Separate business cases for the Relief line upgrade, Burns stations, and Cardiff Parkway.Are they the same business case, or two separate ones?
Separate business cases for the Relief line upgrade, Burns stations, and Cardiff Parkway.Are they the same business case, or two separate ones?
Modern Railways this month has an analysis piece looking at the outcome of the Senedd elections. They point out that if the new Plaid government goes ahead with a relief road in Newport then the justification (in Benefit to Cost Ratio terms) for the Burns stations will collapse and they will likely be cancelled to free up money for the road.
Without closing it to traffic, (I find that hard to comprehend) they widened the tunnel from 2 Lanes to 4 Lanes - fascinating how it was done . .
Yep, induced demand is a reality we can't avoid,,,,build more roads get more cars. PS Cardiff really isn't getting a Metro in this phase...the valleys are. Cardiff needs the Metro treatment as well (min 4tph and new stations in areas of high demand)....a priority for the next phase.Widening roads doesn't solve traffic problems. It induces demand for car journeys, which makes traffic worse not better. Focusing on public transport is the right move, other cities and large towns in South Wales like Newport deserve a good metro just as much as Cardiff does.
Can be true but not always. Loads of roads (including new and widened ones) are not congested. And (some) induced traffic is good, if the project aim is to release or stimulate economic development. In the south east Wales case, given the nature of the traffic flows on the M4, public transport improvements will have a barely detectable effect. That said, efficient use of road space clearly requires (time and location specific) road user charges.Yep, induced demand is a reality we can't avoid,,,,build more roads get more cars. PS Cardiff really isn't getting a Metro in this phase...the valleys are. Cardiff needs the Metro treatment as well (min 4tph and new stations in areas of high demand)....a priority for the next phase.
Deputy transport minister Mark Hooper said the proposal for a new stretch of motorway bypassing Newport to the south “isn’t a credible option for us” and Plaid Cymru was “taking it off the table”.
The government will instead consider “all other road options” including junction closures, and Mr Hooper said the overall solutions to Newport’s M4 problems are “public transport focused” – in line with the Burns Commission’s recommendations in 2020.
Mr Hooper said he would report back to the Senedd in the autumn after working on “practical and deliverable alternatives” to a relief road.
Mark Hooper is the Deputy Minister for Transport. He answers to Adam Price, the Enterprise Minister.I am all in favour of the ‘Burns’ stations being built between Cardiff and Severn Tunnel Junction. However, if the powers that be think they are going to solve the choke point on the M4 at the Newport tunnel, they are living in cloud cuckoo land.
It sounds like the new Plaid Cymru government are more or less following the same policy as the previous Labour adminsistration regarding the M4 around Newport. Only small parts of the M4 black route would have crossed the so called ‘wet lands’ as most would have been through run down Newport docklands. They are not natural wet lands in any case but land drained long ago for farming. Had this lot been in control in Victorian times, presumably they would have stopped Brunel building the railway along the coastal plain in order to preserve wildlife?
Neither will doing up roads in south Newport to create the so called blue route work in attracting traffic off the current M4. It will also create problems for local traffic in south Newport - as will closing junctions on the present M4 in north Newport. Only the black route will work and any other schemes to solve the Newport M4 problem are money down the drain.
Mark Hooper is the Deputy Transport Minister but who is the actual Transport Minister in the new Welsh Government?
I am just stating the facts as I and lots of people see them. The only solution to solving the jammed up M4 at Newport is to build the black route - as recommended in the consultants report which cost £150 million of tax payers money only to be rejected by the Drakeford Labour administration.Mark Hooper is the Deputy Minister for Transport. He answers to Adam Price, the Enterprise Minister.
Many important wildlife sights are the result of human activity. Species have evolved to take advantage of the environments we have created. There's a reason the corn bunting and the house martin have the names they do.
In the case of the Gwent Levels, they were largely drained in Roman times so that's a 2,000 year old period where nature had adapted to a complex system of reens, pills, marshland and grazing.
People will have their own views on the desirability or otherwise of the black route but just sneering at people who happen to disagree with you is hardly productive.
I honestly don't disagree with much of that although, in the case of solar, the levels are probably quite a good option. There's barely any active agriculture there these days and well designed solar projects can co-exist with nature.I am just stating the facts as I and lots of people see them. The only solution to solving the jammed up M4 at Newport is to build the black route - as recommended in the consultants report which cost £150 million of tax payers money only to be rejected by the Drakeford Labour administration.
Today, with Take That & Belinda Carlisle at the Principality Stadium resulted in nose to tale traffic crawling along all the way from the Severn Bridge to the Newport tunnel. Even in normal times, this section of motorway is massively over crowded resulting in accidents - some with fatalities.
As I stated earlier, the amount of so called wetland taken up by a black route M4 is negligible as much of the road would have been through partly derelict industrial land. A greater risk to wildlife in Wales at the moment seems to be from allowing solar farms to cover vast areas of farmland - even though nuclear would still be needed as a back up. Wind turbines are popping up all over Wales yet I don't see these on the Cotswolds.
