Cambridge South new station opening

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,789
Location
East Anglia
Early days, but any comments on how widely used the station is? Does it seem like there are more people getting off in the morning than getting on?
Friend of mine who lived nearby and has used it a couple of times says he is amazed at the passenger numbers and said it has the feel of a London suburban station.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bspahh

Established Member
Joined
5 Jan 2017
Messages
2,414
Early days, but any comments on how widely used the station is? Does it seem like there are more people getting off in the morning than getting on?
In 15 minutes from 4.30pm on the hospital side, I counted 74 pedestrians, 4 cyclists and 3 people being dropped off by car.

32 pedestrians left the station in the same time.

There was also a free electric shuttle minibus, that does laps around the campus. There weren't any passengers on that.

 

mr_moo

Member
Joined
7 Sep 2009
Messages
647
Location
Cambridgeshire
Early days, but any comments on how widely used the station is? Does it seem like there are more people getting off in the morning than getting on?

I live in Shelford and have changed at Cambridge South two days on my commute into London. Busy both days - plenty of people getting off and on. Given it's only a few days in I was quite surprised but it's looking to be well used already.

Does anyone have any pictures or measurements of the gatelines (are there two)? The only pictures I have seen so far only show one gateline with three standard gates and two wide-aisle gates, which seems woefully inadequate.

As I am writing this whilst on a train to Cambridge South, I'll take some photos of the gatelines on both sides and post later.
they are designed with growth in mind and there is space to put extra barriers in in future. tickets gates are very expensive so the current gateline is a compromise between not spending too much money up front and knowing it will be busy but get busier in future. There was some good debate on how many ticket gates to provide on day 1.
 

MikeWM

Established Member
Joined
26 Mar 2010
Messages
4,930
Location
Ely
Went to have a look yesterday evening and was generally impressed, certainly has a lot more character and style than the all-grey, boxy, and rather drab Cambridge North. Pretty busy considering it was only day 3.

I do wonder whether the gateline areas will prove to be a bit too open to the elements when the weather is cooler/windier/damper. I guess we'll see in due course. Shame a ticket office wasn't provided - the info desk wasn't manned either, so the only people visibly available to answer questions were the gateline assistants on either side, who seemed to be *very* busy answering various questions.

But the only real negative is that the platform setup, stairs etc. somehow reminds me a little too much of Newport!
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,675
Location
UK
As I am writing this whilst on a train to Cambridge South, I'll take some photos of the gatelines on both sides and post later.
they are designed with growth in mind and there is space to put extra barriers in in future. tickets gates are very expensive so the current gateline is a compromise between not spending too much money up front and knowing it will be busy but get busier in future. There was some good debate on how many ticket gates to provide on day 1.
I thought Cubic discontinued these E2 gates now, so surely upgrading would be prohibitively expensive now. I still have yet to see the Trumpington side.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,675
Location
UK
Both entrances have 2 wide and 3 standard gates.
I would've expected at least 4 standard gates. I guess it depends how evenly-split the passenger flow is. We all know those gates will never see enough funding for an upgrade.
 

andy33gmail

Member
Joined
23 Mar 2025
Messages
291
Location
cambridgeshire
I passed through on the late running Kings Lynn (KLN) to Kings Cross (KGX) scheduled to pass Cambridge South at 9:38

My train was full including standing room, due to earlier cancellations, but I saw few people join/alight.

But of course, I’ve no idea how many people came on other services, as I appreciate is served from a few directions

I’m due to pass Cambridge South at 20:09, quite tempted to get off & have a look :)
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
2,414
I would've expected at least 4 standard gates. I guess it depends how evenly-split the passenger flow is. We all know those gates will never see enough funding for an upgrade.
There is space for extra gates to be installed if there is money. Apparently, the gates are really expensive to buy, so they weren't all fitted from the start. At the moment, they have some a solid metal gate which is normally kept locked.
 

andy33gmail

Member
Joined
23 Mar 2025
Messages
291
Location
cambridgeshire
There is space for extra gates to be installed if there is money. Apparently, the gates are really expensive to buy, so they weren't all fitted from the start. At the moment, they have some a solid metal gate which is normally kept locked.
Yep, some odd choices for initial capacity

Massive staircases on the “normal” bridge, more capacity than Cambridge for example

The “Train enthusiast photos taking point” bridge omits platform 1. Which I guess would be annoying if the signaller gets bored and swaps the platform on a Southbound train; especially as people who are early may well walk all the way to the end to be nearer the exit at Kings Cross
IMG_5168.jpeg

Also a weird arrangement with the non-signed areas which are clearly intended to be staff only but aren’t;

Also noticed a train Youtuber at the gateline, but I had the self control not to bother him
 

