EastWest
Member
Has rail traffic from Penyfford cement works finished now? The trains to Avonmouth don’t seem to have run for several weeks.
Has rail traffic from Penyfford cement works finished now?
The trains to Avonmouth don’t seem to have run for several weeks.
I think it's just down to being the time of year when demand for electricity is fairly low,
so Drax can get sufficient biomass from it's 'preferred' sources of Liverpool and Immingham.
There is still the odd train, like this one last Friday:
Realtime Trains | 6H12 0624 Tyne Coal Terminal Gbrf to Drax Aes (Gbrf) | 12/06/2026
Real-time train running information for 6H12 0624 departure from Tyne Coal Terminal Gbrf to Drax Aes (Gbrf) on 12/06/2026. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
...and Tyne Dock is still supplying several trains day of biomass to Lynemouth power station.
Penyffordd trains temporarily stopped in January (and switched to Ketton) due to equipment failure at the site, although if anyone can confirm there's been trackwork taking place, it'd be interesting to see.The exchange siding at Penyffordd are being expanded/fettled, hence the lack of traffic.
Stopped running last December, I'm afraid.Has the GBRf 4E04 Mossend Pd Sirling to Doncaster Iport Vv as 4S04 intermodal come to a end? Last info I know it ran last in Feb on the 14th then nothing since.
Ah that's a shame, thanks for the info thoughStopped running last December, I'm afraid.

As you may have heard, we’ve recently acquired the former CF Booth scrapyard site in Rotherham. It’s a 35 acre site with a main line rail connection, which opens up some great opportunities for how we move material around the country more efficiently (and more sustainably too).
It's an unlikely looking consist for an international working! It is good that it's not going in lorries.6X08 23.44 Dolland Moor-Hessle VaTTUK ran overnight behind 66121, caught a shot of it in a murky North Nottinghamshire this morning, carrying concrete sleepers and rails for pointwork to be assembled for HS2.
6X08 23.44 Dolland Moor-Hessle VaTTUK ran overnight behind 66121, caught a shot of it in a murky North Nottinghamshire this morning
It looks like the return path will be overnight too -
There's also an unusual move in for tomorrow - from Wellingborough to Scunthorpe Anchor, and then up to Tees Dock on Thursday. It's down as 'Metals' on RTT - scrap metal move, metals for export, or something else?
Shame no 25s or 40s are still around to move it.The new Energy from Waste plant at Lostock, Northwich is looking to use rail to take out 165,000 tonnes of ash per year from the site. This would use some of the infrastructure previously used for the limestone traffic from Tunstead to Lostock Works: https://www.northwichguardian.co.uk...=f9a2c12aaef6179bbcfc3782f5050d74&date=250626
....or ex-LMS vacuum-braked bogie hopper wagons!Shame no 25s or 40s are still around to move it.
This is a question for one of the TOPS requests threads, as it doesn’t talk about any actual freight flows, merely the short-notice diversion of one service.Today's 4L08 Doncaster - London Gateway seems to be diverting via Ely today. Does anyone know why? Thanks
Looks like it’s going down the ECML to me as booked, going to follow 9J63 1953 Horsham out of PeterboroughToday's 4L08 Doncaster - London Gateway seems to be diverting via Ely today. Does anyone know why? Thanks
Interesting, since last time I checked it was sat in Platform 5 at Peterborough, which can't access the Up London lines.Looks like it’s going down the ECML to me as booked, going to follow 9J63 1953 Horsham out of Peterborough
They can, by first going onto the (bidirectional) down fast and then onto the up at Fletton.Interesting, since last time I checked it was sat in Platform 5 at Peterborough, which can't access the Up London lines.
That shunt signal is LOS (meaning Limit of Shunt for those unaware, meaning no routes can be set from it)They can, by first going onto the (bidirectional) down fast and then onto the up at Fletton.
According to the raw Train Describer data, it actually left the yard and used platform one to access the Up SlowInteresting, since last time I checked it was sat in Platform 5 at Peterborough, which can't access the Up London lines.

Freightliner operate the London Gateway/Felixstowe to Coatbridge services.This has just appeared on social media, perhaps ahead of the launch of the Class 99 on services to Scotland from Felixstowe and London Gateway Port at least, not sure the strictly speaking Liverpool can be included as I don't think it operates six days a week.
View attachment 206709
MSC continue to operate feeder ship connections from Grangemouth and Greenock with the later served on the same service from Antwerp and Le Havre as Liverpool. This makes the inclusion of the later interesting given that Southampton is not shown, despite MSC operating into the port with it's feeder service and slot exchange on direct calls by it's partner lines ONE, Yang Ming and HMM to/from Asia in an agreement that lasts until February 2030. This might suggest MSC expects to expand it's Asia Europe service through Liverpool in the longer term, rather than the Solent port.
Freightliner operate the London Gateway/Felixstowe to Coatbridge services.
Dunno if it's still in the timetable but there was a 4S94 that already reserved the path for this.6S57 Hams Hall to Mossend is an ideal candidate for Class 99-haulage. Diesel to Walsall, then pan-up all the way to Mossend!
Dunno if it's still in the timetable but there was a 4S94 that already reserved the path for this.