First seen on X, it appears as though 195 working 1Y14 had been incorrectly routed onto the line from Barrow Hill, whilst 4099 consisting of Class 66 on an Intermodal service service was directly in its path. Thankfully, the 66 was sat at a red signal, just ahead.

Credit to the original poster for the photos.

The pictures below show 195023 halfway across the points, with a view from both behind and in front of the train.
HLbF-HVW8AA0LCj

HLbF-KYXwAAkwbX
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

rower40

Member
Joined
1 Jan 2008
Messages
577
Note the state of the trailing points that the train is approaching. They’re lying ‘normal’. Unusual for them to be in that state if the facing points under the train are ‘reverse’.
 

bigmanaiq

Member
Joined
29 May 2025
Messages
99
Location
yorkshire
EMR describing at as a “points failure” on twitter


There is a points failure at Clay Cross continues. This is between Chesterfield and Derby and is disrupting our trains on the Liverpool/Manchester/Sheffield/Nottingham/Norwich route. Buses are running
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,672
Location
UK
Note the state of the trailing points that the train is approaching. They’re lying ‘normal’. Unusual for them to be in that state if the facing points under the train are ‘reverse’.
I should hope its a points failure as the signalling system shouldn't allow an unprotected move like this, even if the signaller attempts to set it.

What is the line speed?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,303
Yes indeed. How the one end of the crossover came to be in the reverse position with the other end normal will be key to this incident.
Quick reaction/observation skills by the driver, and a very well done for stopping as quick as they have.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,179
Location
LBK
At a guess I would presume it is already pinpointed as human error.
Has it? What would cause one set of points to be set for a route but not the other? Aren't they interlocked?
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,549
Location
Somewhere
Has it? What would cause one set of points to be set for a route but not the other? Aren't they interlocked?
Points failure and the signaler (or points operator) has not manually set or checked the points were laying correct before authorising the train to pass the signal at danger. As I said, just a guess but if the RAIB are not attending it doesn't sound like a system failure.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,303
Northern's 1Y27 Leeds to Nottingham has terminated at Chesterfield just now, staying points failure as the reason.
 

tpfx89

Member
Joined
1 Dec 2019
Messages
180
Location
Teesside
Points failure and the signaler (or points operator) has not manually set or checked the points were laying correct before authorising the train to pass the signal at danger. As I said, just a guess but if the RAIB are not attending it doesn't sound like a system failure.
Would it not still count as a dangerous occurrence? Difficult to argue against it looking at the photos?
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,492
Location
Moorpark, CA
Points failure and the signaler (or points operator) has not manually set or checked the points were laying correct before authorising the train to pass the signal at danger. As I said, just a guess but if the RAIB are not attending it doesn't sound like a system failure.
Certainly would appear that way. It never rains but it pours…..
 

D1511

Member
Joined
29 Jul 2023
Messages
1,199
Location
WCML N
Presumably RAIB would be there if the unit had run forward and hit the intermodal, so what's the difference here?
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,842
Allegedly there was a points failure requiring the points to be secured, but the points were clipped in the wrong position.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,443
Location
Isle of Man
RAIB will generally only investigate something if there are learning points to be gleaned from an incident.

In this case it may not be the case. It looks as though the train was running at a very slow speed and was able to stop immediately when it went over the points. So if the points were clipped due to a failure, and those points were clipped incorrectly, everything still worked as it should. Embarrassing, but no need for a huge investigation.
 

HC1998

Member
Joined
20 May 2017
Messages
26
What could’ve caused this? Incorrect pathing then driver applying brakes when they realised?
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,983
Location
Surrey
RAIB will generally only investigate something if there are learning points to be gleaned from an incident.

In this case it may not be the case. It looks as though the train was running at a very slow speed and was able to stop immediately when it went over the points. So if the points were clipped due to a failure, and those points were clipped incorrectly, everything still worked as it should. Embarrassing, but no need for a huge investigation.
NR will investigate it as a formal for something like this but wont be released into public domain.
 

saltywalrus

Member
Joined
21 May 2022
Messages
29
Location
Lancaster
What could’ve caused this? Incorrect pathing then driver applying brakes when they realised?
I don't believe that the interlocking would allow a route towards the freight train unless the line was bidirectionally signalled.

If the points failure that EMR reported occured before this incident and meant that the signaller was unable to set the correct route for the Northern train, then a MOM may be dispatched to set the points manually. I understand that this requires them to actuate the points to the correct position, then clip and scotch them to prevent them moving under the train. The MOM would inform the signaller when they had done this, and the signaller would then give the Northern driver permission to pass the signal at danger and travel over the points.

If this is the case I think the most likely scenario is that there was a communication breakdown between the MOM / signaller / driver which resulted in the driver passing the signal at danger when the points where not secured in the correct position, leading to the near miss.
 
Joined
30 Jan 2021
Messages
8
Location
GLASTONBURY
Really? How come?
RAIB can attend & investigate any incident or accident, but they are only legally obliged to investigate "serious accidents" — defined as including a train derailment or collision resulting in at least one death, five or more serious injuries, or extensive damage to rolling stock, the infrastructure, or the environment
 

RailwayRookie

Member
Joined
28 Jul 2023
Messages
268
Location
Norfolk
I don't believe that the interlocking would allow a route towards the freight train unless the line was bidirectionally signalled.
Varies by place but the interlocking will let the route be set regardless of signalling direction, it will be the signal interlocking itself that checks the occupation (or lack thereof) of the section ahead, then a valid route is set and then shows a proceed aspect.

Theoretically if the passenger train was 200 meters back and behind a signal, the signaller could route the trains into each other, but the signal wouldn't clear (if everything is working correctly)

Essentially what im saying is the signalling doesn't know which train will move next and so allows a route to be set as long as all other prerequisites for the route are met.
 

saltywalrus

Member
Joined
21 May 2022
Messages
29
Location
Lancaster
Varies by place but the interlocking will let the route be set regardless of signalling direction, it will be the signal interlocking itself that checks the occupation (or lack thereof) of the section ahead, then a valid route is set and then shows a proceed aspect.

Theoretically if the passenger train was 200 meters back and behind a signal, the signaller could route the trains into each other, but the signal wouldn't clear (if everything is working correctly)

Essentially what im saying is the signalling doesn't know which train will move next and so allows a route to be set as long as all other prerequisites for the route are met.
I more meant that if the line was only signalled in one direction, then the route from the signal protecting the points to the line occupied by the freight train wouldn't even be listed as a possible route in the interlocking.
 

TrainOnLine

Member
Joined
17 Aug 2010
Messages
15
Would some fault lie on the driver also if this is the case? Drivers are instructed to check position of points during an S5: Pass Signal At Danger.
 