I'm impressed with how quick the OLE went back up, as far as I'm aware headspans have extra complications compared to to other structures. Where's the OLE depot based for MML?
Also a real poke in the eye to those dinosaurs that wang on about how "back in my day...", a reminder that the railway engineers of the 21st century are just a skilled, dedicated and hard-working as their forebears. Fantastic.
Exactly, it's great to have a story of upmost competence from the modern rail industry, especially Network Rail who are so often have a bad narrative to their name.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Amos390

Member
Joined
22 Jan 2025
Messages
755
Location
Nottingham
Should it be full Working Timetable tomorrow then (proving the heat doesn't break anything else...)?
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,371
Location
Yorkshire
Fantastic work by everyone to make this happen from a standing start and in gruelling conditions. I've said before and I'll say again that the fella fronting up for Network Rail has been tremendous with their updates. Clear and concise but still giving you plenty of information. Brilliant. Also a real poke in the eye to those dinosaurs that wang on about how "back in my day...", a reminder that the railway engineers of the 21st century are just a skilled, dedicated and hard-working as their forebears. Fantastic.
Yes, absolutely agreed, a fantastic effort from all concerned.

This thread will be locked shortly as the line has reopened; if anyone has anything to add directly on the subject title, please post it soon.

For any other discussion, please use the relevant thread (or create a new one if appropriate).

Should it be full Working Timetable tomorrow then (proving the heat doesn't break anything else...)?
From the travel advice thread:
There's a full update on the Thameslink website with plans for the coming week (copied below, without the EMR bit). As the line is closed again next weekend, this means no trains between Luton and Bedford until Monday 29th at the earliest.
 

Amos390

Member
Joined
22 Jan 2025
Messages
755
Location
Nottingham
Not until Monday, as there are engineering works on Sat/Sun 27th/28th
Oh, fair enough, at first I would’ve thought it’d make sense for them to move forwards the engineering works whilst the line is shut anyways, but I suppose they have booked times for equipment and workmen
 

jthjth

Member
Joined
10 Apr 2015
Messages
382
Two trains worked down to St Pancras from Leicester, 1404 and 1504, then everything following is shown as only going to Bedford. Any ideas why?
 

CR165022

Established Member
Joined
12 Nov 2019
Messages
1,405
Location
Buckinghamshire
Two trains worked down to St Pancras from Leicester, 1404 and 1504, then everything following is shown as only going to Bedford. Any ideas why?
The two that went all the way to St Pancras (STP) were Very Short Term Plan (VSTP) services, so presumably they didn't expect to be able to run all the way through today, and already had the timetable in place for everything else to terminate at Bedford
 
Last edited by a moderator:

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,503
Location
DTOS A or B
The two that went all the way to STP were VST services, so presumably they didn't expect to be able to run all the way through today, and already had the timetable in place for everything else to terminate at Bedford
Test runs, and maybe to swap over any stranded units.
 

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,718
Location
Derby
Two trains worked down to St Pancras from Leicester, 1404 and 1504, then everything following is shown as only going to Bedford. Any ideas why?

Route proving runs. Only those two are running to London and back
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,503
Location
DTOS A or B
I'm impressed with how quick the OLE went back up, as far as I'm aware headspans have extra complications compared to to other structures. Where's the OLE depot based for MML?
Bedford OHLE team based in the grain store adjacent to Jowett sidings.

It's quite impressive as they have numerous test lines, including rigid bar.
 

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,718
Location
Derby
So do they accept passengers? They were showing on the Leicester Live Departures.
Yes they are taking passengers, but not widely advertised being the only two trains. Passengers for London for the rest of today can connect at Bedford onto Thameslink
 
Joined
5 Aug 2015
Messages
911
Location
Norfolk
Bedford OHLE team based in the grain store adjacent to Jowett sidings.

It's quite impressive as they have numerous test lines, including rigid bar.
Interesting. Makes sense as Bedford is an MDU for NR East Mids, at least they're not too far away from the site. I suppose once upon a time it was destined for Derby (which I think is the only other MDU in East Mids) to have an OLE depot too
 

Amos390

Member
Joined
22 Jan 2025
Messages
755
Location
Nottingham
It would appear that 810016 did not manage to make the return journey north (1Z54), presumably just an on-train issue and not as a result of the works, but not a great look so far
 

800002

Member
Joined
19 Jun 2019
Messages
1,128
The two that went all the way to St Pancras (STP) were Very Short Term Plan (VSTP) services, so presumably they didn't expect to be able to run all the way through today, and already had the timetable in place for everything else to terminate at Bedford

Very Short Term planning. I.e. they put the plan in place at short notice to run to STP.
Operators have strict deadlines with Network Rail capacity planning (as experienced this week with various e.ergency plans).
A for C, bid on day 1 to operate on day 3 is pretty much the latest the 'conventional' system operates to. It must also be with NR by 1000 on day A.

Anything else is VSTP, as described. Usually by 2200 the day before, until there and then as required to run on tbe day - direct to the signal centre / ROC.

Fluid situations like these can't be 'planned for' other than by the on the day / day before process.
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,810
Location
West is best
Yes, well done to all involved in dealing with the accident, investigating it, the recovery and the repairs to the railway infrastructure. Especially given the very hot weather over the last week.
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,503
Location
DTOS A or B
Interesting. Makes sense as Bedford is an MDU for NR East Mids, at least they're not too far away from the site. I suppose once upon a time it was destined for Derby (which I think is the only other MDU in East Mids) to have an OLE depot too

Look here of the side of ford end road bridge and you can see the test area they have.
 
Joined
5 Aug 2015
Messages
911
Location
Norfolk

Look here of the side of ford end road bridge and you can see the test area they have.
1782512449208.png
As promised, a mock up ROC (rigid overhead conductor)!
Although, it's not visible in any streetview after 2020, instead it looks like the have a normal SI to work on
1782512570718.png
I'm surprised that there's only 2 MDUs in East Mids and that neither are especially close to London. I think there are overhead line depots in Hornsey and Romford (for East Coast and Anglia), but if something should go wrong at St Pancras, do they have to wait on a team from Bedford?
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,503
Location
DTOS A or B
View attachment 206738
As promised, a mock up ROC (rigid overhead conductor)!
Although, it's not visible in any streetview after 2020, instead it looks like the have a normal SI to work on
View attachment 206739
I'm surprised that there's only 2 MDUs in East Mids and that neither are especially close to London. I think there are overhead line depots in Hornsey and Romford (for East Coast and Anglia), but if something should go wrong at St Pancras, do they have to wait on a team from Bedford?
It's still there in the second picture, but shorter and over the right hand side near the trains.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
I'm surprised that there's only 2 MDUs in East Mids and that neither are especially close to London. I think there are overhead line depots in Hornsey and Romford (for East Coast and Anglia), but if something should go wrong at St Pancras, do they have to wait on a team from Bedford?

Yes, although they can ask for assistance from Willesden / Hornsey
 

Vexed

Member
Joined
12 Jan 2020
Messages
659
Location
Herts / Hants
A couple of the recovered coaches were seen on the A6 south of Derby earlier.
I saw another couple of coaches making their way north on the M1 today around Northampton. They were wrapped up so not 100% sure, but it was the same style of wrapping as what I've seen of drone photos at Elstow.
 

442Haz

Member
Joined
9 Sep 2013
Messages
62
Exceptional work from all involved, RAIB, NR, the TOCs and no doubt the public who have on the whole been understanding in this process. Well done all
 