But that isnt a solution. Adding lanes / new roads never stops congestion. It just induces more demand. Build more lanes / a new road and we just have the same conversation 5 or 10 years later. We need to encourage modal shift not just allow more people to drive.The only solution to solving the jammed up M4 at Newport is to build the black route
Yes, I agree that we need to encourage modal shift but it is disappointing to read that building work on the ‘Burns’ stations won’t even start until 2029. They can’t even get Network Rail to build a walkway from Cogan station to link with the Pont Y Werin bridge to the ice rink and swimming pool on the western Bay shore in Cardiff. Victorian signalling and long block sections remains an issue on the Marches Line due to lack of funding by the UK Governments. Many rail projects on TFW routes remain on the to do list.But that isnt a solution. Adding lanes / new roads never stops congestion. It just induces more demand. Build more lanes / a new road and we just have the same conversation 5 or 10 years later. We need to encourage modal shift not just allow more people to drive.
When I worked in Newport (in 1969!) I remember hearing comments that there were too many junctions on the M4 and that too much local traffic was using it. I hadn't realised there had been a plan to close any.Indeed, one of the arguments against any plan to close M4 junctions around Newport is that drivers would have to drive on local roads to get on/off the motorway. (The M4 was originally built to the north of Newport in the 1960’s so as to provide good links to the valleys which faced industrial decline).
Not practically, you couldn't:You couldn’t widen Brynglas tunnels, though you could turn it into a (wider) cutting.

I think they will consider it once the first stage of Crossrail is built. It's currently only 2 buses an hour anyway and the route is pretty similar.Interesting question. At the moment "they" would be Cardiff Bus making I think a purely commercial decision.
Not entirely clear to me at the moment which will come first though - the new 398 services or bus franchising in Cardiff.
TrawsCymru only ever funded the service north of Merthyr Tydfil iirc the extension to Cardiff was a stagecoach commercial decision, now it's not run by stagecoach and also there's improved train services the commercial aspect probably doesn't add up.Off topic but I think they will consider [withdrawing the 6 bus to the bay] once the first stage of Crossrail is built. It's currently only 2 buses an hour anyway and the route is pretty similar.
TrawsCymru have cut back the T4 to Merthyr for a similar reason, it's duplicating an arguably better service and the trains are generally more reliable because they don't get stuck in traffic.
Buses should to an extent be filling in the gaps where trains don't or can't go, the 6 route currently does that because you can't get a train directly from Central to the Bay.
Further discussion on this is probably for the SW Metro thread.
A big missing piece is the lack of train and bus integration at Pontypridd, there's at least stops outside the station but I suspect a train station integrated into the bus station would be a big increase in connections.
Sorry, should have been clearer - my understanding is you can't widen the tunnels as the hill may come done if you tried (i.e. it's an engineering issue). Engineering-wise you could do a cutting, but IO would agree that practically not. Even the new M4 would probably be cheaper after allowing for compensation and a new access to Bryn Bevan.Not practically, you couldn't:
View attachment 206483
https://maps.app.goo.gl/DsH5YYfotLaNy5e77 (Link to pin for Brynglas tunnels showing multiple houses on top of the tunnels and the A404 interchange that would need demolition or reconstruction to widen the tunnels out to a cutting.
Is that actually a viable solution to all of the M4s problems though? Any metro service will be centred around train access to Cardiff City Centre.Best overall solution would still be proper Metro service between Cardiff and Abergavenny/Chepstow/Bristol
Why would having a different organisation in charge suddenly provide massively more capacity through Newport station?Best overall solution would still be proper Metro service between Cardiff and Abergavenny/Chepstow/Bristol. Which should be doable if we had Transport Scotland in charge...
Induced demand on rail is good because we need modal shift towards rail and away from roads.Surely the priority should be some proper rail based park and ride from the M4? Cardiff "parkway" doesn't really meet that need.
And on the M4 I totally agree that it desperately needs doing. Since I've moved to Cardiff it's probably the most shocking thing about infrastructure in South Wales and everyone I meet brings it up unprompted at some point. It's frankly a disgrace that a fully planned project was cancelled and getting on to a decade later even the railway stations (which I really question how much they would impact congestion) aren't even likely to be finished planning, nevermind construction.
I really don't understand how one poster above said it is only a problem a few times a year!? Even on weekends the traffic can be horrendous, and if you are going to Bristol airport I have to leave an extra hour to be safe because of potential congestion unless very off peak.
The impact this must have on the economic competitiveness of South Wales will be horrendous, especially for people trying to move goods.
Btw, I've also never quite understood why on railways induced demand is a massive positive but on roads it's a huge negative. I get it if it was US style sprawl but I don't think anyone can suggest that a 2 lane motorway is sufficient for ~1-2million people. If you compare it to other small European countries you'd probably have 4 lanes minimum
Well I'm assuming the logic is they'd be more likely to actually fund the improvements necessary. They seem quite good at getting routes between Glasgow and Edinburgh built for example (even if the services aren't perfectly ran).Why would having a different organisation in charge suddenly provide massively more capacity through Newport station?