I'm currently on an Interrail trip - a 15-days-in-two-months pass split between two trips. Just sharing my experiences and observations, no particular structure.
Day 1 - London - Bremen
Eurostar 0704 London St Pancras - Brussels. Got held up at the Channel Tunnel entrance for about 15 minutes due to some traffic management system problems. The previous Paris train was apparently sat there for 40 minutes.
Pulled into Brussels with 7 minutes to spare for the 1025 to Colgone. Glad I moved myself to the front of the train. As I was getting off I could see about 20 passengers making the same run.
1025 ICE service to Colgone. There was line closure between Aachen and Cologne and my train was diverted (planned) with a double reversal at Aachen and Rheydt. It was a slightly painful diversion with a lot of crawling. Arrived into Cologne late.
Went to hide in Gaffel am Dom for a couple of refreshing Kolsch. Nice strong aircon for what was a very hot day.
ICE610 Cologne to Bremen.
The train left Cologne 30 minutes late and arrived at Bremen 120 minutes late. There were probably general heat related disruptions, and about 45 minutes of that delay was due to us being diverted via Rheine due to a broken down train between Muenster and Osnabrueck. What struck me was the quality of the infrastructure along the whole route which is just not set up to minimise knock-on delays.
For such a strategic inter-urban corridor (Rhien-Ruhr - Hamburg), there is negligible four-tracking. There is almost no 'uniform path railway' environment if you enter the network late, you can just slot in, drive at permissible speed and lose no further time. My train clocked up additional delays between Cologne and Dortmund. For some odd reason my train was routed via the platform line through Dusseldorf Airport station and we had to wait for the previous train to clear. Then we were checked at Essen Kray Sued and Wattenscheid. Dortmund - Muenster is single line.
The spaghetti of lines in the Rhine-Ruhr area isn't fit for purpose. At the very least they need to complete all the intended RRX work. Beyond that the area really needs a further layer of dedicated high-speed infrastructure enabling getting across and out of the conurbation quickly and without being slowed by Regional trains.
Day 1 - London - Bremen
Eurostar 0704 London St Pancras - Brussels. Got held up at the Channel Tunnel entrance for about 15 minutes due to some traffic management system problems. The previous Paris train was apparently sat there for 40 minutes.
Pulled into Brussels with 7 minutes to spare for the 1025 to Colgone. Glad I moved myself to the front of the train. As I was getting off I could see about 20 passengers making the same run.
1025 ICE service to Colgone. There was line closure between Aachen and Cologne and my train was diverted (planned) with a double reversal at Aachen and Rheydt. It was a slightly painful diversion with a lot of crawling. Arrived into Cologne late.
Went to hide in Gaffel am Dom for a couple of refreshing Kolsch. Nice strong aircon for what was a very hot day.
ICE610 Cologne to Bremen.
The train left Cologne 30 minutes late and arrived at Bremen 120 minutes late. There were probably general heat related disruptions, and about 45 minutes of that delay was due to us being diverted via Rheine due to a broken down train between Muenster and Osnabrueck. What struck me was the quality of the infrastructure along the whole route which is just not set up to minimise knock-on delays.
For such a strategic inter-urban corridor (Rhien-Ruhr - Hamburg), there is negligible four-tracking. There is almost no 'uniform path railway' environment if you enter the network late, you can just slot in, drive at permissible speed and lose no further time. My train clocked up additional delays between Cologne and Dortmund. For some odd reason my train was routed via the platform line through Dusseldorf Airport station and we had to wait for the previous train to clear. Then we were checked at Essen Kray Sued and Wattenscheid. Dortmund - Muenster is single line.
The spaghetti of lines in the Rhine-Ruhr area isn't fit for purpose. At the very least they need to complete all the intended RRX work. Beyond that the area really needs a further layer of dedicated high-speed infrastructure enabling getting across and out of the conurbation quickly and without being slowed by Regional trains.
Last edited:










