• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Next priority project - re-doubling of SW mainline.

devon_belle

Member
Joined
21 Jul 2022
Messages
642
Location
Surrey
Do you mean East of Pinhoe so that trains from Exeter can still run to there?
Exeter is west of Pinhoe. I mean so that a train can terminate from the west in Pinhoe up platform and return without shunting onto the single track.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
Exeter is west of Pinhoe. I mean so that a train can terminate from the west in Pinhoe up platform and return without shunting onto the single track.
Thanks, that is clearer now. I must get an atlas which shows single and double track differently!
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,524
Location
Wales
But if this is disruption meaning trains have to terminate at Pinhoe, why would that matter?
In which case unless you have suitable signalling to turn back without entering the section you may need a pilot to work to the point of obstruction.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
My own view is that the landscape has changed since the 1970's when many of the local services were axed, RE-doubling, and upgrading the WEML, would add more flexibility to the line operationally, and would, again IMHO, enable better level of service if the line speed can also be raised.

For the record, Whilst this was not directed towards me, i think that full reopening of the closed route, as both a community, devon metro, and as an alternative for communities along the closed route, to enable the choice if people want to use the train, rather than the car, should be applauded.

If the line speed throughout, was compatible to the exsisting line speeds between Plymouth and London, then surely having an alternative route, for when sometthing closes , or disrupts the exsisting line makes operational sence.
It’s doubtful the line speed would ever be raised enough to be similar to the existing GW route, and closed lines rarely get opened on the basis of potential diversionary use. Remember the Dawlish sea wall problem is deemed fixed with a life of approaching 100 years.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,244
Location
Yorks
It’s doubtful the line speed would ever be raised enough to be similar to the existing GW route, and closed lines rarely get opened on the basis of potential diversionary use. Remember the Dawlish sea wall problem is deemed fixed with a life of approaching 100 years.

As I've pointed out on many occasions, the diversionary capacity is only a cherry on the Bakewell. Connecting towns and opening up new hinterlands to rail is the main Bakewell.

Also, an additional route can give passengers more options even where not a single train is diverted.
 

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,489
Location
London
A couple of years of traffic disruption and millions of pounds... In this case I would settle for a short length of singled or gauntletted track.
What's the advantage of gauntlet track over single track? Does it avoid having points?
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,209
Location
Oxford
What's the advantage of gauntlet track over single track? Does it avoid having points?
Yes, it still has the common crossing (or whatever the correct term is), but there are no moving parts, so less of a maintenance liability.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,244
Location
Yorks
Yes, it still has the common crossing (or whatever the correct term is), but there are no moving parts, so less of a maintenance liability.

I'd never considered that before. I wonder why they went for single track sections on the Hastings line rather than gauntlets (although the single track sections offer reversing opportunities).
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,209
Location
Oxford
I'd never considered that before. I wonder why they went for single track sections on the Hastings line rather than gauntlets (although the single track sections offer reversing opportunities).
You'd need a 3rd rail on both sides to get alignment with the shoes. Which is quite a hazard.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,628
Yes, it still has the common crossing (or whatever the correct term is), but there are no moving parts, so less of a maintenance liability.
Saves you S&C, but still needs the signalling to protect it and would still have to be timetabled as a single line.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,379
Location
Taunton or Kent
Does gauntlet track exist on any mainline in the UK? I know the Croydon tramlink has a section of it, but if it doesn't exist on the mainline, a whole new set of safety standards and procedures will be required.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,209
Location
Oxford
Does gauntlet track exist on any mainline in the UK? I know the Croydon tramlink has a section of it, but if it doesn't exist on the mainline, a whole new set of safety standards and procedures will be required.
There was some at Selby I believe, but don't there there's any now. Probably too non standard to actually get built somewhere like Exeter, really.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,244
Location
Yorks
There was some at Selby I believe, but don't there there's any now. Probably too non standard to actually get built somewhere like Exeter, really.

Bern through Selby on many occasions. Never seen it.
 

marshlinker

Member
Joined
18 May 2026
Messages
143
Location
Romney Marsh
You'd need a 3rd rail on both sides to get alignment with the shoes. Which is quite a hazard.
Whilst that is obviously so, I doubt it was the driver. Mountfield Tunnel was singled in 1974 well before electrification and when the DEMUs were only 15 years old.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
I'd never considered that before. I wonder why they went for single track sections on the Hastings line rather than gauntlets (although the single track sections offer reversing opportunities).
agreed, points into single line sections would allow reversing - if the signalling allowed it - see the posts about Pinhoe up-thread...
You'd need a 3rd rail on both sides to get alignment with the shoes. Which is quite a hazard.
Why a special hazard? It would be unusual but there must be other places with a conductor rail either side of the track. (But the Devon end of the SW main line hasn't got 3rd rail as far as I am aware!) You could spread the gauntlet far enough for each direction to only engage one conductor rail, assuming that it doesn't then foul one of the other running lines... I must get my crayons out to see if it might work!
Saves you S&C, but still needs the signalling to protect it and would still have to be timetabled as a single line.
Definitely would have to be signalled and timetabled as a single line, but just 2 diamond crossings (the "C" of "S&C") and no moving parts at all...
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,628
Definitely would have to be signalled and timetabled as a single line, but just 2 diamond crossings (the "C" of "S&C") and no moving parts at all...
Still needs looking after as any fixed diamond does, they aren't overly liked by asset engineers.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
Still needs looking after as any fixed diamond does, they aren't overly liked by asset engineers.
Maybe so, but that's life! (Isn't that their job?) If they can cope with sets of "points" then surely one fixed crossing each end of a gauntletted section should be welcomed by them? Tell them to be grateful that there are no switches to be looked after too...
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
Exeter St Davids to Honiton is about 28 minutes on current schedules, so you wouldn't be able to run an hourly service with a single unit. On the basis that it doesn't increase the number of diagrams, it's probably worthwhile running the extra 10 miles to Axminster and back rather than have the train sitting idle (and potentially blocking a platform) at Exeter for most of every hour.
But the proposal is to run through from Crediton, which makes Honiton an ideal turnround for a half hourly or hourly stopper.
If Axminster is busier than Honiton westbound, then that rebalances things.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,244
Location
Yorks
But the proposal is to run through from Crediton, which makes Honiton an ideal turnround for a half hourly or hourly stopper.
If Axminster is busier than Honiton westbound, then that rebalances things.

