased use of Shoreham for marine transport would actually mean an increase of road journeys if that's the only way it's connected.
Ties in nicely with the observation that most of the containers on 4E76 Mossend PDS to Rotherham Masborough on 13/7/26 were Hapag Lloyd ones, and a probable Felixstowe link (see my post #2609).Hapag Lloyd expands UK Rail offering with the launch of their netw intermodal rail service delivered in partnership with Newell & Wright, DB Cargo UK, & PD Stirling connecting Southampton, London Gateway and Felixstowe with Bellshill, Scotland. The service will operate three days a week and looks very similar to the concept launched a few weeks ago by Meditterranean Shipping Company from Felixstowe and London Gateway Port to Scotland.
View attachment 208463
BBC report on the collapse which is believed to happened as a result of a collision with another ship.Thanks for the responses. Will keep an eye out for it later!
I was a bit confused why the DRS Tilbury 2 schedules had suddenly switched to Seabrook sidings, but apparently there is an issue with the track on the connection to Tilbury 2. It's described as "track movement / buckling" - with movements in and out of Tilbury 2 stopped until further notice - so is likely related to the recent hot weather. Been ongoing for a couple of weeks now...
Does anyone know if the clay trains going to Par Harbour has now stopped? And St Blazeys yard now closing?
Increased service from Treviscoe has been mentionedThanks for the update, will there be a reduction in movements from Imerys or is it being transported via Fowey Dock instead?
Well, in general terms, stone terminals mean a feed in by rail from (e.g. the Mendips, Peak District, Yorkshire Dales..., keeping large HGV articulated tippers off main roads over long distances but then a lot of local moves by lorries to local building sites and merchants around Chichester, Cricklewood, West Drayton and so forth. There are a few large scale exceptions for projects such as HS2 or Sizewell where there is a railhead effectively 'on site' at, say, Willesden or Leiston, perhaps linked by haul roads or conveyors not involving public highways.Thanks.
So when they say
what it actually means is the chichester site might support increased use of rail and the shoreham one will only support increased marine transport. Presumably increased use of Shoreham for marine transport would actually mean an increase of road journeys if that's the only way it's connected.
I could see Shoreham supplying a flow to London like Newhaven does, although the chances of getting a rail connected siding to the port are vanishingly small, and the chances of paths on the BML wouldn't be any better.Well, in general terms, stone terminals mean a feed in by rail from (e.g.0 the Mendips, Peak District, Yorkshire Dales..., keeping large HGV articulated tippers off main roads over long distances but then a lot of local moves by lorries to local building sites a merchants around Chichester, Cricklewood, West Drayton and so forth. There are a few large scale exceptions for projects such as HS2 or Sizewell where there is a railhead effectively 'on site' at, say, Willesden or Leiston, perhaps linked by haul roads or conveyors not involving public highways.
A sea-fed coastal terminal for sea-dredged, coastwise or imported material will similarly tend to rely on local road distribution although there may be a second leg semi-trunk haul by rail such as from Newhaven or Grain to inland terminals for final road delivery.
Yes I see. If it's for local distribution then it makes sense.A sea-fed coastal terminal for sea-dredged, coastwise or imported material will similarly tend to rely on local road distribution although there may be a second leg semi-trunk haul by rail such as from Newhaven or Grain to inland terminals for final road delivery.
What makes you say that? Existing freight services are very infrequent so I assume whatever hourly path exists isn’t brilliantly used as it stands.and the chances of paths on the BML wouldn't be any better.
Because I've previously done a timed freight study on the BML as a Network Rail timetable planner. Service patterns have changed in the meantime but the fundamental capacity constraints won't have.What makes you say that? Existing freight services are very infrequent
If you're going to say this, may I ask what your level of experience is working with the Working Timetable, Timetable Planning, and Strategic Capacity?I’m a bit tired of the paths issue being brought up in situations where I struggle to see how it’s a problem, just because ‘it’s the BML’. The BML has a pretty consistent off-peak timetable, with room for freights, and not much freight actually runs as is.
I could see Shoreham supplying a flow to London like Newhaven does, although the chances of getting a rail connected siding to the port are vanishingly small, and the chances of paths on the BML wouldn't be any better.
Chichester seems to fit the first pattern, with a daily loaded train from Merehead/Westbury and an empty back.