It is getting increasingly frustrating to travel with a disabled person at the moment. Some of the stations I am going to highlight below are fairly new so the problem is purely financial as at design stage it was chosen to only have a single. Lift. Journey Welwyn Garden City - London Bridge.
1. Finsbury Park. No lift from platform 1 / 2. Solution detour to Kings Cross not an issue in this case was only changing trains here.
2. St Pancras. No access at all for disabled people. Frequent issue although on my last complaint to GTR they say I am just unlucky as the only times the list has failed in last 6 months were the time Mrs Unit was with me. Other passengers needed to change at Finsbury Park taking train from Kings Cross.
3 Blackfriars. No access on Southbank to platform 2. Solution use northbank lifts.
4. No access to Thameslink platforms. Solution use Blackfriars. Again I could be unlucky but this is a common failure. last time we needed to use the tube which want fun either.
London bridge and St Pancras are awful. Does network rail have availability statistics and is there anything that can help encourage disabled passengers travel. Things are better. However train designers don’t work with real wheelchairs users, otherwise they wouldn’t have put the pole right in the turning area of the wheelchair on the class 700.
1. Finsbury Park. No lift from platform 1 / 2. Solution detour to Kings Cross not an issue in this case was only changing trains here.
2. St Pancras. No access at all for disabled people. Frequent issue although on my last complaint to GTR they say I am just unlucky as the only times the list has failed in last 6 months were the time Mrs Unit was with me. Other passengers needed to change at Finsbury Park taking train from Kings Cross.
3 Blackfriars. No access on Southbank to platform 2. Solution use northbank lifts.
4. No access to Thameslink platforms. Solution use Blackfriars. Again I could be unlucky but this is a common failure. last time we needed to use the tube which want fun either.
London bridge and St Pancras are awful. Does network rail have availability statistics and is there anything that can help encourage disabled passengers travel. Things are better. However train designers don’t work with real wheelchairs users, otherwise they wouldn’t have put the pole right in the turning area of the wheelchair on the class 700.