Yes, I think my re-doubling proposal should make the route more of a regional route in its own right, rather than just being the far end of the line from Waterloo.
 

sharpener

Member
Joined
4 Oct 2018
Messages
370
Why a special hazard? It would be unusual but there must be other places with a conductor rail either side of the track. (But the Devon end of the SW main line hasn't got 3rd rail as far as I am aware!) You could spread the gauntlet far enough for each direction to only engage one conductor rail, assuming that it doesn't then foul one of the other running lines... I must get my crayons out to see if it might work!
Mechanically this is not an issue. Conductor rail frequently overlaps on both side of track in S & C areas to ensure there are no gaps. The opposite directions with gauntlet track would need the conductor rails on opposite (outer) sides. Conductor rail is higher than running rails so the inside shoes would not catch on the latter so I don't see any problem.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,209
Location
Oxford
It's not usual to have long stretches with a con rail on both sides though, and then put it in a tunnel as well, with gauntlet track so on the "wrong" side it's not under the train and you've got a lot off unique risks there.

I don't know what it was like in the 80s, but that would be quite the risk assessment these days.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,379
Location
Taunton or Kent
But the proposal is to run through from Crediton, which makes Honiton an ideal turnround for a half hourly or hourly stopper.
If Axminster is busier than Honiton westbound, then that rebalances things.
Honiton is busier, but very marginally. The number of passengers from Axminster is high enough to warrant this being the turnback point if doing so doesn't lead to overcrowding into Exeter, plus this also helps cater for the flow between Axminster and Honiton. Here are the approximate flows:

Axminster: 53,500 to EXC, 11,500 to EXD and 11,209 to Honiton
Honiton: 54,600 to EXC, 17,000 to EXD
 

sharpener

Member
Joined
4 Oct 2018
Messages
370
It's not usual to have long stretches with a con rail on both sides though
I thought we were talking about short stretches of gauntlet track to save widening bridges etc. Over long distances surely the cost of the extra rails (+ 3rd rail or not) would quickly overtake that of the pointwork either end of conventional singled track. Particularly as there is no saving on the signalling.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,209
Location
Oxford
Honiton is busier, but very marginally. The number of passengers from Axminster is high enough to warrant this being the turnback point if doing so doesn't lead to overcrowding into Exeter, plus this also helps cater for the flow between Axminster and Honiton. Here are the approximate flows:

Axminster: 53,500 to EXC, 11,500 to EXD and 11,209 to Honiton
Honiton: 54,600 to EXC, 17,000 to EXD
The follow up question is whether Axminster going half hourly (or better) would increase passenger numbers enough to justify the additional unit(s) to run there. Honiton is bigger so has higher potential passenger numbers.

== Doublepost prevention - post automatically merged: ==

I thought we were talking about short stretches of gauntlet track to save widening bridges etc. Over long distances surely the cost of the extra rails (+ 3rd rail or not) would quickly overtake that of the pointwork either end of conventional singled track. Particularly as there is no saving on the signalling.
No, that discussion was about not having gauntlet track on the Hastings line, where the single sections are much longer than anywhere you'll find double con rails.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
I thought we were talking about short stretches of gauntlet track to save widening bridges etc. Over long distances surely the cost of the extra rails (+ 3rd rail or not) would quickly overtake that of the pointwork either end of conventional singled track. Particularly as there is no saving on the signalling.
but lots of savings on fitting and maintaining moving parts of points, power supplies to point motors etc., power cables to be nicked. With gauntletted track "just" the signalling stuff...
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,379
Location
Taunton or Kent
The follow up question is whether Axminster going half hourly (or better) would increase passenger numbers enough to justify the additional unit(s) to run there. Honiton is bigger so has higher potential passenger numbers.
Axminster however boasts being a railhead for Lyme Regis and Seaton, so arguably serves a larger catchment area.
 

devon_belle

Member
Joined
21 Jul 2022
Messages
642
Location
Surrey
To keep a decent line speed through the gauntlet track section, wouldn't you have to have switched frogs due to the acute angle needed? If so is it any easier than just installing normal pointwork?
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
Honiton is busier, but very marginally. The number of passengers from Axminster is high enough to warrant this being the turnback point if doing so doesn't lead to overcrowding into Exeter, plus this also helps cater for the flow between Axminster and Honiton. Here are the approximate flows:

Axminster: 53,500 to EXC, 11,500 to EXD and 11,209 to Honiton
Honiton: 54,600 to EXC, 17,000 to EXD
Thanks.
 

Top