Attachments

  • IMG_5194.jpeg
    6.6 MB · Views: 143

bspahh

Established Member
Joined
5 Jan 2017
Messages
2,414
The “Train enthusiast photos taking point” bridge omits platform 1. Which I guess would be annoying if the signaller gets bored and swaps the platform on a Southbound train; especially as people who are early may well walk all the way to the end to be nearer the exit at Kings Cross
That is an emergency evacuation bridge to leave the island platform if there is a fire on the main bridge. Passengers are allowed to use it, but it's not required for platform 1 as you can leave the platform through a gate.
 

sharpener

Member
Joined
4 Oct 2018
Messages
371
That is an emergency evacuation bridge to leave the island platform if there is a fire on the main bridge. Passengers are allowed to use it, but it's not required for platform 1 as you can leave the platform through a gate.

So where is the corresponding emergency evacuation bridge at Cambridge CBG P7/P8? The island platform there is often crowded and there are commercial concessions there which are more likely to catch fire methinks. Should never have built them without the second bridge (yes I know about the listed main building).
 

WesternBiker

Member
Joined
26 Aug 2020
Messages
692
Location
South Cambridgeshire
Well done @mr_moo and the team.
I second that.

I used the station yesterday at around 16:30, and it was pretty busy. The platform indicators were still all over the place, those on platform 2 not showing the Stansted trains, for example (the 16:51 Norwich to Stansted not appearing at all) but the 16:58 Kings Cross stopper was shown for 20 minutes before its departure.

I took a few photos for my own use, which I hope may be of some interest. Good to see lots of provision for litter to keep it all neat and tidy (I don't think I have seen quite so many litter bags at a station before).

EF6C2DAE-0FA3-4675-A6FC-AD3EB3F58AC9_1_105_c.jpeg7B034292-A414-44A3-918C-F1A53882E79F_1_201_a.jpeg
 

William3000

Member
Joined
24 May 2011
Messages
593
Location
Cambridgeshire
East West Rail's plans for the eastern entrance include a new bridge at the south end of platforms 7/8.
The plans also show a further third bridge right at the northern extremity of the new station beyond the Carter Bridge. Looking at the plans - that would be the emergency bridge and the existing bridge (extended to serve platform 9), and the new one to which you refer, would be the ones generally used by passengers day to day.
 

paulmch

Member
Joined
20 Dec 2018
Messages
218
I had a blood donation at Addenbrookes yesterday so I hopped on the train from Waterbeach and I was thoroughly impressed, they've done a fantastic job!

There was a steady flow of passengers while I was there at 1340 and 1535. Amazingly one of the two nurses at my donation was completely unaware that there even was a new station there, but both remarked that the traffic on their drive to work seemed better than normal.
 

blueberry11

Member
Joined
19 Aug 2023
Messages
162
Location
Norwich
The platforms (the side ones) seem to be narrower than those at Beaulieu Park, but that's likely because Beaulieu Park has trains passing the station at 60mph while Cambridge South has all trains calling at that station. Surprised that a new station has platforms this narrow or maybe its just the camera.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
The platforms (the side ones) seem to be narrower than those at Beaulieu Park, but that's likely because Beaulieu Park has trains passing the station at 60mph while Cambridge South has all trains calling at that station. Surprised that a new station has platforms this narrow or maybe it’s just the camera.
The minimum width required for a single sided platform is 2.5m, they’ll be well over 3m, I think this is as shown in the first photo by @WesternBiker . Compare the width of P1 with the part of P2 alongside the stairs, which will also have to be at least 2.5m.
 

andy33gmail

Member
Joined
23 Mar 2025
Messages
291
Location
cambridgeshire
The platforms (the side ones) seem to be narrower than those at Beaulieu Park, but that's likely because Beaulieu Park has trains passing the station at 60mph while Cambridge South has all trains calling at that station. Surprised that a new station has platforms this narrow or maybe its just the camera.
From the platform, most of the visible speed limit signs seem to be 40 - so I can only imagine the limit is 40 or lower on the platforms themselves?

I did see a through train, which was announced as not stopping both at both platform 1 and 2
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
From the platform, most of the visible speed limit signs seem to be 40 - so I can only imagine the limit is 40 or lower on the platforms themselves?

