Settle Station issues, who is responsible?

Ballyheigue

Member
Joined
11 Sep 2025
Messages
313
Location
Leeds
Noticed a few issues with Settle Station yesterday and wondered who is responsible for the upkeep of this station. Firstly a broken bench had been sealed off with hazard tape as it was a hazard, but more concerningly the footbridge is in a really bad state of repair, particularly the missing black grip ends creating a dip at the end of some steps which someone with poor eyesight/mobility could have a fall caused by the dip. The wood on the bridge looked to be in a poor state as well and it could do with a repaint. I found myself having to cautiously navigate the steps as felt they were unsafe.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,245
Location
Yorks
Presumably it will be Northern Rail. If not, they'll be able to point you in the right direction.
 

Ballyheigue

Member
Joined
11 Sep 2025
Messages
313
Location
Leeds
It's a bit confusing as the Settle Carlisle Partnership Company have some say in the running of some stations on the line such as Settle and Appleby
 

Lemmy99uk

Member
Joined
5 May 2015
Messages
558
Network Rail will be responsible for the condition of the footbridge. Doubt if it will be due a repaint for several years.
 

Geoffh73

On Moderation
Joined
2 Jan 2020
Messages
5
Location
Leeds

Ballyheigue

Member
Joined
11 Sep 2025
Messages
313
Location
Leeds
There are plans to refurbish the bridge, Network Rail recently received listed building consent from North Yorkshire Council.
That's good news but I think for safety reasons, the bridge needs closing and the barrow crossing needs to be used by the public all the time from now until the works are complete. Although the structure is not unsafe, it won't take much for someone to miss their footing on one of the missing stair grip edge pieces crashing into people on the way down.
 

CapabilityB

Member
Joined
27 Feb 2022
Messages
61
Location
York
That's good news but I think for safety reasons, the bridge needs closing and the barrow crossing needs to be used by the public all the time from now until the works are complete. Although the structure is not unsafe, it won't take much for someone to miss their footing on one of the missing stair grip edge pieces crashing into people on the way down.
And sending people across the track is safer!?
 

SuspectUsual

Established Member
Joined
11 Jul 2018
Messages
6,671
That's good news but I think for safety reasons, the bridge needs closing and the barrow crossing needs to be used by the public all the time from now until the works are complete. Although the structure is not unsafe, it won't take much for someone to miss their footing on one of the missing stair grip edge pieces crashing into people on the way down.

You think that’s more dangerous than having the public wandering across the track on a barrow crossing?!?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,307
Location
Somerset
You think that’s more dangerous than having the public wandering across the track on a barrow crossing?!?
Exactly - if someone has a fall in the bridge andit can be proved that it was down to the missing stair end grip, Network Rail will have a problem: if they close the bridge and people have to use the barrow crossing, they will have a problem if there is any incident at all (as the person would only be on the crossing because NR had closed the bridge).
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,154
How about skip-stopping Settle (Northbound only) and providing a Rail Replacement bus between Long Preston and Horton-in-Ribblesdale? Similar to the current arrangement at South Bank?!
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,928
Location
West Yorkshire/Tuscany
How about skip-stopping Settle (Northbound only) and providing a Rail Replacement bus between Long Preston and Horton-in-Ribblesdale? Similar to the current arrangement at South Bank?!
I realise that your post was probably tongue-in- cheek, but that would be a complete non-starter (or should I say 'non-stopper'? ;)). Hundreds - if not thousands - of coach tour passengers join Northbound trains at Settle every year....and they all have to troop over that footbridge, unless they are physically incapable of doing so, in which case they are escorted across the foot crossing by the station staff. What would be very useful would be a new entrance directly onto the Down platform from an adjacent new car and coach park....but, sadly, that isn't going to happen any time soon.
 

