Harlequinuk
On Moderation
Will there be any new freight locos that are tunnel compliant? Can battery bi mode be compliant?
I’m not sure the channel tunnel safety authority would be too jazzed about the fire risk of batteries, given the history of fires in the tunnel.Will there be any new freight locos that are tunnel compliant? Can battery bi mode be compliant?
Expect plenty of hybrid and electric cars go through every day?I’m not sure the channel tunnel safety authority would be too jazzed about the fire risk of batteries, given the history of fires in the tunnel.
Not with their engines on, though.Expect plenty of hybrid and electric cars go through every day?
Not with their engines on, though.
No would a train run with engines on, nor would there be any need to charge batteries.Not with their engines on, though.
There’s no need for anything other than a straight electric loco through the tunnel.No would a train run with engines on, nor would there be any need to charge batteries.
His analysis is not completely irrelevant - this is a regulatory issue not an engineering one. However, he does seem to not be privy to anything that isn't in the public domain, so any conclusions he reaches as to the viability of anything should be treated with a pinch of salt that he has zero railway operating or engineering experience directly. He has spoken to a lot of railway people since starting his blog though, so don't dismiss him as completely uninformed.Why should we care what Jon Worth thinks. He's got zero railway engineering experience: "I am not really a typical railway person. I do not work for a railway operator or a manufacturer, and I have never worked for a transport ministry. My background is in European Union political communication, not railways."
The fire survivability requirements for new rolling stock are clearly published.I’m not sure the channel tunnel safety authority would be too jazzed about the fire risk of batteries, given the history of fires in the tunnel.
No, but at either end the loco may want to go onto non-electrified track. A Battery-Electric loco would also allow for self-rescue in the event of a power failure or isolation in the tunnel.There’s no need for anything other than a straight electric loco through the tunnel.
The idea of running through at the English end is absolutely pointless - it's not been achieved to any real extent in the 30 years since the tunnel opened. Much better would be to run standard European electric locos (Vectron, TRAXX, Euro 6000 or whatever) through to Dollands Moor and change locos there. Far cheaper than a small production run of highly customised locos to UK gauge.No, but at either end the loco may want to go onto non-electrified track. A Battery-Electric loco would also allow for self-rescue in the event of a power failure or isolation in the tunnel.
A lot of the standard European electric locs also offer bi-mode versions with diesel which should be alright for emergency purposes.The idea of running through at the English end is absolutely pointless - it's not been achieved to any real extent in the 30 years since the tunnel opened. Much better would be to run standard European electric locos (Vectron, TRAXX, Euro 6000 or whatever) through to Dollands Moor and change locos there. Far cheaper than a small production run of highly customised locos to UK gauge.