Perhaps we curtail the Victoria-Gravesend to Dartford instead like they did in 2022?
They did briefly have a CST-Blackheath-Woolwich-Gravesend service but that was gone by the Dec 2023 change for reasons unknown.
See, this is why the current service beyond Dartford as a whole is inadequate. The current state of TL services on the Woolwich line as the only way to get from Dartford to say, Gillingham, is poor - for example, the summer trains to and from Rainham have been cut to just one train per hour, and whenever the core falls on itself, the Rainham services are usually the first to get cancelled. And it's not like the service is useless either - lots of people live in the Medways and Dartford, plus Greenhithe serves Bluewater. Cramming everyone on a Javelin at Gravesend isn't the solution.
Yes All points on the Woolwich line are popular with those in Medway and Gravesend for the TfL interchanges, the fact that at the moment Medway has only 1tph to this line is ridiculous.
Yes HS1 is good but also at premium.
The cutting back of the service to Kentish Town from Luton might be a sign that the gig is up for this ill-thought service - services on this line ran much better under Southeastern
Agreed, I reckon we’re about 3-5 timetable changes away from being done with Thameslink on the line, and I can’t see SE keeping this as an all stopper from Medway to Slade Green either, the added stops happened to space out timings through the core, with Thameslink gone there’s no need to consider this anymore.
Agree with everything - except that this should probably be to Cannon St (unless it runs via Blackheath, in which case, Charing Cross works) - but everything via Greenwich should go to Cannon St
If ran via Blackheath then it should be to Victoria, CHX hasn’t any space I don’t think, as much as I’d like CHX trains returning to the Woolwich line, but you’d be linking linking several corridors that are 2tph: Vic-Lew, Lew-Charlton, then Gravesend-Medway with Charlton-Gravesend being the essential core flow with 6tph CST-Slade Green and 6tph Dartford-Gravesend.
Might be an unpopular opinion but all beyond Dartford trains would run via Woolwich, Lewisham and Greenwich, with Bexleyheath and Sidcups being the Dartfords and rounders only, Sidcup would have all day rounders to connect with the EL, since the Bexleyheath line does have more feeder buses to Abbey Wood and Woolwich for the EL/DLR connections
CST-Gravesend would be 4tph all stops
Vic-Medway would be 2tph semi fast particularly beyond Abbey Wood
complete outlier in the face of all the untangling done.
The Medway is the outlier, Charlton-Blackheath will never be more than 2tph, Medway-Gravesend has the HS1 and Victoria top ups, its far better to isolate this from the more metro focused Sidcup, Bexleyheath and Greenwich lines which should be 6tph.
Ideally there would be more - also so that the Greenwich route had 8tph
I wonder if perhaps the Greenwich line could go 7tph? An hourly shuttle between CST (or maybe Blackfriars to keep the Thameslink connection up?) to Plumstead, could it be done? Plumstead-Charlton would then be 9tph