I did see a through train, which was announced as not stopping both at both platform 1 and 2
Sectional Appendix shows 50/60mph limit (except the Up Main, which is 80mph). The drawing is a tad unclear as to where the actual changes in speed are:
1782990112041.png
 

andy33gmail

Member
Joined
23 Mar 2025
Messages
291
Location
cambridgeshire
Sectional Appendix shows 50/60mph limit (except the Up Main, which is 80mph
I stand corrected, thank you… I think

Temporary limits excepted, this seems to be advertising a 50 (not 40) limit to the South on platforms 3 & 4? - so whilst the limit might be 80 on the platform in theory…
 

Attachments

  • IMG_5172.jpeg
    6.2 MB · Views: 53

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Sectional Appendix shows 50/60mph limit (except the Up Main, which is 80mph). The drawing is a tad unclear as to where the actual changes in speed are:
View attachment 207056
A 2.5m side platform is ok up to 100 mph. Above that speed the minimum becomes 3m. Was recently discussed in the TPE thread, I’ll find a link:
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,884
Location
Cambridge, UK
I did see a through train, which was announced as not stopping both at both platform 1 and 2
I saw the same thing yesterday late afternoon (a southbound ECS train in that case) - separate announcements for both P1 and P2, even though it was signalled through P2 (the up main).

I stand corrected, thank you… I think

Temporary limits excepted, this seems to be advertising a 50 (not 40) limit to the South on platforms 3 & 4? - so whilst the limit might be 80 on the platform in theory…
AFAIK, the 50mph signs are for signalled 'wrong direction' movements for trains from the Royston direction reversing in P3 & P4, which can only access the Royston line when travelling south (which has a 50mph restriction around the curve anyway). Trains from the Shelford direction can only reverse in P1 & P2 and can only access the Shelford line. It's basically a minimal track and signalling arrangement to allow turnaround of trains from the south in the during engineering works or serious disruption further north.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Temporary limits excepted, this seems to be advertising a 50 (not 40) limit to the South on platforms 3 & 4? - so whilst the limit might be 80 on the platform in theory…
The Sectional Appendix only shows 80mph through platform 2. It shows 50mph through both Platforms 3 & 4 in the Up (Southbound) Direction and 60mph in the Down (Northbound) direction (I think, it's terribly drawn).
 

sharpener

Member
Joined
4 Oct 2018
Messages
371
AFAIK, the 50mph signs are for signalled 'wrong direction' movements for trains from the Royston direction reversing in P3 & P4, which can only access the Royston line when travelling south (which has a 50mph restriction around the curve anyway). Trains from the Shelford direction can only reverse in P1 & P2 and can only access the Shelford line. It's basically a minimal track and signalling arrangement to allow turnaround of trains from the south in the during engineering works or serious disruption further north.
It's not quite as restrictive as that. If the Traksy layout is to be believed Shepreth Branch Junction allows any physical movement except P3/P4 to the Up Liverpool Street line and v-v. Of course not all may be signalled.
 

Wandering Pom

Member
Joined
23 Mar 2024
Messages
163
Location
Cambridge
It's not quite as restrictive as that. If the Traksy layout is to be believed Shepreth Branch Junction allows any physical movement except P3/P4 to the Up Liverpool Street line and v-v. Of course not all may be signalled.
Traksy has it wrong, unfortunately: there is only one crossover at Shepreth Branch Junction, as shown on the Sectional Appendix excerpt previously posted. The junction was remodelled as part of the project; I suspect some confusion crept in at one of the intermediate stages, when the new points and crossover (further north than the old ones) had been installed but were not yet in use.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
It's not quite as restrictive as that. If the Traksy layout is to be believed Shepreth Branch Junction allows any physical movement except P3/P4 to the Up Liverpool Street line and v-v. Of course not all may be signalled.
An accurate layout is available at Signalmaps: https://signalmaps.co.uk/#cambridge_psb:3445

Platforms 1/2 allow trains to terminate from the Liverpool St side only, and return back to either line. Platforms 3/4 Allow trains from either line to terminate, but can only return back towards Royston (neither branch being bi-di signalled).

@takno - potentially one for the update list?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
I think you'll find it's 90 Max permissible through there. The 60 is shown as after Platform 3 ends (I appreciate there is no scale).
It's terribly drawn but reviewing the full image yes, it's 90mph on the down main until beyond the platform. I take it that it's 60mph 'correct direction' through each loop and 50mph 'wrong direction' on all platforms?

I don't suppose you have any idea why the standard directional symbology wasn't used?
1783005855811.png
 

WeGoAgain

Member
Joined
30 Apr 2014
Messages
124
Location
Cambs
It's terribly drawn but reviewing the full image yes, it's 90mph on the down main until beyond the platform. I take it that it's 60mph 'correct direction' through each loop and 50mph 'wrong direction' on all platforms?

I don't suppose you have any idea why the standard directional symbology wasn't used?
View attachment 207069
IIRC, departing Plt 1 is 50. So if going through non stop, drivers would need to slow their train before the 50 board.
The remainder of your assertion I believe to be correct.


And unfortunately not, no, sorry.
 