trainophile
Established Member
Lineside fire at Flint earlier today caused major disruption and cancellations, including my 14:22 from Chester. Should have been back in Hereford over two hours ago, just about to arrive now.
You appear to be in the minority of folk willing to pay for such a service.But we could do better, if we invested more in infrastructure and railway management and staff had a better attitude towards maintaining the service.
Entirely subjective, here....There are still only half the usual trains running from my local station today, even though the temperature is now back down in the mid-20s. That's poor.
May have telegraphed this one...Sorry but I’m not having that. Literally everyone I know in railway management and staff involved in service provison has been working their socks off this week. Given the constraints we have on the GB railway, and the intensity of which it is used, it has been extremely hard going.
In sure, sometimes, the railway can only remain open with these types of folk willing to do what's nessesary.Impressive to see track workers out at key locations on the WCML south these past few days.
On Wednesday was cautioned past Ledburn Junction which had a team of P-Way looking after it, and yesterday noticed a P-Way gang at Watford Junction with a track measuring gauge.
Completely agree. As non-staff I’ve seen some very challenging experiences this week with significant disruption and much longer journey times than usual, but you could tell that everyone - both front and back office - were trying their best to run what they can where they can. Tbh it makes a nice change to see everyone working together that way, it’s not often you can say it.The service has not been great these last few days, of course, and we can do better. But “attitude“ is not an issue.
Yes, the comms from HX have been appalling today. Not even providing basic information such as ticket acceptance or an ETA for resolution, and ignoring social media queries. No advisory to those who have booked HX tickets through their own website.It's not been mentioned here, but Heathrow (HAL) has been having a torrid time of it.
There's been a reduced service to Terminal 4 for the Elizabeth line since Tuesday, but for much of yesterday Terminals 2/3 were closed due to issues reportedly with sewage and right now Terminal 5 is closed due to some sort of water ingress issue. There's been an ongoing track circuit failure for days now too.
It's not entirely clear these are all related to the hot weather, but the timing is oddly convenient.
Heathrow Express have actually said very little other than "Due to an incident outside of our control..."
PS: I also love how this page seemingly deliberately has no reference to the Elizabeth line as an option at all, calling the Piccadilly line the "next quickest"!
Must say, that's a new one.Good of XC to provide you with an external temperature on their information system. Is it to let you know that it’s still cooler outside than onboard?
Photo is of the external display on a Class 220 Voyager stating “outside temp 32°C”
In addition to the planned cancellations there have been numerous cancellations throughout the day due to train faults.Northern have now binned off 300+ services on Saturday, where highs of 27°C are expected. Has a significant portion of the rolling stock failed over the last few days, such that it is not available for introduction tomorrow?
Some services look to be reinstated e.g. Rochdale to Blackburn
The Bluebell Railway is running the full planned steam service for Model Railway Weekend, but using 5MT 73082 Camelot vice Bulleid 34059 Sir Archibald Sinclair.Revisiting the topic of Heritage railways, Llangollen railway has cancelled their services.
Severn Valley has cut the number of steam locos in use as a preventive measure. It was due to be 4 steam and 1 diesel tomorrow (1940s weekend), now it is 2 steam and 3 diesels. The two steam remaining (4930 and 13268) are the most reliable in hot weather for not causing fires.
It’s off my area but I was told by a colleague who deals with the Eastern side that cancellations due to faults, often air-con have been perhaps the worst they’ve been today.Northern have now binned off 300+ services on Saturday, where highs of 27°C are expected. Has a significant portion of the rolling stock failed over the last few days, such that it is not available for introduction tomorrow?
Some services look to be reinstated e.g. Rochdale to Blackburn

Up in Glasgow/Strathclyde, the only major disruption I can see is the wires being brought down somewhere in the South Side (ScotRail cites it as being between Glasgow Central & Crossmyloof*) this morning, thus causing both Glasgow South Western/East Kilbride & Cathcart Circle timetables to more or less totally fall apart or be suspended outright (virtually nothing to/from Kilmarnock all day) for the rest of today. Going from this attached image, it's not looking like it's gonna be a quick fix and I wouldn't rate the chances of a full service operating on that part of the Glasgow network tomorrow very highly at all.
View attachment 206733
*: Going off of another image I found on Reddit, I'm fairly certain was a Central-bound 320 that brought them down just after passing Pollokshields East station. In that image if you look at the stanchion in the bottom-centre of the image beside the unit, you can see the supporting arm for the wires themselves have been bent backwards in the direction the train was going. Clearly the pantograph got snagged and took the knitting with it.
Do not travel messages are frowned upon by those in DfT apparently.
All trams in Sheffield have been withdrawn from service due to heat causing safety concerns.
Aye. Think replacing the 320's pantograph may end up taking longer lolEasy job. Will be runnign by the morning.
GWR website still has a cancellations on all routes warning currently (Saturday morning), even though some parts of its network were never in any red warning areas, and all west of Reading hasn't been red since Thursday.
I understand so far today 120+ cancellations and 60+ trains operating only part of the route.
So although very hot weather has finished, still seen to be struggling to get back to normality. Not great when earlier in week were asking passengers to defer journey to days including today. So really should be expecting both normal Saturday passengers and proportion of the deferred passengers. Thus if anything should be adding services, not cutting them.
Although modern railway is better in many ways, the pace of recovery from incidents seems to be getting slower and slower

But we are now back to normal summer month temperature ranges, so why is disruption continuing, that's the message the rail industry is failing to communicate to the public.Didcot stoppers part of KRS not to use points between Pad and Reading so they will either terminate at Reading or run fast Pad-Reading and same with Oxfords not running, all Worcester’s running relief line between Reading and Didcot as well along with a few other things
Except the simple answer is it still isn’t really ‘normal’ ranges where those points are. It’s expected to get up to around 31-32C in the Slough area.But we are now back to normal summer month temperature ranges, so why is disruption continuing, that's the message the rail industry is failing to communicate to the public.
I know members of this forum can (to the speciality audience) explain what happened during extreme heat, but no one seems to have a good explanation of why it didn't finish soon after red areas expired 12 hours ago. Sort of feels like railway isn't very good at recovering from its voluntary decision not to use certain points, but no one wants to admit it.
Logically if points are not to be used (fair enough during red weather) when decision was made to not use them, it doesn't seem like how the prompt restoration at end of red period was properly thought through, so now don't seem to be able to return to normal quickly. It's disjointed (or incompetent) planning, can take them out of service, without working out how to get them restarted promptly when the extreme part is over.
Bizarrely the Hadfield Line is back to full service, but the Rose Hill Marple services are notNorthern have now binned off 300+ services on Saturday, where highs of 27°C are expected. Has a significant portion of the rolling stock failed over the last few days, such that it is not available for introduction tomorrow?
Some services look to be reinstated e.g. Rochdale to Blackburn