settlelad

Member
Joined
18 Jan 2026
Messages
25
Location
Settle
As someone has pointed out, the footbridge is due for some work (planning permission has been granted, noted above). A couple of years ago, 2023, when there was an attempt to close Settle ticket office along with lots of other station ticket offices), there were potentially issues with e.g. disabled access (where the footbridge wasn't practical) to the Carlisle bound platform for e.g. wheelchair access, as this had to be across the barrow crossing, and this was only available when the ticket office was open/staffed and this had fairly limited opening hours. As we now know, the ticket office closures did not happen. Additionally; the opening hours have been extended (https://www.cravenherald.co.uk/news/25777097.longer-opening-hours-settle-railway-station/), so this issue has been alleviated to some extent. Before that, if a Carlisle bound passenger needed to use the barrow crossing outside ticket office opening hours, they had to ring Northern, who would send a taxi from some far flung location for transport to the next station (Long Preston): necessary but not exactly ideal. I seem to recall seeing an old map where there was a footpath to the Carlisle bound platform from the rear of Goldielands/Prospect Terrace (don't have the said map to hand at present) but that wouldn't be realistic now. Getting direct access to the Carlisle bound platform from the public road would be tricky due to the steep drop as well. Someone suggested a new car and coach park for the Carlisle bound platform: this would probably be so far away as to be unfavourable due to the geography/geology, in addition the line corridor is a conservation area in its own right, and Settle is covered by quite a number of planning restrictions and on the edge of the national park, so it would take quite some head-scratching at the very least! If there was the will, it could be possible, but it would require jumping through many hoops! Maybe there could be a lift installed (tongue in cheek suggestion?) as has been recently done at Horton in Ribblesdale....
(Disclaimer: I have no connection with Northern Rail, Network Rail, or the Settle Carlisle Dev Co, and the above are only my observations)
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
It's a bit confusing as the Settle Carlisle Partnership Company have some say in the running of some stations on the line such as Settle and Appleby
It would be worth cc'ing them and FoSCL into your mail to the TOC and NR.
Northern manage the station even if NR own the asset.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,154
I realise that your post was probably tongue-in- cheek, but that would be a complete non-starter (or should I say 'non-stopper'?
Yes, was a semi-serious suggestion. Had wondered however if the running lines through Settle are bi-directionally signalled, but don't think the trackwork in the area allows 'wrong line' working and for Northbound trains to easily (or routinely) use platform 1.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,928
Location
West Yorkshire/Tuscany
Yes, was a semi-serious suggestion. Had wondered however if the running lines through Settle are bi-directionally signalled, but don't think the trackwork in the area allows 'wrong line' working and for Northbound trains to easily (or routinely) use platform 1.
Absolutely not, I'm afraid. Settle is mid-section on a line which is still worked by the traditional Absolute Block System. Since closure of the station's signalbox in the late 1970s/early 1980s there hasn't even been a trailing crossover....just a Down line and an Up line. The block section extends from Settle Junction - a couple of miles further South - to Blea Moor, with Intermediate Block Signals in the vicinity of Horton-in-Ribblesdale in each direction.
 

settlelad

Member
Joined
18 Jan 2026
Messages
25
Location
Settle
Absolutely not, I'm afraid. Settle is mid-section on a line which is still worked by the traditional Absolute Block System. Since closure of the station's signalbox in the late 1970s/early 1980s there hasn't even been a trailing crossover....just a Down line and an Up line. The block section extends from Settle Junction - a couple of miles further South - to Blea Moor, with Intermediate Block Signals in the vicinity of Horton-in-Ribblesdale in each direction.
I'm very unqualified, but I do remember a time, possibly about 10 years ago, when there was a longish temporary closure (some sort of engineering works) north of Settle, when somehow, there was a timetabled service Leeds to Settle and back, where the Leeds service terminated at Settle on the southbound platform, and then the service went back to Leeds. I think it was quite an innovative idea to keep the services going during the temporary closure between Settle and Leeds, and someone had enough energy and innovation to get it set up, and it involved some sort of clever crossing over (and obviously running "wrong way") from Settle junction, but it did happen. Details and memories are a little distant, but I did travel on it on more than one occasion.
 